The bulkhead is a fixed transverse panel that is welded to a steel frame to form a stiff structure for the mould, including a working platform. The bulkhead is used for short line moulds. The stop-end is a mobile bulkhead used as the transverse panel for long line moulds in the first segment and short line moulds in the middle segments. Hazards are analyzed and risks assessed in method statements to identify control measures to mitigate risks. Personnel are trained and use PPE, while tools and equipment are checked before use. Emergency response procedures are in place.

Uploaded by

Vignesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
88 views3 pages

Method Statement For General Pre-Casting Works at Pre-Casting YardPart-4

The bulkhead is a fixed transverse panel that is welded to a steel frame to form a stiff structure for the mould, including a working platform. The bulkhead is used for short line moulds. The stop-end is a mobile bulkhead used as the transverse panel for long line moulds in the first segment and short line moulds in the middle segments. Hazards are analyzed and risks assessed in method statements to identify control measures to mitigate risks. Personnel are trained and use PPE, while tools and equipment are checked before use. Emergency response procedures are in place.

Uploaded by

Vignesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

The bulkhead is the fixed transverse closing panel of the mould.

The bulkhead is welded on


steel frame to create a very stiff body, including a working platform with stairs, walkway and
removable parapets for the passage of the inner forms. The bulkhead is used for the short line
moulds (SLT & SLP).
 Stop-End (S/E)

The Stop-end is the mobile bulkhead, used as transverse closing panel of the mould, shared
between LLT mould (first segment of the span “S1”), and also for the SLT mould (middle
segment of the span “S6”). For further details, refer to the following method Statements:

 Casting sequence for Short Line Typical segments HCMC-261-CSYD-CWS-MST-


00017
 Casting sequence for Long Line Typical segments HCMC-261-CSYD-CWS-MST-
00018

2. SAFETY & ENVIRONMENTAL RISKS

2.1 HAZARD ANALYSIS & RISK ASSESSMENT


Hazards Analysis and Risks assessment are carried out and attached in each Method
Statement. This document will identify all the hazards to ensure adequate control measures
and strategies are in place to mitigate as much as possible the risks.

All personnel carrying out the work will be properly trained by experienced supervision.
Besides, all personnel shall wear the appropriate PPE (Personal Protective Equipment), such
as Safety shoes, safety helmet and safety harness if required.
2.2 TOOLS AND EQUIPMENT

All tools & equipment shall be in safe condition before utilisation and fit for its purpose.
Where applicable, before each shift, equipment shall be visually checked for the mechanical
and structural soundness.
2.3 EMERGENCY RESPONSE

In the event of an accident/incident, response will carried out in the appropriate procedure,
such as:

 Remedial Actions, proposing actions to ensure that the Accident/Incident will be


fully fixed, as required, managed by the Responsible within a target date.
 Preventive Actions, proposing actions to ensure that the Accident/Incident will never
happen again, including for example: Toolbox Meeting (TBM) held by the Safety
Officer to ensure that Site Team (Workers, Supervisors & Engineers) fully understand
methods & risks.

Prestart and Toolbox talk will reinforce safety requirements prior to commencement of the
work.

3. CONSTRUCTION RESOURCES

In principle every type of work involves the following resources:


3.1 PERSONNEL

The personnel involved are such as:

 Precasting yard Manager


 Segment casting Superintendent
 Site engineers
 QA/QC Engineers
 Safety Officers
 Environmental engineer
 Supervisors
 Surveyors
 Plant Operators (Tower cranes & Gantry Cranes)
 Finishing workers
 Steel fixers
 Riggers
 Reinforcement workers
 Others workers