Harga Pokok Pabrik (HPP)
Harga Pokok Pabrik (HPP)
251
PT (Persero)
Departemen Pemasaran Produk Pengecoran
BAHAN MODEL
Material Referensi HCCI pak pur
LINER 6 - 100T, LINER 6D - 100T, LINER F1 - 100T,
Nama Barang DWG 0133C1- DWG 0133C1-M- DWG 0200B9-
M-071025 071025 M-012132-B
Berat / pcs 23.00 kg 47.00 kg 24.00 kg
Jumlah 25.00 bh 25.00 bh 16.00 bh 66.00
Berat total 575.00 kg 1,175.00 kg 384.00 kg 2,134.00
Volume Harga Total
No Material
Pemakaian Satuan (Rp) (Rp)
1 Kayu Jati - 6,250,000.00
2 Kayu Kamper 0.05 3,450,000.00
3 Plywood 3 mm 1.00 43,500.00
4 Plywood 6 mm - 70,500.00
5 Plywood 9 mm - 110,000.00
6 Plywood 12 mm - 142,000.00
7 Plywood 15 mm 2.00 180,000.00
8 Plywood 18 mm 1.00 210,000.00
9 Plywood 24 mm - 360,000.00
10 Dempul & Hardener 0.50 95,000.00
11 Ampelas
12 Lain-lain
- Paku, Skrup, Ampelas dll.
Pattern Repair : (ex. 9.13.289) 1,500,000.00
Total 1,500,000.00
1/3
PLG 9.14.251
BAHAN POKOK MELTING
Dapur / Tonage cairan Ind. Furnace / 2,000 Kg
Material Referensi HCCI
BAHAN FINISHING
LINER 6 - 100T, LINER 6D - 100T, LINER F1 - 100T,
Nama barang : DWG 0133C1- DWG 0133C1-M- DWG 0200B9-
M-071025 071025 M-012132-B
Berat / pcs : 23.00 kg 47.00 kg 24.00 kg
Jumlah pesanan : 25.00 bh 25.00 bh 16.00 bh
Berat total : 575.00 kg 1,175.00 kg 384.00 kg 2,134.00 kg
Volume Harga Total Harga
No Material
Pemakaian Satuan (Rp) (Rp)
I. FETTLING
1 Steel Shoot 28.45 13,000.00 369,893.33
2 Oksigen Cair 2,500.00 0.00
3 Acetylene 235,000.00 0.00
4 Batu Gerinda Dia 180/20 x 6 14.23 19,500.00 277,420.00
5 Batu Gerinda Dia 510/50 x 60 0.11 4,560,750.00 486,632.03
6 Batu Gerinda Dia 600/108 x 60 5,226,750.00
7 Penetrant test 1.42 250,000.00 355,666.67
8 Packing 3.00 200,000.00 600,000.00
II. HEAT TREATMENT
- Annealing Furnace :
- Continous Furnace :
1 Gas (60 m3 / jam operasi) 682.88 5,000.00
2 NTB 2,134.00 250.00
Total 2,089,612.03
2/3
PLG 9.14.251
TARIP MESIN
LINER 6 - 100T, LINER 6D - 100T, LINER F1 - 100T,
Nama barang : DWG 0133C1- DWG 0133C1-M- DWG 0200B9-
M-071025 071025 M-012132-B
Berat / pcs : 23.00 kg 47.00 kg 24.00 kg
Jumlah pesanan : 25.00 bh 25.00 bh 16.00 bh
Berat total : 575.00 kg 1,175.00 kg 384.00 kg 2,134.00 kg
U P A H
Tenaga Jam Tarip / Jam Total
No. U r a i a n Terpakai Operasi ( Rp ) ( Rp )
(Orang) (jam)
1 Pola / Model 2 42.00 45,096.00 3,788,064.00
2 HM 3 36.01 49,919.00 5,392,936.77
Continuous Mixer 1 9.80 49,919.00 489,166.95
3 Inti: 1 10.80 49,919.00 539,293.68
- Batch Mixer 1 13.07 49,919.00 652,222.60
4 Arc Furnace
5 Ind. Furnace 2 Ton 4 9.11 50,644.00 1,846,142.61
6 Fettling :
- Shake Out 1 8.54 48,763.00 416,240.97
- Potong 2 21.34 48,763.00 2,081,204.84
- Shoot Blast 1 8.54 48,763.00 416,240.97
- Grinding 2 35.57 48,763.00 3,468,674.73
7 Heat Treatment & Sementasi 2 11.38 48,763.00
Total 19,090,188.11
3/3
PT (Persero)
Dep. Pemasaran Produk Pengecoran
Total ( A1 ) = Rp 79,140,896.70
Total ( A2 ) = Rp 24,869,977.41
Total ( A3 ) = Rp 0.00
HPP - A = Rp 104,010,874.10
Jumlah I = Rp 104,010,874.10
Disetujui : Direksi / Kadept.
II. Overhead . . . . . .
1/2
PLG 9.14.251
II. OVERHEAD
1. Overhead ) x HPP - A = Rp
2. Overhead )> 10.00% x HPP - A = Rp 10,401,087.41
3. Overhead ) x HPP - A = Rp
Jumlah II = Rp 10,401,087.41
1. Bunga ) x HPP - A = Rp
2. Bunga )> 5% x HPP - A = Rp 4,727,814.28
3. Bunga ) x HPP - A = Rp
Jumlah IV = Rp 10,401,087.41
Dibulatkan = Rp 129,846,800.00
Casting / kg = Rp 60,846.67
Casting / bh
LINER 6 - 100T, DWG 0133C1-M-071025 = Rp 1,200,000.00
LINER 6D - 100T, DWG 0133C1-M-071025 = Rp 2,450,000.00
LINER F1 - 100T, DWG 0200B9-M-012132-B = Rp 2,412,300.00
V. PAJAK - PAJAK
CM 35.97
PPN 10.00% = Rp 12,984,680.00
2/2
MATERIAL BALANCE HCCI (28% Cr)
U/ IF 2 T
No. Nama Material Berat Komposisi Kimia (%) No Nama Material Kom
% Kg C Si Mn P CrS C
1 Steel Scrap 48.35 967.00 0.03 ### 0.13 ### ### ### 1 Steel Scrap 0.06
2 Return Scrap HCCI 20.00 400.00 0.30 - 0.12 0.01 0.01 5.20 2 Return Scrap 1.50
3 Carburizer 0.75 15.00 0.68 ### ### ### ### ### 3 Carburizer 90.00
4 Fe Si 0.20 4.00 0.00 0.14 ### 0.00 0.00 ### 4 Fe Si 0.20
5 Fe Mn HC 0.60 12.00 0.04 0.01 0.39 0.00 0.00 ### 5 Fe Mn HC 6.50
6 Fe Mn MC 0.10 2.00 0.00 0.00 0.06 0.00 0.00 ### 6 Fe Mn MC 3.70
7 Fe Cr HC 24.00 480.00 1.68 0.36 ### 0.01 0.00 15.60 7 Fe Cr HC 7.00
8 Fe Cr LC 11.00 220.00 0.01 0.11 ### 0.00 0.00 6.60 8 Fe Cr LC 0.06
Total 105.00 2,100.00 2.73 ### ### ### ### ###
Standard 2.60 0.20 0.60 0.04 0.06 26.00
- - - -
2.80 0.80 0.80 max. max. 28.00
22
65
1 684 31
10 848
10 165
8.25
350,000 12 bln
5 th
60
21,000,000 5 th
4,200,000 per thn
350,000
Komposisi Kimia (%)
Si Mn P S Cr
- 0.26 - - -
- 0.60 0.04 0.06 26.00
- - - - -
70.00 - 0.05 0.02 -
1.00 65.00 0.40 0.02 -
1.30 60.00 0.40 0.02 -
1.50 - 0.04 0.02 65.00
1.00 - 0.04 0.03 60.00
4545
1.23457E+20