EIP- AMS
26‐Aug‐10 MMHW‐OC‐ISD 1
SYSTEM OVERVIEW-AMS
The Asset Management System (AMS) enables the P&M
personnel to record the daily log sheets, major repairs
carried‐out & working details for ECC owned equipment
i d t& ki d t il f ECC d i t
and externally hired equipment at site. With this
information the system generates Monthly plant
information, the system generates Monthly plant
performance report (MPR) and Plant cost statement (CP),
repair history, RTA related reports and so on. The system
has provision to consolidate data from all other Site systems
like SCM, FINANCE, WOM and generates file for Costing
system. Data from Asset Management System is imported
f d
to SCS for monthly processing.
26‐Aug‐10 MMHW‐OC‐ISD 2
ASSET MANAGEMENT SYSTEM
ENTIRE ACCESS BY P&M INCHARGE EXCEPT ASSET SURPLUS DECLARATION APPROVAL
START
ASSET RECEIPT
ASSET COMISSIONING
MAJOR ASSETS MINOR ASSETS
LOG SHEET METER UPDATE
MINOR ASSET ALLOCATION
A
26‐Aug‐10 MMHW‐OC‐ISD 3
A
IHC CP PROCESS
( TRIAL RUN REQUEST)
IF NOT CORRECT
CHECK IHC CP JOB SITE
REPORT
IF CORRECT
IDENTIFY THE PROBLEM
IHC CP PROCESS
IHC CP PROCESS
( FINAL RUN REQUEST)
26‐Aug‐10 MMHW‐OC‐ISD 4
2 ASSET
REPAIR
ASSET REPAIR
ENTER DETAILS IN REPAIR
REGISTER HISTORY
ENTER DETAILS IN REPAIR
REGISTER ENTRY
26‐Aug‐10 MMHW‐OC‐ISD 5
ASSET
3
DESPATCH
ASSET SURPLUS
DECLARATION
ASSET SURPLUS
DECLARATION APPROVE BY By Project Head
PROJECT HEAD
SELECT ASSET DESPATCH IN
SELECT ASSET DESPATCH IN
ASSET COMMISIONING
MASTER
ASSET DESPATCH
26‐Aug‐10 MMHW‐OC‐ISD 6
4 REPORTS & CHECK LISTS
REPAIR REGISTER VIEW
REPAIR REGISTER VIEW
LOG SHEET VIEW
REPORTS ASSET MINOR ALLOCATION REPORT
REPAIR REGISTER HISTORY VIEW
MISSING ASSET
LOGSHEET DATEWISE
LOGSHEET ASSET WISE
CHECK LIST
CHECK LIST
ASSET WEEKLY LOGSHEET
ASSET CP INTEGRATION DETAILS
26‐Aug‐10 MMHW‐OC‐ISD 7
5 PERFORMANCE REPORTS
REPORT SERVER
MIS REPORTS
ASSET PERFORMANCE REPORT
ASSET PERFORMANCE REPORT
ASSET PRODUCTIVITY REPORT
ASSET
PERFORMANCE
ASSET FUEL REPORT
OPERATING DETAILS
26‐Aug‐10 MMHW‐OC‐ISD 8
MAIN MENU-EIP
Login thru P&M In‐charge
26‐Aug‐10 MMHW‐OC‐ISD 9
AMS LOGIN
Click here
26‐Aug‐10 MMHW‐OC‐ISD 10
SESSION CUSTOMIZATION
Click
Click
here
Choose the Accounting Centre
26‐Aug‐10 MMHW‐OC‐ISD 11
Click
Click
here
26‐Aug‐10 MMHW‐OC‐ISD 12
ASSET RECIEPT
Click
here
26‐Aug‐10 MMHW‐OC‐ISD 13
RECEIPT NOTE
Click here for
Cli k h f
taking RN
26‐Aug‐10 MMHW‐OC‐ISD 14
Already
received
26‐Aug‐10 MMHW‐OC‐ISD 15
LOG SHEET(AMS OPERATION)
Click
here
26‐Aug‐10 MMHW‐OC‐ISD 16
AMS-MENU FOR SITE OPERATIONS
26‐Aug‐10 MMHW‐OC‐ISD 17
ASSET COMMISSIONING DETAILS
Asset
code
Comm.
date
Meter reading
updating(only for Click
new assets here
26‐Aug‐10 MMHW‐OC‐ISD 18
LOG SHEET METER UPDATE
26‐Aug‐10 MMHW‐OC‐ISD 19
LOG SHEET ENTRY
26‐Aug‐10 MMHW‐OC‐ISD 20
LOG SHEET METER UPDATE
For
existing
assets
26‐Aug‐10 MMHW‐OC‐ISD 21
LOG SHEET ENTRY
Click here
26‐Aug‐10 MMHW‐OC‐ISD 22
LOG SHEET ENTRY
Enter
End
reading
Click
here
Check Select
meter Working or
type Idle
26‐Aug‐10 MMHW‐OC‐ISD 23
LOG SHEET ENTRY
Select
Recon
code
Select
Activity
code from
dropdown
Enter the diff between Click
start and end reading here
26‐Aug‐10 MMHW‐OC‐ISD 24
LOG SHEET ENTRY
Submit for
saving
26‐Aug‐10 MMHW‐OC‐ISD 25
ASSET MINOR ALLOCATION
Click here
26‐Aug‐10 MMHW‐OC‐ISD 26
SSelect
l t
asset
code
26‐Aug‐10 MMHW‐OC‐ISD 27
For
Select recon Enter % sumbit Save
code
26‐Aug‐10 MMHW‐OC‐ISD 28
REPAIR REGISTER HISTORY
Click here
26‐Aug‐10 MMHW‐OC‐ISD 29
ASSET REPAIR REGISTER HISTORY
Click here for
selecting asset
Select the Nature of
defect.Predefined by
HQ.
26‐Aug‐10 MMHW‐OC‐ISD 30
ASSET REPAIR REGISTER
Select
asset
t
code
Select the Select the
Nature of type of
defect repair
26‐Aug‐10 MMHW‐OC‐ISD 31
ASSET SURPLUS
Click
here
26‐Aug‐10 MMHW‐OC‐ISD 32
Select asset
code
User name comes’ ’
automatically
26‐Aug‐10 MMHW‐OC‐ISD 33
REPORTS-REPAIR REGISTER VIEW
SSelect asset
l t t
code
26‐Aug‐10 MMHW‐OC‐ISD 34
Data can be
downloaded in xls
format
Select
period Select
p
period
26‐Aug‐10 MMHW‐OC‐ISD 35
LOG SHEET VIEW
Click here
26‐Aug‐10 MMHW‐OC‐ISD 36
26‐Aug‐10 MMHW‐OC‐ISD 37
ASSET MINOR ALLOCATION REPORT
Click here
26‐Aug‐10 MMHW‐OC‐ISD 38
Select month Click
here
26‐Aug‐10 MMHW‐OC‐ISD 39
26‐Aug‐10 MMHW‐OC‐ISD 40
REPAIR REGISTER HISTORY VIEW
26‐Aug‐10 MMHW‐OC‐ISD 41
Select
month
26‐Aug‐10 MMHW‐OC‐ISD 42
ASSET CP INTEGRATION DETAILS
Select
month
26‐Aug‐10 MMHW‐OC‐ISD 43
Select Click her
system for getting
reports
26‐Aug‐10 MMHW‐OC‐ISD 44
IHC CP PROCESSING
Click
here
26‐Aug‐10 MMHW‐OC‐ISD 45
SSelect
l t
month
Click on view
Click on view
missing asset
Pending log
sheet data
26‐Aug‐10 MMHW‐OC‐ISD 46
After clearing once again
click till the msg box
coming
26‐Aug‐10 MMHW‐OC‐ISD 47
See the
status
status
Select whether
Give
trial run pending or
request
completed
26‐Aug‐10 MMHW‐OC‐ISD 48
VIEW MISSING COST ALLOCATION
Click
here
26‐Aug‐10 MMHW‐OC‐ISD 49
Select
Select
month
Click
here
For
saving
Click
Select
l save
Select
go Click
Enter recon
% allocate
26‐Aug‐10 MMHW‐OC‐ISD 50
CP DATA
Click
here
26‐Aug‐10 MMHW‐OC‐ISD 51
Select
Select
month
26‐Aug‐10 MMHW‐OC‐ISD 52
Click go
Click go
Select
month
26‐Aug‐10 MMHW‐OC‐ISD 53
CP FINAL RUN
Select
Give request final
for closing the run
month
26‐Aug‐10 MMHW‐OC‐ISD 54
ASSET REPAIR REGISTER STATUS
26‐Aug‐10 MMHW‐OC‐ISD 55
ASSET PERFORMANCE REPORT
26‐Aug‐10 MMHW‐OC‐ISD 56
REPORT
26‐Aug‐10 MMHW‐OC‐ISD 57
ASSET PERFORMANCE REPORT
Put the
job code
26‐Aug‐10 MMHW‐OC‐ISD 58
ASSET PERFORMANCE REPORT
26‐Aug‐10 MMHW‐OC‐ISD 59
ASSET PERFORMANCE REPORT
26‐Aug‐10 MMHW‐OC‐ISD 60
CP COMPONENTS DETAILS
Comp.
CP Components Formula Source
No.
Depreciation
4 the Month / Total Days For the Month) Log sheet
((Book value + (Book value - Depreciation For the Year))/2)*(Cost
Year))/2) (Cost Of Capital
Cost of Capital Plant Master
5 Percentage/100)/12
Insurance Total Insurance * (Acquisition Value/ Total Available Asset's Acquisition Value) FAS
6
Road Tax FAS
7
Total Owning cost [4+5+6+7]
8
Operation Labour WOM
9
perating Cost
12 WOM
FAS/REGIONAL
Staff Total Staff Cost * (IHC Value/ Total Available Asset's IHC Value)
13 BOOKING
16 Fuel SCM
Lubricants
17 SCM
Other Consumable
18 SCM
Total Fuel
[16+17+18]
19 OilConsumable Cost
Total Plant Cost For
[3+19]
20 Job
26‐Aug‐10 MMHW‐OC‐ISD 61
Sujoy Panda
033-4405 0124
[email protected]
26‐Aug‐10 MMHW‐OC‐ISD 62