Typical Data Sheet For Well Pad Power Transformer

This datasheet provides technical specifications for two power transformers rated at 80 MVA each that will be used for the Garraf Final Development Plan offsite facilities substation. The transformers will have a primary voltage of 33kV and secondary voltage of 6.9kV. They will be outdoor transformers installed under a sun shade with cooling type ONAN/ONAF. The document outlines key details like insulation levels, temperature rise ratings, tap changer specifications, and protective requirements.

Uploaded by

Haider Hassan
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
262 views

Typical Data Sheet For Well Pad Power Transformer

This datasheet provides technical specifications for two power transformers rated at 80 MVA each that will be used for the Garraf Final Development Plan offsite facilities substation. The transformers will have a primary voltage of 33kV and secondary voltage of 6.9kV. They will be outdoor transformers installed under a sun shade with cooling type ONAN/ONAF. The document outlines key details like insulation levels, temperature rise ratings, tap changer specifications, and protective requirements.

Uploaded by

Haider Hassan
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

Internal Ctrl. No.

: 461116-100127-43636-0004
Doc No:
GFDP-107-52-ELE-DS-GE-004
PETRONAS
Date:
07-Jul-2014

Rev: Page
Typical Datafor
Datasheet sheet forTransformer
Power Well Pad Power Transformers
for GIFT Offsite Facilities Substation
2 1 of 9

DATASHEETTYPICAL
FOR POWER
DATA TRANSFORMER FOR
SHEET FOR WELL GIFT
PAD OFFSITE
POWER FACILITIES SUBSTATION
TRANSFORMERS

FOR

GARRAF FINAL DEVELOPMENT PLAN (GFDP)

Revision No. Revision Description Date of Issue


2 Issued for Bid 07-Jul-2014

Prepared By Reviewed By Approved By


Revision No.
Initials Date Init
Initials Date Init
Initials Date
2 TMT 07-Jul-2014 BT/
TRRSA
BT/RSA 07-Jul-2014 A
AE 07-Jul-2014

PROJECT DOCUMENTS ARE CONTROLLED DOCUMENTS.

Class 1
Internal Ctrl. No.: 461116-100127-43636-0004

GARRAF FINAL DEVELOPMENT PLAN (GFDP)

Document No.: GFDP-107-52-ELE-DS-GE-004


Revision : 2
Page : 2 of 9

Typical Dataforsheet
Datasheet Powerfor Well Pad Power
Transformer for GIFTTransformers
Offsite Facilities Substation

REVISION HISTORY

Rev. Date Description of Change


A 15-Jul-13 Issued for Review

0 18-Dec-13 Issued for Bid, changed to replace 132kV incomer with 33kV

1 27-Apr-14 Issued for Bid, changed to incorporate PIR comments


Internal Ctrl. No.: 461116-100127-43636-0004

GARRAF FINAL DEVELOPMENT PLAN (GFDP)

Document No.: GFDP-107-52-ELE-DS-GE-004


Revision : 2
Page : 3 of 9

Typical Data
Datasheet forsheet
Powerfor Well Pad for
Transformer Power
GIFTTransformers
Offsite Facilities Substation

1 SERVICE: ITEM No.: N/A QTY: 2


2 P.O NUMBER SIZE:
3 INFORMATION BY BUYER
4 A APPLICABLE REFERENCE DOCS
5 1 SPECIFICATION GFDP-COM-52-ELE-SP-GE-005
6 2 MANUFACTURING STANDARD IEC 60076
7 3 TRANSFORMER TAG NO. TR-OFS-B-01, TR-OFS-B-02
8

9 B SERVICE / SITE CONDITION


10 1 SERVICE/APPLICATION POWER TRANSFORMER
11 2 DESIGN AMBIENT TEMP. ( MAXIMUM / MINIMUM ) 55°C/-5°C
12 3 ALTITUDE ABOVE M.S.L. 3m
13 4 MIN - MAX RELATIVE HUMIDITY 0% - 90%
14 5 SEISMIC ZONE IBC 2012 SITE CLASS D
15

16 C AREA CLASSIFICATION
17 1 SAFE / HAZARDOUS SAFE
18 2 INDOOR / OUTDOOR OUTDOOR, UNDER SUN SHADE
19

20 D SYSTEM CHARACTERISTICS
21 1 PRIMARY SYSTEM:
22 VOLTAGE 33kV ±10%
23 NO. OF PHASES / WIRE 3 PHASE / 3 WIRE
24 SYSTEM GROUNDING SOLID GROUNDING
25 SYMMETRICAL FAULT LEVEL (R.M.S) 40 kA FOR 3 SEC
26 2 SECONDARY SYSTEM:
27 VOLTAGE (FULL LOAD) 6.9kV
33kV
28 NO. OF PHASES / WIRE 3 PHASE / 3 WIRE
29 SYSTEM GROUNDING SOLID GROUNDING
30

31 E TECHNICAL PARTICULARS
32 1 RATING As/ 100
80 perMVA
SLD
33 2 NO. OF PHASES THREE
34 3 VOLTAGE RATIO : PRIMARY / SECONDARY 33 / 34.5kV
35 4 VECTOR GROUP Dyn 11
36 5 FREQUENCY 50Hz ±2%
37 6 % IMPEDANCE VOLTAGE *18% @100MVA
38 7 TYPE OF COOLING ONAN/ONAF
KNAN / KNAF
39 8 INSTALLATION OUTDOOR UNDER SUN SHADE
40 9 INSULATION LEVEL
41 10 a) FOR IMPULSE TEST PRY-170kV, SRY-170kV AS PER IEC 60076
42 b) FOR POWER FREQUENCY PRY-70kV, SRY-70kV rms AS PER IEC 60076
43 11 TEMPERATURE RISE:
44 a) WINDING 50°C OVER 55°C AMBIENT (HOT SPOT)
45 b) OIL 45°C OVER 55°C AMBIENT
46 12 TYPE OF TRANSFORMER (CONSERVATOR / SEALED) CONSERVATOR
47 13 TAP CHANGER : HV SIDE OffLOAD
ON Circuit
48 RANGE OF TAPS / STEPS ±10% IN STEPS OF 1.25% (17 TAPS)
49 ON LOAD TAP CHANGER : AUTO & MANUAL BOTH
50 OIL DRAIN VALVE REQUIRED
51 BUCCHOLZ RELAY REQUIRED
52 OLTC PANEL NA
REQUIRED FOR REMOTE OPERATION
53 14 PROTECTIVE CT's
54 HV SIDE : (PRIMARY) NOT APPLICABLE
55 MV SIDE : (SECONDARY) APPLICABLE
NOT APPLICABLE
56 MV SIDE : (NEUTRAL) APPLICABLE
57
Internal Ctrl. No.: 461116-100127-43636-0004

GARRAF FINAL DEVELOPMENT PLAN (GFDP)

Document No.: GFDP-107-52-ELE-DS-GE-004


Revision : 2
Page : 4 OF 9

Typical Data
Datasheet forsheet
Powerfor Well Pad for
Transformer Power
GIFT Transformers
Offsite Facilities Substation

1 SERVICE: ITEM No.: N/A QTY: 2


2 P.O NUMBER SIZE:

3 INFORMATION BY BUYER

4 15 CT-5 RATIO 2000/1A

5 ACCURACY CLASS, BURDEN 5P20, 20VA

6 CT-6 RATIO 2000/1A

7 ACCURACY CLASS, BURDEN CL-X

8 16 MOUNTING OF CT's (LOCATION) :

9 HV SIDE NOT APPLICABLE

10 MV SIDE NEUTRAL TERMINAL BOX

11 17 VOLTAGE OF ALARM AND TRIP CONTACTS 230V AC

12 18 VOLTAGE OF MARSHALLING BOX SPACE HEATER (IF REQUIRED) 230V AC

13

14 F CONSTRUCTION

15 1 TERMINAL BOX ARRANGEMENT ON SIDE WALLS OF TRANSFORMER, IP55, 180° ORIENTATION

16 2 PRIMARY TERMINAL TYPE (33kV) AIR FILLED CABLE BOX WITH DISCONNECTING CHAMBER

17 CABLE / CONDUCTOR SIZE (SEE NOTE-6)

18 BUSHING TERMINAL CONNECTORS AND ACCESSORIES REQUIRED

19 BUCHHOLZ RELAY (FOR HV CABLE BOX) NOT REQUIRED

20 3 PRIMARY BUSHING TYPE (33kV) PORCELAIN TYPE

21 VOLTAGE CLASS & RATED CURRENT 33kV & 2000A

22 CREEPAGE DISTANCE AS PER IEC 60071, Part 2

23 IMPULSE & POWER FREQUENCY WITH STAND VOLTAGE AS


170kVPER
/ 70kV IEC 60071

24 ADDITIONAL BUSHING FOR NEUTRAL EARTHING NOT APPLICABLE

25 (6.6kV)
4 SECONDARY TERMINAL TYPE (33kV) AIR FILLED BOX SUITABLE FOR BUSDUCT TERMINATION

26 BUSDUCT RATING 2000A, 25kA, 3 SEC

27 BUSHING TERMINAL CONNECTORS AND ACCESSORIES REQUIRED

28 5 SECONDARY BUSHING TYPE (6.6kV)


(33kV) PORCELAIN TYPE

29 VOLTAGE CLASS & RATED CURRENT (6.6kV


33kV & 200A)
& 2000A

30 CREEPAGE DISTANCE AS PER IEC 60071, Part 2

31 IMPULSE & POWER FREQUENCY WITH STAND VOLTAGE AS PER


170kV / 70kV IEC 60071
32 ADDITIONAL BUSHING FOR NEUTRAL EARTHING PORCELAIN TYPE

33 VOLTAGE CLASS & RATED CURRENT TO BE FURNISHED BY VENDOR

34 CREEPAGE DISTANCE AS PER IEC 60071, Part 2

35 IMPULSE & POWER FREQUENCY WITH STAND VOLTAGE AS PER


170kV / 70kV IEC 60071
36 EARTH CONDUCTOR SIZE (SEE NOTE-6)

37 6 PAINTING TYPE AND SHADE RAL 7035

38 7 NOISE LEVEL AS PER IEC 60076

39 8 FITTINGS & ACCESSORIES (MINIMUM) BUCCHOLZ RELAY WITH ALARM AND TRIP CONTACTS

40 WINDING TEMPERATURE INDICATOR WITH ALARM AND TRIP CONTACT

41 OIL TEMPERATURE INDICATOR WITH ALARM AND TRIP CONTACT

42 PRESSURE RELIEF VALVE WITH TRIP CONTACT

43 MAGNETIC OIL LEVEL GAUGE WITH ALARM CONTACT

44 SILICA GEL BREATHER

45 DRAIN/SAMPLING VALVE

46 FILTER VALVE

47 CONSERVATOR DRAIN VALVE

48 AIR BAG FOR CONSERVATOR

49 BUCCHOLZ RELAY WITH ALARM & TRIP CONTACTS FOR OLTC

50 THERMOMETER POCKET WITH CAP

51 TAP CHANGER WITH POSITION INDICATOR & PADLOCK FACILITIES

52 MARSHALLING BOX, IP55

53 JACKING PADS, LIFTING/PULLING LUGS, STEEL LADDER

54 EARTH BOSS, RATING PLATE

55
56
Internal Ctrl. No.: 461116-100127-43636-0004

GARRAF FINAL DEVELOPMENT PLAN (GFDP)

Document No.: GFDP-107-52-ELE-DS-GE-004


Revision : 2
Page : 5 OF 9

Typical Data
Datasheet for sheet
Power for Well Padfor
Transformer Power Transformers
GIFT Offsite Facilities Substation

1 SERVICE: ITEM No.: N/A QTY: 2

2 P.O NUMBER SIZE:


3 9 TYPE OF OIL NON TOXIC, SYNTHETIC MINERAL OIL
4 10 BI-DIRECTIONAL RAILWHEEL / ROLLER BI-DIRECTIONAL ROLLERS WITH SKID UNDERBASE
5 11 SURGE ARRESTORS REQUIRED ON PRIMARY SIDE
6

7 G INSPECTION & TESTING


8 1 ROUTINE TESTS REQUIRED, AS PER GFDP-COM-52-ELE-SP-GE-005
9 2 TYPE TESTS AS PER GFDP-COM-52-ELE-SP-GE-005
10 3 SPECIAL TESTS AS PER GFDP-COM-52-ELE-SP-GE-005
11 4 FAT REQUIRED, AS PER GFDP-COM-52-ELE-SP-GE-005
12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43
44
45

46

47

48

49

50

51

52

53

54
55
Internal Ctrl. No.: 461116-100127-43636-0004

GARRAF FINAL DEVELOPMENT PLAN (GFDP)

Document No.: GFDP-107-52-ELE-DS-GE-004


Revision : 2
Page : 6 OF 9

Typical Data
Datasheet forsheet
Powerfor Well Pad for
Transformer Power
GIFTTransformers
Offsite Facilities Substation

1 SERVICE: ITEM No.: N/A QTY: 2

2 P.O NUMBER SIZE:


3 INFORMATION BY VENDOR
4 A GENERAL
5 1 MANUFACTURER NAME (*)
6 2 COUNTRY OF ORIGIN (*)
7 3 GOVERNING MANUFACTURING STANDARD (*)
8 4 TRANSFORMER SERIES NAME (*)
9 5 TYPE TESTED TRANSFORMER ( YES / NO) (*)
10 6 LIST OF TYPE TEST WITH DATE OF VALIDITY (*)
11 7 NAME OF TESTING AUTHORITY (*)
12

13 B TECHNICAL DATA & CONSTRUCTION


14 1 RATED kVA AS PER IEC - 60076 (*) kVA
15 2 CONTINUOUS MAXIMUM RATING FOR SITE CONDITIONS (*) kVA
16 3 NO LOAD VOLTAGE RATIO (*)
17 4 VECTOR GROUP REFERENCE (*)
18 5 NO LOAD LOSSES AT RATED VOLTAGE (*) kW
19 6 LOAD LOSSES AT RATED CURRENT, 75ºC (*) kW
20 7 RESISTANCE VOLTAGE (AT RATED kVA, 75ºC & 50 Hz) (*) %
21 8 REACTANCE VOLTAGE (AT RATED kVA, 75ºC & 50 Hz) (*) %
22 9 IMPEDANCE VOLTAGE (AT RATED kVA, 75ºC & 50 Hz) (*) +-%
23 10 RESISTANCE OF WINDING, AT 75ºC (*)
24 a) HIGH VOLTAGE PER PHASE Ohms
25 b) LOW VOLTAGE PER PHASE Ohms
26 11 ZERO PHASE SEQUENCE IMPEDANCE ( ESTIMATED ) (*) %
27 12 EFFICIENCY ( AT 75ºC ) AT FULL LOAD (*) %
28 a) 1 PF
29 b) 0.8PF LAG
30 13 EFFICIENCY AT 50% LOAD (*) %
31 14 LOAD AT WHICH MAXIMUM EFFICIENCY OCCURS (*) kW
32 15 MAXIMUM EFFICIENCY (*) %
33 16 CONSERVATOR TYPE OF TRANSFORMER (YES / NO) (*)
34 17 PERCENTAGE REGULATION AT FULL LOAD (*)
35 a) 1 PF %
36 b) 0.8PF LAG %
37 18 EXCITING CURRENT REFERRED TO PRIMARY, 50 Hz (*)
38 a) 90 % RATED VOLTAGE A
39 b) 100 % RATED VOLTAGE (NO LOAD CURRENT) A
40 c) 110 % RATED VOLTAGE A
41 19 POWER FACTOR OF EXCITING CURRENT AT RATED VOLTAGE AND 50 Hz (*)
42 20 MAGNETISING INRUSH CURRENT ( PEAK ) UNDER WORSE CONDITIONS OF RESIDUAL (*) A
43 MAGNETISM & INSTANT OF SWITCHING
44 21 SYMMETRICAL SHORT-CIRCUIT CURRENT (ASSUME INFINITE SOURCE) (*) kA
45 22 TIME OF WITHSTAND WITHOUT INJURY UNDER MAX. SYMM. SHORT CIRCUIT CONDITION (*) Sec
46 23 THERMAL TIME CONSTANT (*) Hrs
47 24 X/R RATIO (*)
48 25 MAXIMUM FLUX DENSITY IN CORE AT RATED VOLTAGE (*) K.Lines /CM2
49 26 CURRENT DENSITY AT RATED LOAD (*)
50 a) HV WINDING A / mm2
51 b) LV WINDING A / mm2
52 27 TYPE OF WINDING (*)
53 a) HIGH VOLTAGE
54 b) LOW VOLTAGE
55
Internal Ctrl. No.: 461116-100127-43636-0004

GARRAF FINAL DEVELOPMENT PLAN (GFDP)

Document No.: GFDP-107-52-ELE-DS-GE-004


Revision : 2
Page : 7 OF 9

Typical Data
Datasheet for sheet
Power for Well Padfor
Transformer Power Transformers
GIFT Offsite Facilities Substation

1 SERVICE: ITEM No.: N/A QTY: 2

2 P.O NUMBER SIZE:


3 INFORMATION BY VENDOR
4 28 IMPULSE LEVELS WITH 1.2/50 MICRO-SECOND WAVE FORM (*)
5 a) HIGH VOLTAGE kV
6 b) LOW VOLTAGE kV
7 29 ONE MINUTE POWER FREQUENCY WITHSTAND VOLTAGE (*)
8 a) PRIMARY kV
9 b) SECONDARY kV
10 30 PARAMETERS FOR OLTC (*)
11 a) RATED VOLTAGE kV
12 b) RATED CURRENT A
13 c) SEPARATE CONSERVATOR TANK FOR OLTC
14 d) QUANTITY OF OIL IN OLTC CHAMBER Litres
15 e) DEHYDRATING DEVICE FOR OLTC CONSERVATOR
16 31 TYPE OF COOLING (*)
17 32 QUANTITY OF COOLING FANS (NOS. OF WORKING & STANDBY) (*)
18 33 TOTAL WEIGHT WITH OIL & ACCESSORIES (*) kg
19 34 CORE AND WINDING WEIGHT (*) kg
20 35 TANK AND FITTING WEIGHT (*) kg
21 36 RADIATOR WITHOUT OIL WEIGHT (*) kg
22 37 QUANTITY OF OIL IN RADIATORS (*) Litres
23 38 VOLUME OF OIL FOR COMPLETE FILLING (*) Litres
24 39 APPROXIMATE OVERALL DIMENSIONS ( L x W x H ) (*) mm
25 40 TYPE OF MOUNTING ( SKID / ROLLERS) (*)
26 41 NOISE LEVEL (*) dB
27 42 MINIMUM CLEARANCE HEIGHT FOR LIFTING CORE & WINDING FROM TANK (*) mm
28 43 FREE SPACE REQUIRED AT THE TOP FOR REMOVAL OF ACCESSORIES INCLUDING BUSHING (*) mm
29

30 C TANK
31 1 MATERIAL OF TANK (*)
32 2 MATERIAL OF RADIATOR (*)
33 3 THICKNESS OF SIDES / COVER / BOTTOM OF TANK PLATES (*) mm
34 4 VACUUM WITHSTAND CAPACITY OF :
35 MAIN TANK (*)
36 RADIATORS (*)
37

38 D TRANSFORMER MARSHALLING BOX


39 1 LOCATION (*)
40 2 ENCLOSURE (*)
41 3 CANOPY (*)
42 4 TERMINALS (*)
43 5 OTHER REQUIREMENTS (*)
44 6 WIRING / DRESSING OF WIRING (*)
45

46 E OLTC PANEL (FOR LOCAL OPERATION)


47 1 TYPE (*)
48 2 LOCATION (*)
49 3 MANUFACTURER (*)
50 4 TAP CHANGER WITH POSITION INDICATOR AND PADLOCK FACILITIES (*)
51 5 MANUAL / AUTOMATIC MODE SELECTOR (*)
52 6 MANUAL RAISE / LOWER PUSH BUTTON (*)
53

54

55

56

57
Internal Ctrl. No.: 461116-100127-43636-0004

GARRAF FINAL DEVELOPMENT PLAN (GFDP)

Document No.: GFDP-107-52-ELE-DS-GE-004


Revision : 2
Page : 8 OF 9
Typical Data
Datasheet forsheet
Powerfor Well Pad for
Transformer Power
GIFTTransformers
Offsite Facilities Substation

1 SERVICE: ITEM No.: N/A QTY: 2

2 P.O NUMBER SIZE:


3 INFORMATION BY VENDOR
4 F COOLING - KNAN
5 1 HEAT DISSIPATED (*)
6 2 MAX. AMOUNT OF HEAT THE COOLING SYSTEM CAN DISIPATE (*)
7 COOLING - KNAF
8 3 NUMBER OF FANS (*)
9 4 POWER CONSUMPTION OF COOLING SYSTEM (*)
10 5 CONTROL OF FANS
11 AUTO CONTROL / MANUAL CONTROL (*)
12 6 FAN MOTOR
13 RATING (*)
14 TYPE (*)
15 7 MIN. NUMBER OF FANS TO BE OPERATED AT FULL LOAD (*)
16 8 WINDING TEMPERATURE AT WHICH FORCED COOLING IS INTIATED (*)
17 9 TRANSFORMER DERATING FACTOR AFTER FAILURE OF ONE / TWO / ALL COOLING FANS (*)
18

19 G OLTC PANEL (FOR REMOTE OPERATION)


20 1 LOCATION OFS SUBSTATION
21 2 TAP CHANGE IN PROGRESS INDICATION (*)
22 3 TEMPERATURE INDICATION (*)
23 4 PROTECTION RELAY AND AUTOMATIC VOLTAGE REGULATIONRELAY (*)
24 5 DIFFERENTIAL PROTECTION (87) PROVIDED BY SWITCHGEAR VENDOR
25 6 RESTRICTED EARTH FAULT PROTECTION (64R) PROVIDED BY SWITCHGEAR VENDOR
26 7 AUTOMATIC VOLTAGE REGULATION RELAY (*)
27 8 VOLTMETER INDICATION PER WINDING INCLUDING PHASE SELECTOR SWITCH (*)
28 9 PUSH BUTTONS FOR RAISING/LOWERING OF TAPPING (*)
29 10 DCS INTERFACE (*)
30

31 H SURGE ARRESTOR
32 1 TYPE OF CONSTRUCTION (*)
33 2 PRIMARY SIDE (*)
34 3 SECONDARY SIDE (*)
35 4 STANDARD SHORT DURATION POWER FREQUENCY WITHSTAND VOLTGAE (PRY/SRY) (*)
36 5 STANDARD LIGHTNING IMPUSLE WITHSTAND VOLTAGE (PRY/SRY) (*)
37 6 SPECIFIC CREEPAGE DISTANCE (*)
38 7 RATED DISCHARGE CURRENT (*)
39 8 IMPULSE WITHSTAND CURRENT (*)
40

41 I DETAILS OF FITTINGS & ACCESSORIES :


42 (VENDOR TO LIST) (*)
43

44

45

46

47

48

49

50

51

52

53

54

55
56
Internal Ctrl. No.: 461116-100127-43636-0004

GARRAF FINAL DEVELOPMENT PLAN (GFDP)

Document No.: GFDP-107-52-ELE-DS-GE-004


Revision : 2
Page : 9 OF 9

Typical Data
Datasheet forsheet
Powerfor Well Pad for
Transformer Power
GIFTTransformers
Offsite Facilities Substation

1 SERVICE: ITEM No.: N/A QTY: 2


2 P.O NUMBER SIZE:
3

4 NOTES:

6 1. (*) TO BE PROVIDED AND GUARANTEED BY VENDOR. VENDOR TO PROVIDE ALL OTHER REQUIREMENTS AS PER SPECIFICATION.

7 2. PERFORMANCE DATA SHALL BE FURNISHED FOR MAXIMUM RATING.


8 3. LOSSES SHALL BE INCLUSIVE OF POSITIVE TOLERANCE AND SHALL BE IN NOMINAL TAP.
9 4. LANGUAGE OF DOCUMENTS AND LANGUAGE ON EQUIPMENTS SHALL BE ENGLISH
10 5. DRAWING, DATAS AND TEST CERTIFICATES SHALL BE AS PER GFDP-COM-52-ELE-SP-GE-005
11 6. CABLE, GLAND SIZES FOR TERMINAL BOXES ARE ON HOLD AND SHALL BE UPDATED BY EPC CONTRACTOR DURING DETAILED ENGINEERING.
12 7. RATINGS SHALL BE UPDATED BY THE EPC CONTRACTOR BASED ON FINAL VENDOR DATA DURING DETAILED ENGINEERING.
13 8. VENDOR SHALL SUBMIT THE CALCULATION FOR SELECTION OF SURGE ARRESTOR BASED ON THE INSULATION CO-ORDINATION STUDY. VENDOR
14 SHALL MAKE PROVISION FOR CONNECTION OF SURGE ARRESTOR IN BOTH PRIMARY AND SECONDARY SIDE OF POWER TRANSFORMER. All BUSBARS,
15 CABLES, CONNECTORS, CLAMPS OR ANY OTHER ACCESSORIES REQUIRED SHALL BE PROVIDED BY THE VENDOR.
16 9. CT RATINGS INDICATED IN THE DATA SHEET SHALL BE UPDATED DURING DETAILED ENGINEERING.
17 10. EACH COOLING RADIATOR SHALL HAVE ISOLATION VALVE FOR INLET AND OUTLET AND IT SHOULD HAVE ADRAINING NIPPLE. IT SHOULD ALSO HAVE

18 AIR RELIEF PLUG.


19 11. OLTC BUCHHOLZ RELAY SHALL BE LOCATED ON THE OIL LINE FROM THE CONSERVATOR TO THE OLTC. VALVE ISOLATION SHOULD BE PROVIDED ON

20 BOTH SIDES OF THE BUCHHOLZ RELAY.


21 12. VENDOR TO PROVIDE TRIP AND ALARM SETTINGS FOR WINDING TEMPERATURE INDICATOR AND OIL TEMPERATURE INDICATOR.

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37
38
39

40

41

42

43

44

45

46

47

48
49
50
51

52

53

54
55

You might also like