0% found this document useful (0 votes)
154 views15 pages

Section - 9: Bangladesh, Matarbari 2 X 600MW Coal Fired Power Plant Project

This document is about a proposed 2 x 600MW coal fired power plant project in Matarbari, Bangladesh. It includes 15 sections related to drawings, documents, and specifications for the project. The project involves building two 600 megawatt coal power plant units near Matarbari, Bangladesh.

Uploaded by

ruhul01
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
154 views15 pages

Section - 9: Bangladesh, Matarbari 2 X 600MW Coal Fired Power Plant Project

This document is about a proposed 2 x 600MW coal fired power plant project in Matarbari, Bangladesh. It includes 15 sections related to drawings, documents, and specifications for the project. The project involves building two 600 megawatt coal power plant units near Matarbari, Bangladesh.

Uploaded by

ruhul01
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 15

Bangladesh, Matarbari

2 x 600MW Coal Fired Power Plant Project

SECTION – 9

DRAWINGS AND DOCUMENTS


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1GMH01891 Y = 3000

N
National Bench Mark
National
N
Naat Bench Mark
GPS6010
GP
(E:384669.838,
(E:
E N:2402479.557)
Y = 2800

Y = 2600

GPS6010 THIS DRAWING A


Y = 2400

Y = 2200
(E:384669.838, N:2402479.557)
DRAWING NO.

Y = 2000

W E
Y = 1800 EMBANKMENT-1E
EM
MB
M B EN
NT
NT (+14.0
4..0
4 0 m) EMBANKMENT-
BA
BA
AN
NK T- 2
(+10.0
0 m)
0.0 m

A
3A
EMBANKMENT-3A
0.0 m)
(+KME
(+10.0
KM
K
NK
Y
Y = 1600 ARR
ARY

E BBO
BOUNDAR

MSL
DEVELOPMENTAREA-1+10.0m
FUTURE
E
SIT
SSITE
0mm)
(+14.0
((+14
D
-1D
N
NT

5YEARS)
1ST
POND(FOR
ASH
ENT-1D
ME
KMENT
KM
Y = 1400

S
MBA +1.0m
1.0m MSL
MS
EMBAN

MSL
SL
SL
14.0 m)

+14.0m
0m
+14
ANKMEN -1F (+14.0

m)
A

ENT
(+10.0
Seawall
of
Face
F
EMBANKM
ANKM
EMBANKMENT-1F

+10
Y = 1200

E
ENT-3B
T-3B

EAST
ST
3
EMBANKMENT-1A
BA
A
AN T--1
T -1 (+14.0
0 m)
m EMBANKMENT-1B
EM
E ME
EN
E (+14.0
+1
14.
4 m) ASH D
DI
DIS
DISPOSAL
IS AR
AREA
RE
RE
EAA

EN
NKME
ME
ANKM
EM
E

BAN
N
EMBA
A
BA
Y = 1000

E
m)EMBANKMENT-8(+10.0m)
MSLEMBANKMENT-1C(+14.0
AREA-3+1.0m
DEVELOPMENT
FUTURE
MSL
AREA-2+1.0m
DEVELOPMENT
FUTURE
F+1
Y = 800 ELE.+1.0
ELE.+6.0 ELE.+10.0 ELE.+6.0

ELE.+1.0
ELE.+1.0
ELE.+1.0

ELE.+5.0
ELE.+6.0 ELE.+10.0 ELE.+14.0 ELE.+10.0 ELE.+6.0
ELE.+1.0

ELE.+2.5

+5.0
ELE.+5.0

ELE.+10.0

ELE.+10.0 ELE.+5.0 ELE.+1.0

T
NT
M
ME
TME UNIT 1

HRREVETMEN
UNIT 2

NORTH
NORT
NO
N

Y = 600

m))
X X X X X X X X X X X X X X X X X X X
X X X

X
X

X
4.0

X
X
+14

X
(+14.0

X
X
4A

X
X

X
X
NT-

X
X X X X X X X X X X X X X X X X X X X X X X X X X

+5.0m
m MSL
M L ENT-
ANK
BA
Y = 400 EMBA
EMBANKM

M
MSL
0m
0m
.0m
X X X

+14.0m
NT

MSL
MSSL
L

X
MS

X
X

X
FO
FOR
OR FUTURE
FUT
TU

X
+5.0m
m

X
X X X

55...5........5.....5.5.0..00
MBA
EMBANKME

++5
FOR
R

U
FUTUREE

OUTH
OU
O
SOUTH
SO
Y = 200
ELE.+10.0 ELE.+5.0
ELE
LE.+
ELE.+1.0

Y=0

Basis Point of Plot Plan

GATE
MAIN
+7.0m
7.0 MSL
7.0m SLL

Y = -200

Y = -400
(X=0,Y=0) National Bench Mark B
MB8508
Y = -600

(E:383295.616, N:2398788.388)
Y = -800

Y = -1000

X = -2400

X = -2200

X = -2000

X = -1800

X = -1600

X = -1400

X = -1200

X = -1000

X = 1000

X = 1200

X = 1400

X = 1600

X = 1800

X = 2000

X = 2200

X = 2400

X = 2600

X = 2800

X = 3000

X = 3200

X = 3400

X = 3600

X = 3800

X = 4000

X = 4200
X = -800

X = -600

X = -400

X = -200

X = 200

X = 400

X = 600

X = 800
X=0
REV.MARK

FINAL CO-ORDINATES OF PROPERTY BOUNDARY OF CPGCBL


(AFTER ACQUISITION OF ADDITIONAL AREA)
IN GLOBAL CO-ORDINATE SYSTEM
C POINT NO EASTING(M) NORTHING(M) REMARKS C
2 N1 383505.467 2401568.437
N2 383605.265 2401472.723
N3 383604.793 2401421.715 -
N4 383599.220 2401318.600
N5 383582.757 2401093.860
N6-A 383576.927 2400898.131
N7-A 383627.489 2400896.364
D N N8-A 383822.521 2400889.637 - D

N9-A 383936.096 2401038.430


Y = 2200 N10-A 384382.955 2401350.974
N10 384424.675 2401291.325
N11 384711.389 2401508.862
N12 385222.157 2401526.203 -

W E N13 385781.159 2401541.231


Y = 2000 N14 386405.620 2401535.074
E E
N1
N15-A 387048.000 2401518.312
N13 N14 N16-A 387422.479 2401530.369
N12 N15-A N16-A
N11
S N16 387433.105 2401485.546
N2 N16
N NN
N17 387430.873 2401370.375
W E
NN
Y = 1800 W 15%
17 N3 EMBANKMENT-1E (+14.0 m) N18 387424.676 2401307.045
N

N EMBANKMENT- 2
E

10% N19 387402.857 2401175.787


W

N17
EN

(+10.0 m) -
WN

5%
N10-A
E

N20 387385.477 2401128.879

EMBANKMENT-3A
W
E

N4 N18

(+10.0 m)
N21 387264.453 2400949.897
F N10 F
WS

N22 387159.392 2400783.650


E
ES
W

Y
Y = 1600 AR FUTURE DEVELOPMENT N23 387042.813 2400561.483
ND
SW

SE

SS
W E OU AREA-1 N24-A 386866.440 2400359.100
S SS
EB +10.0m MSL
SIT N19
WIND ROSE N25 386671.253 2400135.987
m) N20
.0
14 N26 386385.161 2399964.000
(+
D ASH POND
27
16 N5
NT
-1 N27 386045.458 2399801.724
(FOR 1ST 5YEARS)
N9-A K ME N28 385868.615 2399749.112
Y = 1400 B AN +1.0m MSL
G EM N29 385596.556 2399659.665
G

L
MS
N30 385280.256 2399593.382 -

EMBANKMENT-1F (+14.0 m)

m
N21

4.0
15 N31 384528.569 2399306.133

+1
m)
121

NT
N7-A
N32 384295.689 2399395.522

ME
.0
Face of Seawall
N6-A N8-A

NK
10
N33 384113.876 2399457.584

BA
(+
Y = 1200

EM
N34 383959.508 2399498.703

ST
-3
EMBANKMENT-1A (+14.0 m) EMBANKMENT-1B (+14.0 m) ASH DISPOSAL AREA

EA
N35 383573.389 2399770.107

NT
EMBANKMENT-1C
PORT WORK POWER PLANT WORK N22

ME
N36-A 383526.816 2399801.647

(+14.0 m)

NK
N37-A 383334.981 2399795.634
H H

EMBANKMENT-8

X
X

X
X
X

X
X

X
X

X
X
X

X
X

X
X

X
X
X

X
X
X

X
X

X
X

X
X

BA
X

X
X

X
X X

X
X

X
X

X
X

X
X
X

X
X

X
X

X
X
X

X
X

X
X
X

X
X
X
X

X
X
X

X
X
X

X
X

X
X
X

X
X
X
X

X
X X

X
X

X
X

X
X
X
X X

X
X
X
X

X
X

X
X

X
X
X

X
X
X
X X

X
X

X
X

X
X

X
X
X

X
X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X
X

X
X
X X X

X
X
X

X
X

X
X

X
X

X
X
X X

X
X

X
X

X
N38-A 383244.714 2399794.906
X

X
X

X
X

X
X

X
X
X
X X

X
X
X

X
X

X
X

X
X

X
X
X

X
X
X

X
X
X
X

X
X
X

X
X X

X
X

X
X X

X
X

X
X
X
X

X
X
X X
X
X

X
X

X
X

X
X
X X

X
X
X

X
X

X
X

X
X
X

X
X
X
X

X
X
X

X
X

X
X

X
X
X

X
X

X
X X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X X

X
X

X
X

X
(+10.0m)

X
X

X
X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

EM X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X
X

X
X

X
X
X

X
X
X

X
X
X

X
X
X

X
X
X

X
X
X

X
X
X

X
X

X
X

X
X

X
Y = 1000

X
X

X
X

X
X
X

X
X
X

X
X
X

X
X

X
X
X
X

X
-

X
X
X
X

X
X

X
X
X
X

X
N39-A 383149.343 2399792.846
X

X
X
X
FUTURE DEVELOPMENT AREA-3 FUTURE DEVELOPMENT AREA-2
X

X
X

X
X

X
X
X
X

X
X

X
X
X
X

X
X

X
X

X
X
X

X
X

X
X

X
X

X
X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X
X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X
X

X
X

X
X

X
X

X
X
X

X
X

X
X

X
X
X

X
X

X
X

X
X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X
+1.0m MSL +1.0m MSL

X
X

X
X

X
X

X
X
X

X
X
X

X
X
X

X
X
X

X
X

X
X
X
X

X
X

X
X
X

X
X

X
X

X
X
X

X
X

X
X

X
X
X

X
X

X
X

X
X

X
X
X

X
X

X
X

X
N39-B 383120.121 2399793.430

X
X
X

X
X
X

X
X

X
X
X
X

X
X

X
X
X
X

X
X

X
X
X
X

X
X

X
X
X
X

X
X
X

X
X
X

X
X

X
X

X
X
X

X
X

X
X

X
X

X
X

X
X
X

X
X

X
X

X
X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X
X

X
X

X
X

X
X

X
X

X
X
X

X
X
X

X
X
X

X
X

X
X

X
X

X
X

X
X
X

X
X

X
X

X
X

X
X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X
X

X
X

X
X
X

X
X

X
X
X
X

X
X

X
X
X

X
X
X

X
X
X

X
X
X

X
X

X
X
X
X

X
X

X
X

X
N40-A 382712.823 2399785.422

X
X

X
X

X
X

X
X

X
X
X
X

X
X

X
N23

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X
X

X
X

X
X

X
X

X
X

X
X
X

X
X

X
X

X
X
X

X
X

X
X

X
X

X
X
X

X
X

X
X

X
X

X
X
X

X
X
X

X
X

X
X
X
X

X
X

X
X
X
X

X
X

X
X
X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X
X

X
X

X
X

X
X

X
X
X

X
X

X
X
X

X
X

X
X

X
X

X
X
X

X
X

X
X

X
X

X
X

X
X

X
X
X

X
X

X
X

X
X

X
X

X
X
X
X

X
N41-A 382688.080 2399784.542
HOLD N42 382577.555 2399713.320
301

Y = 800 51 52 220 N43 382333.536 2399501.768


ELE.+6.0 ELE.+10.0 ELE.+14.0 ELE.+10.0 ELE.+6.0
ELE.+1.0

ELE.+2.5

-
53
ELE.+6.0 ELE.+10.0 ELE.+6.0 ELE.+1.0

N44 382262.504 2399424.624


ELE.+1.0 ELE.+1.0

I I
ELE.+5.0

ELE.+5.0

ELE.+10.0

10
ELE.+10.0 ELE.+5.0 ELE.+1.0

17
N45 382105.179 2399433.580
ENT 16 25
18 N24-A
E TM 46 15
UNIT 1

REV 35 37
32 301 108 106 103 205
UNIT 2
204 25 201 202
RTH 37
34 43 16 17 16 104 104105 206 218 217
NO 107 219 207
40 33 219
46 41 5 161
11 102 101
159 92
Y = 600

X
X

X
X

X
X

X
X X X X X X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
46

X
X

X
X

X
X

X
X

X
X

X
X
X

X
X

X
X

X
X X X X X X

X
X

X
X

X
X

X
X
154
X X X X X X X X
X X X X

152 151

X
X
X
X

X
X

X
X

X
12

X
216

X
X

X
13

X
X

X
X

X
X
133 38

X
X
44

X
X
11

X
X

X
09

X=808.610
Y=498.450

X
34

X
X

X
X

X
X

X
X
89 132

X
26
X X X X X X X X X X


31 13
33 155 132 02 160 30 158
88 m)
X X X X X X X X X X X X X X X X X X X

X
X

X
X
X
X

X
X
X
X X X X

X
X

X
X X X X X X

X
X X X X

X
X X X X X X

X
X

X
X

X
X

X
X

X
X

X
X

X
X X X

X
X

X
X

X
46
12 12 07 133 06

X
X

X
X
19

X
X

X
X
X
X
X
X
N25

X
X
X
X
X
84

X
X
X
X
X X X X

X
X X

X
X X X X X X X X X X X X X X X X

.0

X
01 05

X
X

X
X
X
46

X
X
X
X
X
X

X
X

X
X X X X

X
X X X X X X

X
X X X X

42 14

X
153 301

X
159

X
302 18HOLD215 03 A (+

X
LEVEL IN EL
HOLD

X
85 81

X
-4

X
DESCRIPTION

X
J 45 J

X
X
34
X X X X X X X X
X X X X

102

X
X
X

X
35 152 151 HOLD-2 T (METERS)

X
X

X
X

X
X

X
14 19

X
12

X
133101 EN

X
X
X

X
X

X
X
EMPLOYER'S

X
X X X X X X X X X X X X X X X X X X X X X X X X X

X
+5.0m MSL

X
33

X
X

X
X

X
M

X
09

X
X
35

X
NK

X
X
87

X
13

X
X
132 02

X
13
X X X X X X X X X X

46 26 SCOPE BA
46
Y = 400 220
83 86
82 11 133
132 38
05 24 401
HOLD-2
EM
34 157 12 08
47 N26
21 46
33 35 36 HOLD 35 37 62 61 131 14 MS
L
m
32 55 74 78.678.5 76 14.0
37 54 54 T+
X X X

156 EN

X
L

X
72 04
MS

HOLD80

X
KM

X
171 FOR FUTURE

AN

X
54 54

X
.0.0m

79 MB
X X X

22 75 71 HE
+5

303 304 4 56
78.4 78.3 78.2 91 78.1 93
FOR

23 9 UT
FUTURE

57 301 73 SO
Y = 200 29
28 24 77
5
ELE.+10.0 ELE.+5.0 ELE.+1.0

N27
3400
ID
N39-B N38-A
K N41-A N36-A K
N39-A N37-A
N40-A N28
N35 6 FUTURE 19
FUTURE 221
FUTURE POTABLE WATER
N42 203
PIPING TO TOWNSHIP
N29
208
Y=0 MAIN GATE

Basis Point of Plot Plan N30


(X=0,Y=0)
N43 +7.0m MSL
L L
N34
N33
Y = -200 N45
N44 N32

N31 0 100 200 300 400m

Y = -400
M M

Y = -600

Revision History

Rev. Date Description Prepared by Checked by Approved by

N National Bench Mark A


- 22-12-2017 First Issue for Approval

10-09-2018 Revised as per Engineering Progress


K Hase
K Hase
A Kinoshita Y Sugimori
A Kinoshita Y Sugimori
N
MB8508 B 05-11-2018 Revised as per Engineering Progress K Hase Y Ishikawa Y Sugimori

Y = -800
Revised for approval; as per Engineering Progress, Owner Y Sumi/
(E:383295.616, N:2398788.388) C 05-09-2019
comments
Revised for approval; as per Engineering Progress, Owner S Takamizawa
K Hase
Y Sugimori T Shintani

0 26-05-2020 T Shintani T Shintani


comments / K Hase

Employer : Engineer :

Coal Power Generation


Matarbari Joint Venture
Company Bangladesh MATARBARI JVC
X = -2000

X = -1800

X = -1600

X = -1400

X = -1200

X = -1000

Consultant
X = 1000

X = 1200

X = 1400

X = 1600

X = 1800

X = 2000

X = 2200

X = 2400

X = 2600

X = 2800

X = 3000

X = 3200

X = 3400

X = 3600

X = 3800

X = 4000
X = -800

X = -600

X = -400

X = -200

Limited
X = 200

X = 400

X = 600

X = 800

Contractor :
X=0

The Consortium of Sumitomo Corporation, Toshiba Energy Systems


& Solutions Corporation and IHI Corporation

O O
Project :

FOR APPROVAL
Matarbari Ultra Super Critical Coal-Fired Power Project
Contract Number :
CPGCBL/MAT/PKG1.2/2017/1338
Drawing Title :

PLOT PLAN
Date : 22/12/2017 Scale : 1:6000 Ori. Size : A0 Status : For Approval
Responsible Dept. : Prepared by : Checked by : Approved by :

K.HASE A.KINOSHITA Y.SUGIMORI

Employer's Drawing Number : Rev.

MAT-STIC-C0-G-A-00022 0
P Contractor's Drawing Number : Rev. P
1GMH01891 1/1 4
MARK APPROVED BY CHECKED BY TITLE
DATE
APPROVED BY SCALE
CHECKED BY DESIGNED BY DRAWN BY
REVISED BY UNITS

REVISIONS
DRAWING NO. REV.MARK
CONTENTS
Q
Q
REGISTERED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 REGISTERED
PRESENT TO
22
23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
10 11 12b
0GMH00442

SEAWALL
W 21 A
DRAWING NO. A
L
2U2V 2W

T1
2U2V 2W

T2
DUCT BANK

DUCT BANK

DUCT BANK
PIPE TRENCH

FL-3000
GW

S N
CVT

LT LA

CVT

LT LA

CVT

LT LA

GW

CVT

LT LA

CVT

LT LA

CVT

LT LA

DUCT BANK

GW

DUCT BANK

DUCT BANK
PIPE TRENCH

FL-3000
A

1:3
1 :3
F ac e o f Se awa l
THIS DRAWING
E

B
KEY PLAN
K
REV.MARK

C C
J
C

UNIT#1 BOILER

UNIT#2 BOILER
H
D D

UNIT#1 COND.

UNIT#2 COND.
A

A G'
G
11 10
22 7 7
E E

11
10
F 7 10 7
14 14
9 9
21 21
F E 4 F

18
D

C'

12 12
5 5
G C G
6 6

B'

B 5 5

B 17 17 B
H 14 14 H
13 13
11
A
Y
X=1096.010
16 16
Y= 401.450 C
X

I I

19

18 X X X X X X X X
X X X X X X X X X X X X X X
X X X X X X X X
X X X X X X X X X X X X X X

J J

20 20

19
X

X
X

X
X
X

X
X
X

X
X
X

X
X
X

X
X
X

X
X

X
X
K
X

X
K
X

X
X
X

X
X

X
X
X

X
X

X
X
X

X
X

X
X
X

X
X

X
X
X

X
X

X
X
X

X
X

X
X
X

X
X

X
X
X

X
X

X
X

X
19 19
X

X
X

X
X X X X X X X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
L L

X
X

X
X

X
X

X
X
X

X
X

X
X
X
X

X
X

X
X
X
X

X
X

X
X
X
X

X
X

X
X
X
X

X
X

X
X
X
X

X
X

X
X
X
X

X
X

X
X
X
X

X
X

X
X
X
M M
X

X
X

X
X
X
X

X
X

X
X
X
X

X
X

X
X
X
X

X
X

X
X
X
X

X
X

X
X
X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Revision History

N Rev. Date Description Prepared by Checked by Approved by


N
- 11-3-2019 First Issue for Approval K Hase Y Ishikawa Y Sugimori
Revised for approval; as per Engineering progress, Owner Y.Sumi/
A 01-8-2019 Y.Sugimori T.Shintani
comments K.Hase
S.Takamizawa /
UNIT 1 UNIT 2 0 09-4-2020 Revised for approval; as per Engineering progress
K.Hase
T.Shintani T.Shintani

6' 2 18'
Employer : Engineer :

Coal Power Generation


Matarbari Joint Venture
Company Bangladesh MATARBARI JVC
Consultant
Limited

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
23
Contractor :
The Consortium of Sumitomo Corporation, Toshiba Energy Systems
GROUND FLOOR (FL+0) & Solutions Corporation and IHI Corporation

O O

FOR APPROVAL
Project :

Matarbari Ultra Super Critical Coal-Fired Power Project


Contract Number :
CPGCBL/MAT/PKG1.2/2017/1338
Drawing Title :

General Arrangement of Power House


Date : 11/3/2019 Scale : 1:250 Ori. Size : A0 Status : For Approval
Responsible Dept. : Prepared by : Checked by : Approved by :

K.HASE Y.ISHIKAWA Y.SUGIMORI

Employer's Drawing Number : Rev.

MAT-STIT-00-T- -10421 0
P Contractor's Drawing Number : Rev. P
0GMH00442 2/6 5
MARK APPROVED BY CHECKED BY TITLE
DATE
APPROVED BY SCALE
CHECKED BY DESIGNED BY DRAWN BY
REVISED BY UNITS

REVISIONS
DRAWING NO. REV.MARK
CONTENTS
Q
Q
REGISTERED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 REGISTERED
PRESENT TO
22
23 24
Date:09/07/2020

You might also like