Eip-Ams: Larsen & Toubro Limited - Engineering Construction & Contracts Division

The Asset Management System (AMS) enables operations and maintenance personnel to record daily log sheets, major repairs, and equipment usage details for owned and rented equipment at construction sites. The system generates monthly performance reports, cost statements, repair histories, and other reports. It integrates data from other site systems and provides data to costing systems. The document outlines the key functions and workflows in AMS for asset receipt, commissioning, log sheet entry, minor asset allocation, repair registration, and report generation.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views62 pages

Eip-Ams: Larsen & Toubro Limited - Engineering Construction & Contracts Division

The Asset Management System (AMS) enables operations and maintenance personnel to record daily log sheets, major repairs, and equipment usage details for owned and rented equipment at construction sites. The system generates monthly performance reports, cost statements, repair histories, and other reports. It integrates data from other site systems and provides data to costing systems. The document outlines the key functions and workflows in AMS for asset receipt, commissioning, log sheet entry, minor asset allocation, repair registration, and report generation.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 62

Larsen & Toubro Limited - Engineering Construction & Contracts Division

EIP- AMS

26‐Aug‐10 MMHW‐OC‐ISD 1
SYSTEM OVERVIEW-AMS
The Asset Management System (AMS) enables the P&M 
personnel to record the daily log sheets,  major repairs 
carried‐out & working details for ECC owned equipment 
i d t& ki d t il f ECC d i t
and externally hired equipment at site. With this 
information the system generates Monthly plant
information, the system generates Monthly plant 
performance report (MPR) and Plant cost statement (CP), 
repair history, RTA related reports  and so on.  The system 
has provision to consolidate data from all other Site systems 
like SCM, FINANCE, WOM and generates file for Costing 
system. Data from Asset Management System is imported 
f d
to SCS for monthly processing.

26‐Aug‐10 MMHW‐OC‐ISD 2
ASSET MANAGEMENT SYSTEM
ENTIRE ACCESS BY P&M INCHARGE EXCEPT ASSET SURPLUS DECLARATION APPROVAL

START

ASSET RECEIPT

ASSET COMISSIONING

MAJOR ASSETS MINOR ASSETS

LOG SHEET METER UPDATE
MINOR ASSET ALLOCATION

LOG SHEET ENTRY


LOG SHEET ENTRY

A
26‐Aug‐10 MMHW‐OC‐ISD 3
A

IHC CP PROCESS
( TRIAL RUN REQUEST)

IF NOT CORRECT
CHECK IHC CP JOB SITE 
REPORT

IF CORRECT
IDENTIFY THE PROBLEM
IHC CP PROCESS              
IHC CP PROCESS
( FINAL RUN REQUEST)

26‐Aug‐10 MMHW‐OC‐ISD 4
2 ASSET 
REPAIR

ASSET REPAIR

ENTER DETAILS IN REPAIR 
REGISTER HISTORY

ENTER DETAILS IN REPAIR 
REGISTER ENTRY

26‐Aug‐10 MMHW‐OC‐ISD 5
ASSET
3
DESPATCH

ASSET SURPLUS 
DECLARATION

ASSET SURPLUS 
DECLARATION APPROVE BY  By Project Head
PROJECT HEAD

SELECT ASSET DESPATCH IN 
SELECT ASSET DESPATCH IN
ASSET COMMISIONING 
MASTER

ASSET DESPATCH

26‐Aug‐10 MMHW‐OC‐ISD 6
4 REPORTS & CHECK LISTS
REPAIR REGISTER VIEW
REPAIR REGISTER VIEW

LOG SHEET VIEW

REPORTS ASSET MINOR ALLOCATION REPORT

REPAIR REGISTER HISTORY VIEW

MISSING ASSET

LOGSHEET DATEWISE

LOGSHEET ASSET WISE
CHECK LIST
CHECK LIST
ASSET WEEKLY LOGSHEET

ASSET CP INTEGRATION DETAILS

26‐Aug‐10 MMHW‐OC‐ISD 7
5 PERFORMANCE   REPORTS

REPORT SERVER

MIS REPORTS
ASSET PERFORMANCE REPORT
ASSET PERFORMANCE REPORT

ASSET PRODUCTIVITY REPORT
ASSET 
PERFORMANCE
ASSET FUEL REPORT

OPERATING DETAILS

26‐Aug‐10 MMHW‐OC‐ISD 8
MAIN MENU-EIP

Login thru P&M In‐charge

26‐Aug‐10 MMHW‐OC‐ISD 9
AMS LOGIN

Click here

26‐Aug‐10 MMHW‐OC‐ISD 10
SESSION CUSTOMIZATION

Click
Click 
here

Choose the Accounting Centre

26‐Aug‐10 MMHW‐OC‐ISD 11
Click
Click 
here

26‐Aug‐10 MMHW‐OC‐ISD 12
ASSET RECIEPT

Click 
here

26‐Aug‐10 MMHW‐OC‐ISD 13
RECEIPT NOTE

Click  here for 
Cli k h f
taking RN

26‐Aug‐10 MMHW‐OC‐ISD 14
Already 
received

26‐Aug‐10 MMHW‐OC‐ISD 15
LOG SHEET(AMS OPERATION)

Click 
here

26‐Aug‐10 MMHW‐OC‐ISD 16
AMS-MENU FOR SITE OPERATIONS

Main menu for AMS operations

26‐Aug‐10 MMHW‐OC‐ISD 17
ASSET COMMISSIONING DETAILS

Asset
code
Comm. 
date

Meter reading
updating(only for Click
new assets here

26‐Aug‐10 MMHW‐OC‐ISD 18
LOG SHEET METER UPDATE

26‐Aug‐10 MMHW‐OC‐ISD 19
LOG SHEET ENTRY

26‐Aug‐10 MMHW‐OC‐ISD 20
LOG SHEET METER UPDATE

For
existing
assets

End Click here


Startt
St meter for
meter reading updating
reading

26‐Aug‐10 MMHW‐OC‐ISD 21
LOG SHEET ENTRY

Click here

26‐Aug‐10 MMHW‐OC‐ISD 22
LOG SHEET ENTRY

Enter 
End 
reading

Click 
here
Check  Select 
meter  Working or 
type Idle

26‐Aug‐10 MMHW‐OC‐ISD 23
LOG SHEET ENTRY

Select 
Recon 
code

Select 
Activity 
code from 
dropdown

Enter the diff between  Click 
start and end reading here

26‐Aug‐10 MMHW‐OC‐ISD 24
LOG SHEET ENTRY

Submit  for 
saving

26‐Aug‐10 MMHW‐OC‐ISD 25
ASSET MINOR ALLOCATION

Click here

26‐Aug‐10 MMHW‐OC‐ISD 26
SSelect 
l t
asset 
code

26‐Aug‐10 MMHW‐OC‐ISD 27
For 
Select recon  Enter % sumbit Save
code 

26‐Aug‐10 MMHW‐OC‐ISD 28
REPAIR REGISTER HISTORY

Click here

26‐Aug‐10 MMHW‐OC‐ISD 29
ASSET REPAIR REGISTER HISTORY

Click here for 
selecting asset

Select the Nature of 
defect.Predefined by 
HQ.

26‐Aug‐10 MMHW‐OC‐ISD 30
ASSET REPAIR REGISTER

Select 
asset 
t
code

Select the  Select the 
Nature of  type of 
defect repair

26‐Aug‐10 MMHW‐OC‐ISD 31
ASSET SURPLUS

Click 
here

26‐Aug‐10 MMHW‐OC‐ISD 32
Select asset 
code

User name comes’ ’
automatically

26‐Aug‐10 MMHW‐OC‐ISD 33
REPORTS-REPAIR REGISTER VIEW

SSelect asset 
l t t
code

26‐Aug‐10 MMHW‐OC‐ISD 34
Data can be 
downloaded in xls
format

Select 
period Select 
p
period

26‐Aug‐10 MMHW‐OC‐ISD 35
LOG SHEET VIEW

Click here

26‐Aug‐10 MMHW‐OC‐ISD 36
26‐Aug‐10 MMHW‐OC‐ISD 37
ASSET MINOR ALLOCATION REPORT

Click here

26‐Aug‐10 MMHW‐OC‐ISD 38
Select month Click 
here

26‐Aug‐10 MMHW‐OC‐ISD 39
26‐Aug‐10 MMHW‐OC‐ISD 40
REPAIR REGISTER HISTORY VIEW

26‐Aug‐10 MMHW‐OC‐ISD 41
Select 
month

26‐Aug‐10 MMHW‐OC‐ISD 42
ASSET CP INTEGRATION DETAILS

Select 
month

26‐Aug‐10 MMHW‐OC‐ISD 43
Select  Click her 
system for getting 
reports

26‐Aug‐10 MMHW‐OC‐ISD 44
IHC CP PROCESSING

Click 
here

26‐Aug‐10 MMHW‐OC‐ISD 45
SSelect 
l t
month

Click on view 
Click on view
missing asset 
Pending log 
sheet data

26‐Aug‐10 MMHW‐OC‐ISD 46
After clearing once again  
click till the msg box 
coming 

26‐Aug‐10 MMHW‐OC‐ISD 47
See the 
status
status 
Select  whether 
Give 
trial run  pending or 
request
completed

26‐Aug‐10 MMHW‐OC‐ISD 48
VIEW MISSING COST ALLOCATION

Click 
here

26‐Aug‐10 MMHW‐OC‐ISD 49
Select
Select 
month

Click 
here
For 
saving

Click 
Select 
l save
Select 
go Click 
Enter  recon
% allocate

26‐Aug‐10 MMHW‐OC‐ISD 50
CP DATA

Click 
here

26‐Aug‐10 MMHW‐OC‐ISD 51
Select
Select 
month

26‐Aug‐10 MMHW‐OC‐ISD 52
Click go
Click go

Select 
month

26‐Aug‐10 MMHW‐OC‐ISD 53
CP FINAL RUN

Select 
Give request  final 
for closing the  run
month

26‐Aug‐10 MMHW‐OC‐ISD 54
ASSET REPAIR REGISTER STATUS

26‐Aug‐10 MMHW‐OC‐ISD 55
ASSET PERFORMANCE REPORT

26‐Aug‐10 MMHW‐OC‐ISD 56
REPORT

26‐Aug‐10 MMHW‐OC‐ISD 57
ASSET PERFORMANCE REPORT

Put the 
job code

26‐Aug‐10 MMHW‐OC‐ISD 58
ASSET PERFORMANCE REPORT

26‐Aug‐10 MMHW‐OC‐ISD 59
ASSET PERFORMANCE REPORT

26‐Aug‐10 MMHW‐OC‐ISD 60
CP COMPONENTS DETAILS
Comp.
CP Components Formula Source
No.

1 Assetcode Plant Master


Equipment
Plant Master
2 Description
IHC Rate Per Month *( No Of Working Days for the Month / Total Days For Plant Master/
IHC
3 the Month) - (No. of Break down Hour's IHC if Break down is more than 24 Log sheet
((Acquisition Value * Depre Percentage) / 100)/12 * ( No Of Working Days for Plant Master/
Owning Cost

Depreciation
4 the Month / Total Days For the Month) Log sheet
((Book value + (Book value - Depreciation For the Year))/2)*(Cost
Year))/2) (Cost Of Capital
Cost of Capital Plant Master
5 Percentage/100)/12
Insurance Total Insurance * (Acquisition Value/ Total Available Asset's Acquisition Value) FAS
6
Road Tax FAS
7
Total Owning cost [4+5+6+7]
8
Operation Labour WOM
9
perating Cost

Maintenance Labour WOM


10
Spares SCM
11
Agency
g y Repairs
p
Op

12 WOM
FAS/REGIONAL
Staff Total Staff Cost * (IHC Value/ Total Available Asset's IHC Value)
13 BOOKING

Total Operation Cost [9+10+11+12+13]


14
Total Plant Cost For
[8+14]
15 P&M

16 Fuel SCM
Lubricants
17 SCM
Other Consumable
18 SCM
Total Fuel
[16+17+18]
19 OilConsumable Cost
Total Plant Cost For
[3+19]
20 Job