PROJECT :-SIL FACTORY, PLOT NO - 2, SECTOR "D" AT BAGRODA

Quantity Sheet
Width/
Sr. Length Height/
Item Description No. Breadth
No. (M) (M) Depth (M)

1 Excavation of Earthwork for footing


(1.5m from GL)
(OFFICE AREA) GRID A-C TO 1-11 (33
Nos)
F-1 (2.4 x 2.4) 9 2.60 2.60 1.60
F-1 (2.95 x 2.4) 1 3.15 2.60 1.60
F-2 (2.9 x 2.0) 9 3.10 2.20 1.60
F-2 (1.8 x 2.6) 1 2.00 2.80 1.60
F-2 (2.9 x 2.6) 1 3.10 2.80 1.60
F-3 (2.2 x 1.8) 1 2.40 2.00 1.60
F-4 (1.0 x 1.0) 9 1.20 1.20 1.60
F-4 (1.35 x 1.0) 1 1.55 1.20 1.60
F-5 (1.0 x 1.0) 1 1.20 1.20 1.60
(CENTER AREA) GRID A-9 TO 1-11 (30
Nos)
F-1 (1.0 x 1.0) 25 1.20 1.20 1.60
F-3 (1.35 x 1.0) 5 1.55 1.20 1.60
F-2 (1.2 x 1.2) 2 1.40 1.40 1.60
(SHED AREA) GRID Q-Z1 TO 1-11
(121 Nos)
F-1 (3.0 x 1.8) 16 3.20 2.00 1.60
F-1 (2.3 x 3.0) 4 2.50 3.20 1.60
F-2 (2.2 x 2.8) 16 2.40 3.00 1.60
F-2 (2.5 x 2.8) 4 2.70 3.00 1.60
F-2' (2.2 x 2.8) 16 2.40 3.00 1.60
F-2' (2.5 x 2.8) 4 2.70 3.00 1.60
F-3 (2.0 x 3.0) 2 2.20 3.20 1.60
F-4 (1.8 x 3.0) 4 2.00 3.20 1.60
F-5 (1.2 x 1.5) 5 1.40 1.70 1.60
F-5 (1.2 x 2.0) 5 1.40 2.20 1.60
F-6 (1.2 x 1.2) 35 1.40 1.40 1.60
F-6 (1.5 x 1.2) 10 1.70 1.40 1.60
STONE MASONRY WALL
(CENTER AREA) 1 180.00 0.60 1.00
(SHED AREA) 1 155.00 0.60 1.00
Total Excavation

2 M-10 P. C. C. for footing (100mm thick)


(OFFICE AREA) GRID A-C TO 1-11 (33
Nos)
F-1 (2.4 x 2.4) 9 2.60 2.60 0.10
F-1 (2.95 x 2.4) 1 3.15 2.60 0.10
F-2 (2.9 x 2.0) 9 3.10 2.20 0.10
F-2 (1.8 x 2.6) 1 2.00 2.80 0.10
F-2 (2.9 x 2.6) 1 3.10 2.80 0.10
F-3 (2.2 x 1.8) 1 2.40 2.00 0.10
F-4 (1.0 x 1.0) 9 1.20 1.20 0.10
F-4 (1.35 x 1.0) 1 1.55 1.20 0.10
F-5 (1.0 x 1.0) 1 1.20 1.20 0.10
(CENTER AREA) GRID A-9 TO 1-11 (30
Nos)
F-1 (1.0 x 1.0) 25 1.20 1.20 0.10
F-3 (1.35 x 1.0) 5 1.55 1.20 0.10
F-2 (1.2 x 1.2) 2 1.40 1.40 0.10
(SHED AREA) GRID Q-Z1 TO 1-11
(121 Nos)
F-1 (3.0 x 1.8) 16 3.20 2.00 0.10
F-1 (2.3 x 3.0) 4 2.50 3.20 0.10
F-2 (2.2 x 2.8) 16 2.40 3.00 0.10
F-2 (2.5 x 2.8) 4 2.70 3.00 0.10
F-2' (2.2 x 2.8) 16 2.40 3.00 0.10
F-2' (2.5 x 2.8) 4 2.70 3.00 0.10
F-3 (2.0 x 3.0) 2 2.20 3.20 0.10
F-4 (1.8 x 3.0) 4 2.00 3.20 0.10
F-5 (1.2 x 1.5) 5 1.40 1.70 0.10
F-5 (1.2 x 2.0) 5 1.40 2.20 0.10
F-6 (1.2 x 1.2) 35 1.40 1.40 0.10
F-6 (1.5 x 1.2) 10 1.70 1.40 0.10
STONE MASONRY WALL
(CENTER AREA) 1 200.00 0.60 0.10
(SHED AREA) 1 200.00 0.60 0.10
Total M-10 P. C. C. for footing

3 M-10 P. C. C. for Slab (100mm thick)


(OFFICE AREA) GRID A-C TO 1-11 12.8 64 0.1
Total M-10 P. C. C. for Slab

4 Earth Filling (Up to Plinth Level)


Back Filling for footing (up ro GL)
(OFFICE AREA) GRID A-C TO 1-11 12.8 73 2.4
(CENTER AREA) GRID A-9 TO 1-11 101.2 73 2.6
(SHED AREA) GRID Q-Z1 TO 1-11 75 73 2.6
Total Earth Filling
DA

Quantity

97.34 Cum
13.10 Cum
98.21 Cum
8.96 Cum
13.89 Cum
7.68 Cum
20.74 Cum
2.98 Cum
2.30 Cum

57.60 Cum
14.88 Cum
6.27 Cum

163.84 Cum
51.20 Cum
184.32 Cum
51.84 Cum
184.32 Cum
51.84 Cum
22.53 Cum
40.96 Cum
19.04 Cum
24.64 Cum
109.76 Cum
38.08 Cum

108.00 Cum
93.00 Cum
1487.32 Cum
6.08 Cum
0.82 Cum
6.14 Cum
0.56 Cum
0.87 Cum
0.48 Cum
1.30 Cum
0.19 Cum
0.14 Cum

3.60 Cum
0.93 Cum
0.39 Cum

10.24 Cum
3.20 Cum
11.52 Cum
3.24 Cum
11.52 Cum
3.24 Cum
1.41 Cum
2.56 Cum
1.19 Cum
1.54 Cum
6.86 Cum
2.38 Cum

12.00 Cum
12.00 Cum
104.40 Cum

81.92 Cum
81.92 Cum

497.01 Cum
2242.56 Cum
19207.76 Cum
14235.00 Cum
36182.33 Cum
PROJECT :-SIL FACTORY, PLOT NO - 2, SECTOR "D" AT BAGRODA
Quantity Sheet
Width/
Sr. Length Height/
Item Description No. Breadth
No. (M) (M) Depth (M)

1 Reinforcmemt in footing
(OFFICE AREA) GRID A-C TO 1-11 (33
Nos)
F-1 (2.4 x 2.4) 146 9
F-1 (2.95 x 2.4) 174 1
F-2 (2.9 x 2.0) 189 9
F-2 (1.8 x 2.6) 157 1
F-2 (2.9 x 2.6) 237 1
F-3 (2.2 x 1.8) 136 1
F-4 (1.0 x 1.0) 28 9
F-4 (1.35 x 1.0) 35 1
F-5 (1.0 x 1.0) 28 1
(CENTER AREA) GRID A-9 TO 1-11 (30
Nos)
F-1 (1.0 x 1.0) 24 25
F-3 (1.35 x 1.0) 29 5
F-2 (1.2 x 1.2) 30 2
(SHED AREA) GRID Q-Z1 TO 1-11
(121 Nos)
F-1 (3.0 x 1.8) 270 16
F-1 (2.3 x 3.0) 329 4
F-2 (2.2 x 2.8) 355 16
F-2 (2.5 x 2.8) 395 4
F-2' (2.2 x 2.8) 355 16
F-2' (2.5 x 2.8) 395 4
F-3 (2.0 x 3.0) 348 2
F-4 (1.8 x 3.0) 270 4
F-5 (1.2 x 1.5) 69 5
F-5 (1.2 x 2.0) 86 5
F-6 (1.2 x 1.2) 34 35
F-6 (1.5 x 1.2) 40 10
Total Reinforcmemt in footing

2 Reinforcmemt in column (up


to Plinth Level)
(OFFICE AREA) GRID A-C TO 1-11 (36
Nos)
C-1 (0.7 x 0.5) 283 24
C-2 (0.3 x 0.3) 93 12
(CENTER AREA) GRID A-9 TO 1-11 (35
Nos)
C-1 (0.3 x 0.5) 74 35
C-2 (0.45 x 0.5) 173 2
(SHED AREA) GRID Q-Z1 TO 1-11
(169 Nos)
C-1 (1.2 x 0.6) 359 22
C-2 (1.0 x 0.45) 247 44
C-3 (1.2 x 0.6) 359 4
C-4 (1.0 x 0.6) 313 8
C-5 (0.35 x 0.65) 166 10
C-6 (0.3 x 0.3) 98 81
Total Reinf. in column (up to PL)

3 Reinforcmemt in column
(Above Plinth Level)
(OFFICE AREA) GRID A-C TO 1-11 (36
Nos)
C-1 (0.7 x 0.5) 321 24
Total Reinf. in column (above PL)

4 Reinforcmemt in Plinth Beam


(OFFICE AREA) GRID A-C TO 1-11 17.2 345.6
(CENTER AREA) GRID A-9 TO 1-11 28.0 210
(SHED AREA) GRID Q-Z1 TO 1-11 28.0 1849
Total Reinforcmemt in Plinth Beam

5 Reinforcmemt in RCC Slab at PL


(SHED AREA) GRID Q-Z1 TO 1-11 4.1 75 73
Total Reinforcmemt in RCC Slab at PL

6 D. P. C. Steel
(CENTER AREA) GRID A-9 TO 1-11 3 211
2.5 211
2.5 211
(SHED AREA) GRID Q-Z1 TO 1-11 3 223
2.5 223
2.5 223
Total DPC Steel

7 Reinforcmemt in Rcc Beam (1st Slab)


(OFFICE AREA) GRID A-C TO 1-11 160 20
170 10
Total Reinforcmemt in Rcc Beam (1st Slab)
8 Reinforcmemt in PT Beam (1st Slab)
(OFFICE AREA) GRID A-C TO 1-11 516 12
Total Reinforcmemt in PT Beam (1st Slab)

9 Reinforcmemt in RCC Slab (1st slab)


(OFFICE AREA) GRID A-C TO 1-11 12.3 66 12.6
Total Reinforcmemt in RCC Slab (1st slab)

10 HTS in PT Beam (1st Slab)


(OFFICE AREA) GRID A-C TO 1-11 170 12
Total Reinforcmemt in PT Beam (1st Slab)
DA

Quantity

1314.00 Kg
174.00 Kg
1701.00 Kg
157.00 Kg
237.00 Kg
136.00 Kg
252.00 Kg
35.00 Kg
28.00 Kg

600.00 Kg
145.00 Kg
60.00 Kg

4320.00 Kg
1316.00 Kg
5680.00 Kg
1580.00 Kg
5680.00 Kg
1580.00 Kg
696.00 Kg
1080.00 Kg
345.00 Kg
430.00 Kg
1190.00 Kg
400.00 Kg
29136.00 Kg

6792.00 Kg
1116.00 Kg
2590.00 Kg
346.00 Kg

7898.00 Kg
10868.00 Kg
1436.00 Kg
2504.00 Kg
1660.00 Kg
7938.00 Kg
43148.00 Kg

7704.00 Kg
7704.00 Kg

5944.00 Kg
5880.00 Kg
51772.00 Kg
63596.00 Kg

22448.00 Kg
22448.00 Kg

633.00 Kg
527.50 Kg
527.50 Kg
669.00 Kg
557.50 Kg
557.50 Kg
3472.00 Kg

3200.00 Kg
1700.00 Kg
4900.00 Kg
6192.00 Kg
6192.00 Kg

10229.00 Kg
10229.00 Kg

2040.00 Kg
2040.00 Kg
PROJECT :-SIL FACTORY, PLOT NO - 2, SECTOR "D" AT BAGRODA
Quantity Sheet
Width/
Sr. Length Height/
Item Description No. Breadth
No. (M) (M) Depth (M)

1 M25 Concrete in footing


(OFFICE AREA) GRID A-C TO 1-11 (33
Nos)
F-1 (2.4 x 2.4) 9 2.40 2.40 0.35
9 0.80 0.60 0.10
Truncated pyramid 0.33 9 5.76 0.48 0.35
F-1 (2.95 x 2.4) 1 2.95 2.40 0.35
1 0.80 0.60 0.10
Truncated pyramid 0.33 1 7.08 0.48 0.35
F-2 (2.9 x 2.0) 9 2.90 2.00 0.40
9 0.80 0.60 0.10
Truncated pyramid 0.33 9 5.80 0.48 0.35
F-2 (1.8 x 2.6) 1 1.80 2.60 0.40
1 0.80 0.60 0.10
Truncated pyramid 0.33 1 4.68 0.48 0.35
F-2 (2.9 x 2.6) 1 2.90 2.60 0.40
1 0.80 0.60 0.10
Truncated pyramid 0.33 1 7.54 0.48 0.35
F-3 (2.2 x 1.8) 1 2.20 1.80 0.40
1 0.80 0.60 0.10
Truncated pyramid 0.33 1 3.96 0.48 0.35
F-4 (1.0 x 1.0) 9 1.00 1.00 0.50
9 0.40 0.40 0.10
F-4 (1.35 x 1.0) 1 1.35 1.00 0.50
1 0.40 0.40 0.10
F-5 (1.0 x 1.0) 1 1.00 1.00 0.50
1 0.40 0.40 0.10
(CENTER AREA) GRID A-9 TO 1-11 (30
Nos)
F-1 (1.0 x 1.0) 25 1.00 1.00 0.30
25 0.60 0.40 0.10
Truncated pyramid 0.33 25 1.00 0.24 0.20
F-3 (1.35 x 1.0) 5 1.35 1.00 0.30
5 0.60 0.40 0.10
Truncated pyramid 0.33 5 1.35 0.24 0.20
F-2 (1.2 x 1.2) 2 1.20 1.20 0.30
2 0.60 0.55 0.10
Truncated pyramid 0.33 2 1.44 0.33 0.30
(SHED AREA) GRID Q-Z1 TO 1-11
(121Nos)
F-1 (3.0 x 1.8) 16 3.00 1.80 0.55
16 2.00 1.00 0.35
F-1 (2.3 x 3.0) 4 2.30 3.00 0.55
4 1.50 2.00 0.35
F-2 (2.2 x 2.8) 16 2.20 2.80 0.55
16 1.00 1.60 0.35
F-2 (2.5 x 2.8) 4 2.50 2.80 0.55
4 1.30 1.60 0.35
F-2' (2.2 x 2.8) 16 2.20 2.80 0.55
16 1.00 1.80 0.35
F-2' (2.5 x 2.8) 4 2.50 2.80 0.55
4 1.30 1.80 0.35
F-3 (2.0 x 3.0) 2 2.00 3.00 0.55
2 1.50 2.00 0.40
F-4 (1.8 x 3.0) 4 1.80 3.00 0.55
4 1.00 1.30 0.40
F-5 (1.2 x 1.5) 5 1.20 1.50 0.50
F-5 (1.2 x 2.0) 5 1.20 2.00 0.50
F-6 (1.2 x 1.2) 35 1.20 1.20 0.40
F-6 (1.5 x 1.2) 10 1.50 1.20 0.40
Total M25 Concrete in footing

2 M25 Concrete in column


(up to Plinth Level)
(OFFICE AREA) GRID A-C TO 1-11 (36
Nos)
C-1 (0.7 x 0.5) 24 0.7 0.5 3.2
C-2 (0.3 x 0.3) 12 0.3 0.3 3.6
(CENTER AREA) GRID A-9 TO 1-11 (35
Nos)
C-1 (0.3 x 0.3) 35 0.3 0.3 3.6
C-2 (0.45 x 0.3) 2 0.45 0.3 3.6
(SHED AREA) GRID Q-Z1 TO 1-11
(169 Nos)
C-1 (1.2 x 0.6) 22 1.2 0.6 3.25
C-2 (1.0 x 0.45) 44 1 0.45 3.25
C-3 (1.2 x 0.6) 4 1.2 0.6 3.25
C-4 (1.0 x 0.6) 8 1 0.6 3.25
C-5 (0.35 x 0.65) 10 0.35 0.65 3.6
C-6 (0.3 x 0.3) 81 0.3 0.3 3.7
Total Conc. in column (up to PL)

3 M25 Concrete in column


(above Plinth Level)
(OFFICE AREA) GRID A-C TO 1-11 (36
Nos)
C-1 (0.7 x 0.5) 24 0.7 0.5 5
Total Conc. in column (above PL)

4 M25 Concrete in Plinth Beam


(OFFICE AREA) GRID A-C TO 1-11 345.6 0.3 0.4
(CENTER AREA) GRID A-9 TO 1-11 210 0.3 0.5
(SHED AREA) GRID Q-Z1 TO 1-11 1666 0.3 0.4
Total M25 Concrete in Plinth Beam

5 M25 Concrete in RCC Slab at PL


(SHED AREA) GRID Q-Z1 TO 1-11 75 73 0.1
Total M25 Concrete in RCC Slab at PL

6 D. P. C. Concrete
(CENTER AREA) GRID A-9 TO 1-11 211 0.50 0.1
211 0.23 0.1
211 0.33 0.1
(SHED AREA) GRID Q-Z1 TO 1-11 223 0.50 0.1
223 0.23 0.1
223 0.33 0.1
Total DPC Concrete

7 M25 Concrete in Rcc Beam (1st Slab)


(OFFICE AREA) GRID A-C TO 1-11 20 5.4 0.3 0.45
10 5.6 0.3 0.45
Total M25 Concrete in Rcc Beam (1st Slab)

8 M25 Concrete in RCC Slab (1st slab)


(OFFICE AREA) GRID A-C TO 1-11 20 5.6 5.95 0.175
Total M25 Concrete in RCC Slab (1st slab)

9 M35 Concrete in PT Beam (1st Slab)


(OFFICE AREA) GRID A-C TO 1-11 9.7 12 0.5
Total M25 Concrete in PT Beam (1st Slab)
DA

Quantity

18.14 Cum
0.43 Cum
8.30 Cum
2.48 Cum
0.05 Cum
1.10 Cum
20.88 Cum
0.43 Cum
8.35 Cum
1.87 Cum
0.05 Cum
0.78 Cum
3.02 Cum
0.05 Cum
1.16 Cum
1.58 Cum
0.05 Cum
0.68 Cum
4.50 Cum
0.14 Cum
0.68 Cum
0.02 Cum
0.50 Cum
0.02 Cum

7.50 Cum
0.60 Cum
2.88 Cum
2.03 Cum
0.12 Cum
0.72 Cum
0.86 Cum
0.07 Cum
0.49 Cum
47.52 Cum
11.20
15.18 Cum
4.20
54.21 Cum
8.96
15.40 Cum
2.91
54.21 Cum
10.08
15.40 Cum
3.28
6.60 Cum
2.40
11.88 Cum
2.08
4.50 Cum
6.00 Cum
20.16 Cum
7.20 Cum
393.90 Cum

26.88 Cum
3.89 Cum

11.34 Cum
0.97 Cum

51.48 Cum
64.35 Cum
9.36 Cum
15.60 Cum
8.19 Cum
26.97 Cum
219.03 Cum
42.00 Cum
42.00 Cum

41.47 Cum
31.50 Cum
199.92 Cum
272.89 Cum

547.50 Cum
547.50 Cum

10.55 Cum
4.85 Cum
6.96 Cum
11.15 Cum
5.13 Cum
7.36 Cum
46.00 Cum

14.58 Cum
7.56 Cum
22.14 Cum

116.62 Cum
116.62 Cum

58.20 Cum
58.20 Cum
PROJECT :-SIL FACTORY, PLOT NO - 2, SECTOR "D" AT BAGRODA
Quantity Sheet
Width/
Sr. Length Height/
Item Description No. Breadth
No. (M) (M) Depth (M)

17 Shuttering in footing
(OFFICE AREA) GRID A-C TO 1-11 (33
Nos)
F-1 (2.4 x 2.4) 4 9 2.40 0.70
F-1 (2.95 x 2.4) 2 1 2.95 0.70
2 1 2.40 0.70
F-2 (2.9 x 2.0) 2 9 2.90 0.75
2 9 2.00 0.75
F-2 (1.8 x 2.6) 2 1 1.80 0.75
2 1 2.60 0.75
F-2 (2.9 x 2.6) 2 1 2.90 0.75
2 1 2.60 0.75
F-3 (2.2 x 1.8) 2 1 2.20 0.75
2 1 1.80 0.75
F-4 (1.0 x 1.0) 4 9 1.00 0.50
F-4 (1.35 x 1.0) 2 1 1.35 0.50
2 1 1.00 0.50
F-5 (1.0 x 1.0) 4 1 1.00 0.50
(CENTER AREA) GRID A-9 TO 1-11 (30
Nos)
F-1 (1.0 x 1.0) 4 25 1.00 0.50
F-3 (1.35 x 1.0) 2 5 1.35 0.60
2 5 1.00 6.00
F-2 (1.2 x 1.2) 4 2 1.20 0.50
(SHED AREA) GRID Q-Z1 TO 1-11
(121Nos)
F-1 (3.0 x 1.8) 2 16 3.00 0.55
2 16 1.80 0.55
2 16 2.00 0.35
2 16 1.00 0.35
F-1 (2.3 x 3.0) 2 4 2.30 0.55
2 4 3.00 0.55
2 4 1.50 0.35
2 4 2.00 0.35
F-2 (2.2 x 2.8) 2 16 2.20 0.55
2 16 2.80 0.55
2 16 1.00 0.35
2 16 1.60 0.35
F-2 (2.5 x 2.8) 2 4 2.50 0.55
2 4 2.80 0.55
2 4 1.30 0.35
2 4 1.60 0.35
F-2' (2.2 x 2.8) 2 16 2.20 0.55
2 16 2.80 0.55
2 16 1.00 0.35
2 16 1.80 0.35
F-2' (2.5 x 2.8) 2 4 2.50 0.55
2 4 2.80 0.55
2 4 1.30 0.35
2 4 1.80 0.35
F-3 (2.0 x 3.0) 2 2 2.00 0.55
2 2 3.00 0.55
2 2 1.50 0.40
2 2 2.00 0.40
F-4 (1.8 x 3.0) 2 4 1.80 0.55
2 4 3.00 0.55
2 4 1.00 0.40
2 4 1.30 0.40
F-5 (1.2 x 1.5) 2 5 1.20 0.50
2 5 1.50 0.50
F-5 (1.2 x 2.0) 2 5 1.20 0.50
2 5 2.00 0.50
F-6 (1.2 x 1.2) 4 35 1.20 0.40
F-6 (1.5 x 1.2) 2 10 1.50 0.40
2 10 1.20 0.40
Total Shuttering in footing

18 Shuttering in column (up


to Plinth Level)
(OFFICE AREA) GRID A-C TO 1-11 (36
Nos)
C-1 (0.7 x 0.5) 2 24 0.7 3.2
2 24 0.5 3.2
C-2 (0.3 x 0.3) 4 12 0.3 3.6
(CENTER AREA) GRID A-9 TO 1-11 (35
Nos)
C-1 (0.3 x 0.3) 4 35 0.3 3.6
C-2 (0.45 x 0.3) 2 2 0.45 3.6
2 2 0.3 3.6
(SHED AREA) GRID Q-Z1 TO 1-11
(169 Nos)
C-1 (1.2 x 0.6) 2 22 1.2 3.25
2 22 0.6 3.25
C-2 (1.0 x 0.45) 2 44 1 3.25
2 44 0.45 3.25
C-3 (1.2 x 0.6) 2 4 1.2 3.25
2 4 0.6 3.25
C-4 (1.0 x 0.6) 2 8 1 3.25
2 8 0.6 3.25
C-5 (0.35 x 0.65) 2 10 0.35 3.6
2 10 0.65 3.6
C-6 (0.3 x 0.3) 4 81 0.3 3.7
Total Shutteringin column (up to PL)

18 Shuttering in column
(above Plinth Level)
(OFFICE AREA) GRID A-C TO 1-11 (36
Nos)
C-1 (0.7 x 0.5) 2 24 0.7 5
2 24 0.5 5
Total Shutteringin column (above PL)

19 Shuttering in Plinth Beam


(OFFICE AREA) GRID A-C TO 1-11 2 345.6 0.4
(CENTER AREA) GRID A-9 TO 1-11 2 210 0.5
(SHED AREA) GRID Q-Z1 TO 1-11 2 811 0.5
Shuttering in Plinth Beam

19 Shuttering in RCC Beam (1st Slab)


(OFFICE AREA) GRID A-C TO 1-11 20 5.4 1.2
10 5.6 1.2
Shuttering in RCC Beam (1st Slab)

19 Shuttering in PT Beam (1st Slab)


(OFFICE AREA) GRID A-C TO 1-11 22.5 12
Shuttering in PT Beam (1st Slab)

19 Shuttering in RCC Slab (1st Slab)


(OFFICE AREA) GRID A-C TO 1-11 20 5.6 5.95
Shuttering in RCC Slab (1st Slab)
DA

Quantity

60.48 Sqm
4.13 Sqm
3.36 Sqm
39.15 Sqm
27.00 Sqm
2.70 Sqm
3.90 Sqm
4.35 Sqm
3.90 Sqm
3.30 Sqm
2.70 Sqm
18.00 Sqm
1.35 Sqm
1.00 Sqm
2.00 Sqm

50.00 Sqm
8.10 Sqm
60.00 Sqm
4.80 Sqm

52.80 Sqm
31.68 Sqm
22.40 Sqm
11.20 Sqm
10.12 Sqm
13.20 Sqm
4.20 Sqm
5.60 Sqm
38.72 Sqm
49.28 Sqm
11.20 Sqm
17.92 Sqm
11.00 Sqm
12.32 Sqm
3.64 Sqm
4.48 Sqm
38.72 Sqm
49.28 Sqm
11.20 Sqm
20.16 Sqm
11.00 Sqm
12.32 Sqm
3.64 Sqm
5.04 Sqm
4.40 Sqm
6.60 Sqm
2.40 Sqm
3.20 Sqm
7.92 Sqm
13.20 Sqm
3.20 Sqm
4.16 Sqm
6.00 Sqm
7.50 Sqm
6.00 Sqm
10.00 Sqm
67.20 Sqm
12.00 Sqm
9.60 Sqm
914.72 Sqm

107.52 Sqm
76.80 Sqm
51.84 Sqm
0.00 Sqm

151.20 Sqm
6.48 Sqm
4.32 Sqm
0.00 Sqm

171.60 Sqm
85.80 Sqm
286.00 Sqm
128.70 Sqm
31.20 Sqm
15.60 Sqm
52.00 Sqm
31.20 Sqm
25.20 Sqm
46.80 Sqm
359.64 Sqm
1631.90 Sqm

168.00 Sqm
120.00 Sqm
288.00 Sqm

276.48 Sqm
210.00 Sqm
811.00 Sqm
1297.48 Sqm

129.60 Sqm
67.20 Sqm
196.80 Sqm

270.00 Sqm
270.00 Sqm

666.40 Sqm
666.40 Sqm
PROJECT :-SIL FACTORY, PLOT NO - 2, SECTOR "D" AT BAGRODA
Quantity Sheet
Width/
Sr. Length Height/
Item Description No. Breadth
No. (M) (M) Depth (M)

1 Stone Masonry (up to Plinth Level)


(CENTER AREA) 200 0.6 0.6
200 0.5 0.6
200 0.4 1.9
(SHED AREA) 200 0.6 0.6
200 0.5 0.6
200 0.4 1.9
Total Stone Masonry

2 Brick Masonry (Above Stone wall )


(CENTER AREA) GRID A-9 TO 1-11 200 0.23 2
(SHED AREA) GRID Q-Z1 TO 1-11 200 0.23 2
Total Brick Masonry (Above Stone wall )

3 Brick Masonry (above Plinth level )


(OFFICE AREA) GRID A-C TO 1-11 130.8 0.23 3.55
Total Brick Masonry(above Plinth level )

4 Plaster in Brick Masonry (Above Stone


wall )
(CENTER AREA) GRID A-9 TO 1-11 2 200 2
(SHED AREA) GRID Q-Z1 TO 1-11 2 200 2
Total Plaster in Brick Masonry (Above Stone wall )

5 Plaster in Brick Masonry (above Plinth


level )
(OFFICE AREA) GRID A-C TO 1-11 2 154 4
Total Plaster in Brick Masonry (above Plinth level )
DA

Quantity

72.00 Cum
60.00 Cum
152.00 Cum
72.00 Cum
60.00 Cum
152.00 Cum
568.00 Cum

92.00 Cum
92.00 Cum
184.00 Cum

106.80 Cum
106.80 Cum

800.00 Sqm
800.00 Sqm
1600.00 Sqm

1232.00 Sqm
1232.00 Sqm
PROJECT :-SIL FACTORY, PLOT NO - 2, SECTOR "D" AT BAGRODA
Quantity Sheet
Sr. Item Description Quantity
No.
1 Excavation 1487.32 Cum

M-10 P. C. C. for footing 104.40 Cum


2
M-10 P. C. C. for Slab 81.92 Cum
Total 186.32 Cum

Shuttering in footing 914.72 Sqm


Shuttering in column (up to PL) 1631.90 Sqm
Shuttering in column (above PL) 288.00 Sqm
3 Shuttering in Plinth Beam 1297.48 Sqm
Shuttering in RCC Beam (1st Slab) 196.80 Sqm
Shuttering in PT Beam (1st Slab) 270.00 Sqm
Shuttering in Slab (1st Slab) 666.40 Sqm
Total 5265.30 Sqm

M25 Concrete in footing 393.90 Cum


M25 Concrete in column (up to PL) 219.03 Cum
M25 Concrete in column (above PL) 42.00 Cum
M25 Concrete in Plinth Beam 272.89 Cum
4
M25 Concrete in RCC Slab at PL 547.50 Cum
M25 Concrete in DPC 46.00 Cum
M25 Concrete in RCC Beam (1st Slab) 22.14 Cum
M25 Concrete in Slab (1st Slab) 116.62 Cum
Total 1660.08 Cum

5 M35Concrete in PT Beam 58.20 Cum

Reinforcmemt in footing 29136.00 Kg


Reinf. in column (up to PL) 43148.00 Kg
Reinforcmemtin in column (above PL) 7704.00 Kg
Reinforcmemt in Plinth Beam 63596.00 Kg
6 Reinforcmemt in RCC Slab at PL 22448.00 Kg
DPC Steel 3472.00 Kg
Reinforcmemtin in RCC Beam (1st Slab) 4900.00 Kg
Reinforcmemtin in PT Beam (1st Slab) 6192.00 Kg
Reinforcmemtin in RCC Slab (1st Slab) 10229.00 Kg
Total 190825.00 Kg

7 HTS in PT Beam 2040.00 Kg


8 Earth Filling 36182.33 Cum

9 Stone Masonry 568.00 Cum

Brick Masonry (Above Stone wall ) 184.00 Cum


10
Brick Masonry (Above Plinth Level) 106.80 Cum
Total 290.80 Cum

Plaster in Brick Masonry (Above Stone wall ) 1600.00 Sqm


11
Plaster in Brick Masonry (Above Plinth Level) 1232.00 Sqm
Total 2832.00 Sqm
PROJECT :-
Quantity Sheet
Sr. Item Description Quantity
No.
Excavation for Pile Cum
1
Excavation for footing Cum
Total Cum

2 M-10 P. C. C. for footing Cum


Total Cum

Shuttering in footing Sqm


Shuttering in column (up to PL) Sqm
Shuttering in column (above PL) Sqm
Shuttering in Plinth Beam Sqm
3
Shuttering in RCC Beam (Mid Lvl) Sqm
Shuttering in RCC Beam (1st Slab) Sqm
Shuttering in PT Beam (1st Slab) Sqm
Shuttering in Slab (1st Slab) Sqm
Total Sqm

M25 Concrete in footing Cum


M25 Concrete in column (up to PL) Cum
M25 Concrete in column (above PL) Cum
M25 Concrete in Plinth Beam Cum
4 M25 Concrete in RCC Slab at PL Cum
M25 Concrete in DPC Cum
M25 Concrete in RCC Beam (Mid Lvl) Cum
M25 Concrete in RCC Beam (1st Slab) Cum
M25 Concrete in Slab (1st Slab) Cum
Total Cum

5 M35Concrete in PT Beam Cum

Reinforcmemt in footing Kg
Reinf. in column (up to PL) Kg
Reinforcmemtin in column (above PL) Kg
Reinforcmemt in Plinth Beam Kg
6 Reinforcmemt in RCC Beam (Mid Lvl) Kg
DPC Steel Kg
Reinforcmemtin in RCC Beam (1st Slab) Kg
Reinforcmemtin in PT Beam (1st Slab) Kg
Reinforcmemtin in RCC Slab (1st Slab) Kg
Total Kg

7 HTS in PT Beam Kg

8 Earth Filling Cum

9 Stone Masonry Cum

Brick Masonry (Above Stone wall ) Cum


10
Brick Masonry (Above Plinth Level) Cum
Total Cum

Plaster in Brick Masonry (Above Stone wall ) Sqm


11
Plaster in Brick Masonry (Above Plinth Level) Sqm
Total Sqm