Ice Cream Truck Project: Engineering Economy (IE255)
Ice Cream Truck Project: Engineering Economy (IE255)
1
Ice Cream Truck Project
Table of Contents
Introduction:.................................................................................................................3
Project Management:...................................................................................................3
Deployment chart:....................................................................................................3
Gantt chart:...............................................................................................................3
Problems’ Definition and Results:..............................................................................4
Cost Estimation.........................................................................................................4
Cash flow diagram....................................................................................................5
Conclusion:...................................................................................................................5
References:....................................................................................................................6
Appendix A (Meeting Agenda):..................................................................................7
Appendix B (Excel sheet):...........................................................................................8
List of Table
List of Figures
Figure 1: Cash flow dighram......................................................................................5
2
Ice Cream Truck Project
Introduction:
Project Management:
One of the requirements of the IE255 Project is to create a Gantt chart using
the tasks that were assigned to each member and its timeline. The first table will
illustrate our tasks disruption to the team members the second one shows how much
time each task will take.
Deployment chart:
Gantt chart:
3
Ice Cream Truck Project
First, we have gathered information about the costs of each item in our project.
We have used some websites to find information. After that, we will study if the
project is financially viable or not. The lifetime of the project is five years. The
minimum attractive rate of return of the project is 7%/year, and the cost of the items is
shown in Table3. For the market value of the truck, the price will decrease by 15%
every year. For the salvage value of the ice cream machine, after five years no one
will buy it so it will be sold as scrap. Scrap can be sold by 6 SR/kilo, the machine
weight is almost 200 kilograms, so its salvage value is 1200SR.
Cost Estimation
ITEM COST
Ford Transit Custom (1) 105,000SR
M & O for Ford Transit Custom 3,500SR/year
Ice cream machine 25,000 SR
M & O for Ice cream machine 300SR/year
Preparing the truck 23,000SR
Utility (Electricity and Water) 1,500SR/year
Salary of Worker 18000/year
Ice cream mix [2] 0.5SR/unit
Ice cream cone [2] 0.4SR/unit
Salvage value for Ice cream machine 1200SR
Market value of truck after 5 years 52277SR
ITEM COST
Ford Transit Custom (1) 105,000SR
M & O for Ford Transit Custom 3,500SR/year
Ice cream machine 25,000 SR
M & O for Ice cream machine 300SR/year
Preparing the truck 23,000SR
Utility (Electricity and Water) 1,500SR/year
Salary of Worker 18000/year
4
Ice Cream Truck Project
242,477SR
189,000SR
151,200SR
113,400SR
75,600SR
0 1 2 3 4 5
A= -23,300SR
-128,000SR
Figure 1: Cash flow dighram
Conclusion:
5
Ice Cream Truck Project
References:
[1]:https://ar.aljazirahford.com/Product/1632?typeId=7
[2]:https://haraj.com.sa/1135044680/**42125745**42763639**25886061**3553873
4**42335847**42321551**41004936**42629851**34315052**35044680**356306
62**34982099**39762769**42294328**31639168**42132464**40661115
6
Ice Cream Truck Project
Table 6: Attendees
Results:
7
Ice Cream Truck Project