100% found this document useful (3 votes)
1K views1 page

Phase Control For P&ID

This document outlines the key documents and deliverables in a project lifecycle from preliminary design through construction and commissioning. It includes preliminary piping and instrumentation diagrams, equipment data sheets, hazard and operability studies, vendor drawings, 3D models at various design stages, and documents for construction and as-built. The purpose is to plan the piping and equipment layout, design the piping, incorporate vendor details, indicate Hazop study results, and confirm the design for construction.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
1K views1 page

Phase Control For P&ID

This document outlines the key documents and deliverables in a project lifecycle from preliminary design through construction and commissioning. It includes preliminary piping and instrumentation diagrams, equipment data sheets, hazard and operability studies, vendor drawings, 3D models at various design stages, and documents for construction and as-built. The purpose is to plan the piping and equipment layout, design the piping, incorporate vendor details, indicate Hazop study results, and confirm the design for construction.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PDP Document

Licensor’s P&ID
Licensor’s PFD, UFD
Licensor’s Equip. Data Sheet, Tag No
Licensor’s Inst. Tag No
Planning of Piping Route

Equipment List
Purpose for Issue
Instrument List
- P&ID Study
Abbreviation of DWG and Symbol - Planning for Equipment Layout
- Detail Equipment Data Sheet
Piping Material Class - Design of Piping Layout
- Piping B/Q
Plot Plan

Preliminary P&ID
Initial 3D Model
(40% P&ID)
Mech. Equip. Data Sheet

Size of Safety Valve


Purpose for Issue
- HAZOP Study
Piping Accessory
- Piping Study
Approval for Design - Piping Arrangement Drawing
Instruments Tag No., Type
(60% P&ID) - Instrument Specification
Size of Control Valve - Equipment Specification
Interlock System
30% 3D Model

Marked-up P&ID by Purpose for Issue


Piping / Instrument Group
Approval for - Indication of Result of Hazop
Hazop Study Report Study
Construction
Detail Spec. from Vendor (Issue for Approval) - Feed-Back from Vendor Print
(80% P&ID) - Piping Isometric Drawing
Detail of Control System
60% 3D Model
Final Vendor Prints
Purpose for Issue
For Construction
Adjustment of Piping Drawing
(Issue for Construction) - Confirmation for Construction
(90% P&ID) - Planning for Precommissioning
Adjustment of Control System
& Commissioning Plan

90% 3D Model
Piping Work Package For As built