Item Description
Item No. Length (m) Width 1 Width 2 Thickness/Depth Area (sq.m.) Volume (cu.m.)
Stationing/Location Member/Description
Aggregate Base Course
from to
201 sta 0+000 sta 0+490 490.00 6.00 0.15 2,940.00 441.00
sta 0+000 sta 0+490 490.00 2.00 0.15 980.00 147.00
total 3,920.00 588.00
Item Description
Item No. Length (m) Width 1 Width 2 Thickness/Depth Area (sq.m.) Volume (cu.m.)
Stationing/Location Member/Description
Portland Cement Concrete Pavement
311 from to
sta 0+000 sta 0+490 490.00 4.00 0.20 1,960.00 392.00
Construction Joints/Dowels
16mmø Dowel (Longitudinal) 22 4.00 0.75 66.00 11.00 11.00 Plain Bar
Part of 16mmø Dowel (Transverse) 1 653.00 0.75 489.75 81.63 82.00 Def. Bar
ITEM-311 93.00
3/16" x 1" x 20 ft. Angle Bar 8 2.00 6.00 96.00 16.00 16.00 angle bar
12mmø Staking on forms 2 75.00 0.40 60.00 10.00 10.00 Def. Bar
Tiewire 2 1,306.00 0.60 1,567.20 29.57 30.00 #16 tw
103.00
KC-NCDDP/Tier 2
DETAILED ESTIMATES
ITEM Description Qty. Unit No. of Days Unit Cost Total Cost
ITEM 105 SUB-GRADE PREPARATION
A. Equipment
Prime Mover (Mobilization) 1.00 unit 1.00 22,000.00 22,000.00
Road Grader 1.00 unit 1.00 19,500.00 19,500.00
Scraping (Subgrading)
Prod Rate 300.00 m2/hr
Equip-hrs 9.80 hrs
Total Equip hrs 9.80 hrs
A. Materials
Item 201 677.00 cu.m. 950.00 643,150.00
B. Equipment
Prime Mover (Demobilization) 1.00 unit 1.00 22,000.00 22,000.00
Road Grader 1.00 unit 1.00 19,500.00 19,500.00
Scraping (Spreading)
Prod Rate 50.00 m2/hr
Equip-hrs 13.54 hrs
Total Equip hrs 13.54 hrs
C. Labor
Laborer 1.00 person 2.00 250.00 500.00
C. Labor
Prod. Rate (concreting) 5.56 cu.m./M-D
man-days 70.00
NOTED BY:
Checked by:
PROGRAM OF WORKS
KC-NCDDP/Tier 2
Barangay: Agustin Navarra
Municipality: Ivisan
Province: Capiz
Region VI
Project Description:
Improvement of Barangay Access Road 4 m x 0.49 Project Duration 90 C.D.
km by spreading of 588 cu.m. Item 201 and pouring Equipment Needed Road Grader, Road Roller, Water Truck, Concrete Mixer, Concrete Vibrator
of 392 cu.m. PCCP with 1.00 m. shouldering Technical Personnel Project Engineer
bothsides Project Supervisor
Item Scope of Work % Wt. Quantity Unit of Measurement Unit Price Total Amount
Source of Fund
Breakdown of Estimated Sub-Project Cost Community Municipal LGU BLGU
NCDDP Grant Total Cost
Cash In-kind Cash In-kind Cash
A. DIRECT COST
A.1 Materials 2,444,000.00 2,444,000.00
A.2 Labor -
A.2.1 Skilled 86,260.00 86,260.00
A.2.2 Unskilled 143,500.00 143,500.00
A.3 Equipment 351,000.00 351,000.00
A.4 Technical Supervision -
A.4.1 Project Engineer/Technical 46,800.00 46,800.00
A.4.2 Project Supervisor 35,100.00 35,100.00
Sub-Total 3,106,660.00 - - - - - 3,106,660.00
B. INDIRECT COST -
B.1 Pre-engineering -
B.1.1 Survey Works (TAF not included) 3,500.00 3,500.00
B.1.2 Preparation of Plans, Specs and POW 3,000.00 3,000.00
B.2 Administrative and Overhead Cost -
B.2.1 Engineering Supervision 12,000.00 12,000.00
B.2.2 Bookkeeper 1,950.00 1,950.00
B.2.3 Asst. Bookkeeper 1,300.00 1,300.00
B.2.4 Bodegero/Timekeeper 1,300.00 1,300.00
B.2.5 BSPMC Honorarium 1,950.00 1,950.00
B.2.6 Office Supplies 13,594.00 13,594.00
B.2.7 Reproduction of Documents 2,000.00 2,000.00
B.2.8 Travel Expenses 10,000.00 10,000.00
B.2.9 Permits and Licenses 2,500.00 2,500.00
B.2.10 Publication Cost 500.00 500.00
B.3 Miscellaneous Expenses -
B.3.1 Materials Testing 5,000.00 5,000.00
B.3.2 Hand Tools 4,095.00 4,095.00
B.3.3 Personal Protective Equipment (PPE) 4,550.00 4,550.00
B.3.4 Filing Cabinet -
B.3.5 Treasurer's Bond 5,253.75 5,253.75
B.3.6 Billboard Installation 5,535.00 5,535.00
B.4 Contractor's Profit 31,166.00 31,166.00
B.5 Taxes 37,399.20 37,399.20
C. Contingency 12,747.05 12,747.05
Sub-Total 126,586.25 - - - 18,500.00 14,253.75 159,340.00
TOTAL 3,233,246.25 - - - 18,500.00 14,253.75 3,266,000.00
% Cost Sharing 99.00% 0.00% 0.00% 0.00% 0.57% 0.44% 100.00%
TOTAL PROJECT COST 3,266,000.00
NOTE TO ENGINEERS: SOME ITEMS MAY BE ADDED AND MAY BE MORE DETAILED IF APPLICABLE
Republic of the Philippines
Region VI
Province of Capiz
Municipality of Ivisan
Tensile Stress:
3. Reinforcing Steel Bars
- 16 mm dia RSB 1pcs x 1.0m - sample 1 sample 275 Mpa
Approved by:
Name of Proposed Community Project: Improving Accessibility through Community Managed Road Concreting Date Prepared : August 21, 2017
Barangay: Agustin Navarra Municipality: IVISAN Province : CAPIZ
Total Estimated Cost : 3,266,000.00 Proposed Project Implementation Schedule:
Community Project Duration: 90 C.D.
Type of Plan: ( X ) Initial ( ) Actual
Possible
Unit of Schedue of
Work Item QTY. Unit Cost Total Cost Procurement Method Contractors/Suppliers REMARKS / COMMENT
Measure Procurement
per Package:
PACKAGE NO. 1
SUB-GRADE PREPARATION 2,940.00 sq.m. 29.00 85,260.00
AGGREGATE BASE COURSE 588.00 cu.m. 1,250.26 735,150.00
PORTLAND CEMENT CONCRETE Payment/Billing for this package will
1,960.00 sq.m. 1,116.99 2,189,300.00 COMMUNITY
PAVEMENT be on the same Tranche based on the
BIDDING FOR FIRST TRANCHE
MONUMENTS AND MARKERS 1.00 lot 15,050.00 15,050.00 accomplishment and the balance will be
WORKS
TECHNICAL SUPERVISION 1.00 lot 81,900.00 81,900.00 on the 2nd Tranche
Materials Testing 1.00 lot 5,000.00 5,000.00
Billboard Installation 1.00 lot 5,535.00 5,535.00
Sub Total 3,117,195.00
PACKAGE NO. 2 Payment/Billing for this package will
Hand Tools 1.00 lot. 4,095.00 4,095.00 COMMUNITY
be on the same tranche after completely
SHOPPING FOR FIRST TRANCHE
Personal Protective Equipment (PPE) 1.00 lot. 4,550.00 4,550.00 delivery of the item. Delivery of goods
GOODS
Sub Total 8,645.00 is free of charge.
PACKAGE NO. 3
Bond Paper long 10.00 rim 320.00 3,200.00
bond Paper Short 8.00 rim 370.00 2,960.00
Carbon Paper 1.00 box 380.00 380.00
# 2 Pencil 2.00 box 20.00 40.00
Ballpen 2.00 box 50.00 100.00
Cartolina (Assorted Color) 20.00 sheets 19.00 380.00
12 digit , 2 way power Calculator 1.00 unit 675.00 675.00
Long Folder 30.00 sheets 5.00 150.00
short folder 20.00 sheets 5.50 110.00
Long Folder Plastic (Red) 20.00 sheets 10.00 200.00
Long Envelope (Expanded) 20.00 pcs 17.00 340.00
Short Envelope (Expanded) 30.00 pcs 8.00 240.00
Long Brown Envelope 10.00 pcs 3.00 30.00
Short Brown Envelope 10.00 pcs 2.00 20.00
Log Book (510 Pages) 5.00 pcs 110.00 550.00 Payment/Billing for this package will
COMMUNITY
16 col Columnar Book 2.00 pcs 55.00 110.00 be on the same tranche after completely
SHOPPING FOR FIRST TRANCHE
#35 Stapler 1.00 unit 275.00 275.00 delivery of the item. Delivery of goods
GOODS
is free of charge.
#35 Staple Wire 3.00 box 45.00 135.00
sharpener 1.00 pcs 10.00 10.00
Paper Clips 4.00 box 9.75 39.00
Puncher (Big) 1.00 unit 290.00 290.00
Cutter (Big) 2.00 pcs 15.00 30.00
Cash Deposit Box 1.00 unit 550.00 550.00
130g Glue 2.00 bottles 140.00 280.00
Paste (big) 2.00 jars 35.00 70.00
Paper Fastener 6.00 box 60.00 360.00
Pentel Pen (Black) 1.00 box 40.00 40.00
Refill Ink ( Black) 2.00 box 90.00 180.00
Printer Ink (Black) 3.00 bottles 275.00 825.00
Printer Ink (Assorted Color) 3.00 bottles 275.00 825.00
Manila Paper 20.00 sheets 10.00 200.00
Sub Total A 13,594.00
GRAND TOTAL 3,139,434.00
ROSALYN ARCA JOSE JIGGER JACINTO ENGR. ARTHUR D. ADRICULA DIESELINE HABITAN
Procurement Team Head Technical Facilitator Municipal Engineer BSPMC Chairperson
Department of Social Welfare and Development
KALAHI-CIDSS NCDDP PROJECT
BARANGAY MAINTENANCE PROGRAM
1. Grading 0.051 Reshaping every three Road 0.00 19,500.00 0.00 - - O and M x
years Grader/1 unit Group
Maintain
the
Road O and M serviceabili
0.00 19,500.00 0.00 Item 201 0 cu.m. 950.00 - - - ty of the x
Grader/1 unit Group
2. sub-project
Regravelling Gravelling, and
(.025m thick 0.051 Spreading & every three prevent
years further
of gravelled Compaction
road) Road Roller/1 damage.
unit 0.00 21,000.00 0.00 - -
Clearing of O and M
3. Road 0.051 Vegetative Every 2 2 laborer 2.00 250.00 1,000.00 1,000.00 500.00 Group/Comm Prevent x
Shoulder years Damage
shoulder unity
6. SPL 0.051 Patching Every 2 1 Mason 2.00 380.00 760.00 Item 311 6 sq.m. 589.00 3,534.00 4,294.00 2,147.00 O and M x
Potholes years Group
Prepared By: Reviewed By: Recommending Approval: Noted By: Approved By:
MICHELLE HORARIO ROMULO LOBERES,JR. ENGR. ARTHUR D. ADRICULA JOSE NOEL N. YAP DIESELINE HABITAN
Operation & Maintainance Chair Barangay Chairman Municipal Engineer Municipal Mayor BSPMC Chairperson
Date: _______________ Date: ____________ Date:__________________ Date: _____________ Date: _____________
Department of Social Welfare and Development
KALAHI-CIDSS NCDDP PROJECT
BARANGAY OPERATION PROGRAM
Ensure that
Allocation of funds will Approved Brgy.
1. be
Formulation funds for provided Resolution must be
1 Lot Operation BDC informed to the
of Brgy. and on the community through
Resolution approved
Maintenance Brgy. O and barangay assembly.
M Plan
Prepared By: Reviewed By: Recommending Approval: Noted By: Approved By:
MICHELLE HORARIO ROMULO LOBERES,JR. ENGR. ARTHUR D. ADRICULA JOSE NOEL N. YAP DIESELINE HABITAN
Operation & Maintainance Chair Barangay Chairman Municipal Engineer Municipal Mayor BSPMC Chairperson
Date: _______________ Date: ____________ Date:__________________ Date: _____________ Date: _____________
BARANGAY SUB-PROJECT WORK SCHEDULE & PHYSICAL PROGRESS REPORT
For the Month of _________, 20___
Name of Sub-Project: Improving Accessibility through Community Managed Road Concreting Physical Target: 0.49 km.
Location: Brgy. Agustin Navarra, Ivisan, Capiz Approved Cost: 3,266,000.00
Name of Sub-
Improving Accessibility through Community Managed Road Concreting Total Sub-Project Cost: Php. 3,266,000.00 Labor Generated Total No. of Days Ave. Rate/Day
Project:
Physical Target: 0.49 KM Direct Cost: Php. 3,106,660.00
Region: VI Indirect Cost: Php. 159,340.00
Province: CAPIZ Date Started:
Municipality: IVISAN Target Completion Date:
Barangay: AGUSTIN NAVARRA
JOSE JIGGER JACINTO JOSE TOLENTINO EDMUNDO UNATING DIESELINE HABITAN ENGR. ARTHUR D. ADRICULA ENGR. AMOR P. AMARAN
Technical Facilitator PIT Chair MIT Chair BSPMC Chair Municipal Engineer Regional Community Infrastructure Specialist
W10 W11 W12 W13
F
0 i
n
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 i
0 0 0 s
h
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
LABOR RATES
Certified by:
EQUIPMENT RENTAL
Item No. Item Description Quantity Unit Unit cost
2nd cycle
Certified by:
Certified by: