Summary of The Simulation:: Name: Tayyab Mansoor Ch. SAP: 24166
Summary of The Simulation:: Name: Tayyab Mansoor Ch. SAP: 24166
SAP: 24166
In this Simulation, Following data is being used for Distributed generation of various sources( Diesal
Generator, Wind Turbine, Solar Array, Utility etc) :
Rated
Bus Type theta
Voltage
1 Open Air 16.5 kV 0
2 Open Air 18 kv 0
3 Open Air 230 kv 0
4 Open Air 13.8 kv 0
5 Open Air 230 kv 0
6 Open Air 230 kv 0
7 Open Air 230 kv 0
8 Open Air 230 kv 0
9 Open Air 230 kv 0
10 Open Air 230 kv 0
11 Open Air 120V 0
To adopt these combinations following scheme is adopted which will be indicative on the Single Line
diagram:
Results:
1- For each case, the Load flow analysis is attached.
2- The complete report is generated for the U1 and WTG.
3- The alerts can be ignored since this is the simulation and to show that these alerts may appear
in the results.
Attachments:
Bus7 Bus4
T1 100 MVA
Bus2 T7 13.8 kV Gen2
Gen1 18 kV 100 MVA 230 kV CB14 CB31
162.2 MW CB2 CB7 Bus8 Bus9 CB15
162.2 MW
230 kV
230 kV
Open
Open CB10 CB11 CB12 CB13
Open CB27
CB4 CB18 Open
dcCB1
CB26
dcBus1
T8 PVA1
CB32 Bus10
100 MVA 230 kV
Bus13 Bus12
CB6
Lump4 dcCB3
Bus5 CB5 5 MVA Bus6
230 kV 230 kV
CB25
CB29
CB24
CB28
CB23
CB22
Bus110
CB21
230 kV
T5
Lump2 100 MVA
10 MVA
CB20 Lump3
10 MVA
Bus1
16.5 kV
CB19 CB30
U1
Lump1
10 MVA
100 MVAsc
Bus7 Bus4
T1 100 MVA
Bus2 T7 13.8 kV Gen2
Gen1 18 kV 100 MVA 230 kV
2 %
162.2 MW % Bus8 Bus9 98.6 162.2 MW
98.6 230 kV
230 kV
Open
Open
dcBus1
j2619 T8
Bus10
100 MVA 230 kV
1409
Lump4 3 %
j500.6 98.6
Bus5 5 MVA Bus6
2818 1 %
230 kV 98. 6 8454
230 kV
j1374
j5239
8453
j5239
11285 9874
2 %
j6355 j5481 98.7
Bus110
230 kV
T5
Lump2 100 MVA
10 MVA
21177 Lump3
%
j12439 100 10 MVA
Bus1
8500 29677 16.5 kV
j5268 j17707
U1
Lump1
10 MVA
100 MVAsc
Bus7 Bus4
T1 100 MVA
Bus2 T7 13.8 kV Gen2
Gen1 18 kV 100 MVA 230 kV
162.2 MW % Bus8 Bus9 98 % 162.2 MW
100 230 kV
230 kV
29580 29580 Open
j18353 j18353
WTG1 Bus11 100 MVA 8438
2 % 8443 98 %
10 MW 16.5 kV 98.1 T3 j4634 j4793 Inv1 Battery1
2 %
98.1
Open 8430
7 % Open
98.0 j5048 PVA1
4218
dcBus1
j2614 T8
Bus10
16883 100 MVA 230 kV
j9893
Lump4 5 %
97.9
Bus5 5 MVA Bus6
230 kV 98. 03 % 8431
230 kV
j5225
8434 8429
j5227 j4823
5.93
5 %
-j238.6 97.9
8415 Bus110
j5317
230 kV
T5
Lump2 100 MVA
10 MVA
8 % Lump3
97.3 10 MVA
Bus1
8412 16.5 kV
j5213
Open
U1
Lump1
10 MVA
100 MVAsc
Bus7 Bus4
T1 100 MVA
Bus2 T7 13.8 kV Gen2
Gen1 18 kV 100 MVA 230 kV
162.2 MW Bus8 Bus9 162.2 MW
230 kV
230 kV Open
Open
Open
PVA1
dcBus1
T8
Bus10
100 MVA 230 kV
Lump4
230 kV
Bus5 5 MVA Bus6
230 kV
Bus110
230 kV
T5
Lump2 100 MVA
10 MVA
Lump3
10 MVA
Bus1
16.5 kV
U1
Lump1
10 MVA
100 MVAsc
Bus7 Bus4
T1 100 MVA
Bus2 T7 13.8 kV Gen2
Gen1 18 kV 100 MVA 230 kV
%
162.2 MW 5 % Bus8 Bus9 100 162.2 MW
97.9 230 kV
230 kV 29590 29590
Open j18354 j18354
dcBus1
j2613 T8
Bus10
7022 100 MVA 230 kV
j4177
Lump4 2 %
230 kV 98.0
Bus5 5 MVA Bus6
230 kV 97. 91 % 9837 8433
j5694 j5226
8430
j5224
1411
3 %
j632.3 97.9
8415 Bus110
j5316 230 kV
T5
Lump2 100 MVA
10 MVA
6 % Lump3
97.3 10 MVA
Bus1
8412 16.5 kV
j5213
Open
U1
Lump1
10 MVA 100 MVAsc
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Cable Length: No
Apply Individual
Temperature Correction Adjustments /Global Degree C
Load
Total Number of Buses: 10 23.800 14.750 5.950 3.687 0.000 0.000 0.000 0.000
10.000 -6.197
Project: ETAP Page: 4
Line/Cable Length
ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle
Branch Connections
* Bus1 16.500 100.000 0.0 19.629 23.903 8.500 5.268 Bus110 11.129 18.635 759.5 51.3
Bus5 230.000 98.055 -0.6 0 0 8.435 5.227 Bus110 -4.585 -10.831 30.1 39.0
Bus6 230.000 98.044 -0.6 0 0 8.434 5.227 Bus9 -1.924 2.617 8.3 -59.2
Bus7 230.000 98.069 -0.6 0 0 4.217 2.614 Bus8 1.926 -3.194 9.5 -51.6
Bus11 16.500 97.458 0.1 10.000 -6.197 0 0 Bus7 10.000 -6.197 422.4 -85.0
Bus2 18.000
Bus13 230.000
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
Project: ETAP Page: 9
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
T1 Transformer 100.000
T8 Transformer 100.000
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Line1 -4.585 -10.831 4.596 10.576 11.4 -255.1 98.1 98.1 0.06
Line90 -3.850 5.604 3.852 -5.763 2.5 -159.4 98.1 98.1 0.01
Line2 -6.510 -7.844 6.519 7.589 8.6 -255.7 98.0 98.1 0.07
Line11 1.926 -3.194 -1.925 3.034 0.7 -159.7 98.1 98.1 0.01
Line5 1.925 -3.034 -1.924 2.777 1.0 -257.0 98.1 98.1 0.01
42.8 -630.0
Project: ETAP Page: 11
% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Bus Voltage
OverVoltage 105.0 102.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
Critical Report
Marginal Report
MW Mvar MVA % PF
Number of Iterations: 3
Project: ETAP Page: 1
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Cable Length: No
Apply Individual
Temperature Correction Adjustments /Global Degree C
Load
Total Number of Buses: 11 23.800 14.750 5.950 3.687 0.000 0.000 0.000 0.000
0.000 0.000
Project: ETAP Page: 4
Line/Cable Length
ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle
Branch Connections
Bus1 16.500 97.362 -2.2 0 0 8.412 5.213 Bus110 -8.412 -5.213 355.6 85.0
* Bus4 13.800 100.000 0.0 29.590 18.354 0 0 Bus9 29.590 18.354 1456.8 85.0
Bus5 230.000 97.914 -1.7 0 0 8.430 5.224 Bus110 -1.411 -0.889 4.3 84.6
Bus6 230.000 98.017 -1.7 0 0 8.433 5.226 Bus9 -18.270 -10.920 54.5 85.8
Bus7 230.000 97.954 -1.7 0 0 4.216 2.613 Bus8 -11.238 -6.789 33.6 85.6
Bus2 18.000
Bus11 16.500
Bus13 230.000 -
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
Project: ETAP Page: 9
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
T1 Transformer 100.000
T3 Transformer 100.000
T8 Transformer 100.000
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Line1 -1.411 -0.889 1.411 0.632 0.2 -256.5 97.9 97.9 0.01
Line90 -7.019 -4.336 7.022 4.177 3.5 -158.7 97.9 98.0 0.04
Line2 9.837 5.694 -9.826 -5.949 11.0 -254.6 98.0 97.9 0.09
Line11 -11.238 -6.789 11.247 6.632 8.9 -157.8 98.0 98.0 0.06
Line5 -11.247 -6.632 11.261 6.377 14.2 -254.5 98.0 98.1 0.10
99.9 77.8
Project: ETAP Page: 11
% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Bus Voltage
OverVoltage 105.0 102.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
Marginal Report
MW Mvar MVA % PF
Number of Iterations: 3