Production Process Flow Chart

The document provides a process flow chart for preparing electrical breast pump components and assembling the final product. It outlines 21 steps for PCB preparation, 14 steps for component preparation, 23 steps for pump unit preparation, and 12 steps for device packaging. Each step lists required fixtures, tools, and any special notes. The process is reviewed and approved to maintain quality control.

Uploaded by

Kenny Rojas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
270 views5 pages

Production Process Flow Chart

The document provides a process flow chart for preparing electrical breast pump components and assembling the final product. It outlines 21 steps for PCB preparation, 14 steps for component preparation, 23 steps for pump unit preparation, and 12 steps for device packaging. Each step lists required fixtures, tools, and any special notes. The process is reviewed and approved to maintain quality control.

Uploaded by

Kenny Rojas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Process Flow Chart File No.

: HNR-CE-01-06
Prodcut Name: Electrical Breast Pump (PCB preparation)
Version: A
Model: XN-2212M2, XN-2219M1, XN-2219M2, XN-2223M1, XN-
Revision Date: 2017.07.07
2223M2, XN-2233M1, XN-2233M2

Begin
Required fixtures and tools

Burn the program software 01 Wrist strap, programmer

Weld terminal/buzzer 02 Thermostat soldering iron, Wrist strap

Weld and assmble touch spring 03 Thermostat soldering iron, Wrist strap

Weld and assemble backlight,


assemble display screen 04 Thermostat soldering iron, Wrist strap

Weld display screen 05 Thermostat soldering iron, Wrist strap

Cutting pins 06 Wrist strap, Stock box, Side cutting pliers, Tweezers

Assemble shading EVA 07 Thermostat soldering iron, Wrist strap

2212 PCB test jig, Wrist strap, Maeker pen, LQC full-inspection
Function test 08 form

Weld DC socket 09 Thermostat soldering iron, Wrist strap

Weld slide swtich 10 Thermostat soldering iron, Wrist strap

Adapter aging frame, Maker pen, Record, Scotch tape, Adapter test
Power adapter aging test, packaging
11 frame, tape machine, LQC full-inspection form

END

Common process Criical process Special process Inspection position

Compiled by: Reviewed by: Approved by:

1/5 HNR-CE-01-06
Guangdong Horigen Mother & Baby Products Co., Ltd.
Process Flow Chart File No.: HNR-CE-01-06
Prodcut Name: Electrical Breast Pump (Components preparation) Version: A
Model: XN-2212M2, XN-2219M1, XN-2219M2, XN-2223M1, XN- Revision Date: 2017.07.07
2223M2, XN-2233M1, XN-2233M2
Begin
Required fixtures and tools

Instruction for use preparation 01 QC seal, Date seal, Ink

Terrzers, cleaning cloth, medinical alcohol


Valve block packaging 02

Assemble milk bottle components 03 PE glove, medinical alcohol, swab

Assemble straight joint 04

Small scotch tape, small tape machine, 75*25 white scrip, medinical
Tubing, tubing package 05 alcohol, cleaning cloth

Diaphragm preapration 06 Diaphragm machine

Assemble the Diaphragm and cap into breast


shield body 07 Knife, PE glove, medinical alcohol, swab

Assemble the silicone breast shield body 08 PE glove, medinical alcohol, swab

Test and assemble the dust cover 09 Suction test instrument

Put the breast shield body into milk


bottle, packaging 10

Assemble the bottle stand, sealing film bag 11

Inner white box preparation 12

Check the component and put them into


white box 13

Packaging 14

END
Common process Criical process Special process Inspection position

Compiled by: Reviewed by: Approved by:

2/5 HNR-CE-01-06
Guangdong Horigen Mother & Baby Products Co., Ltd.
Process Flow Chart File No.: HNR-CE-01-06

Prodcut Name: Electrical Breast Pump (Pump unit preparation) Version: A


Model: XN-2212M2, XN-2219M1, XN-2219M2, XN-2223M1, XN- Revision Date: 2017.07.07
2223M2, XN-2233M1, XN-2233M2

Begin
Required fixtures and tools

Unit panel preparation 01 Small blade, cleaning cloth, pneumatic reunner

Silk-screen of unit shell 02 Printing machine and ink

Assemble air pump shock-proof EVA 03

Vaccum pump bonding solder wire 04 Thermostat soldering iron, Wrist strap

Cutting internal tubing 05 Knife,lenfth control panel

Pump tubing preperation 06 Auxiliary plate

Inter-machine device preparation 07

Inter-machine device assemble shock-


proof cushion 08 Glove

Connect the inter-machine hose and


assemble the shock-proof cushion 09

Assemble slide swtich 10 Electric screw driver

Assemble DC socket 11 Electric screw driver

Fix the inter-machine 12 Electric screw driver

Tidy up the aire pump hose/Assemble


shock-proof cushion 13

Assemble tubing pad 14 Electric screw driver

Assemble battery
/Assemble electrode slice
15

3/5 HNR-CE-01-06
Fix the PCB board 16 Electric screw driver, Wrist strap

PCB board connecting 17 Wrist strap

Close the device shell 18 Wrist strap, cutting nippers

Assemble device panel 19 Knife, cleaning cloth, air gun

Function test 20 Functional test device

Screw tightening the device shell 21 Electric screw driver

Aging test report, marking pen, timer, device aging test instrument,
Pump unit aging test 22 tape

Functional test after aging test 23 Test instrument

END

Common process Criical process Special process Inspection position

Compiled by: Reviewed by: Approved by:

4/5 HNR-CE-01-06
Guangdong Horigen Mother & Baby Products Co., Ltd.
Process Flow Chart File No.: HNR-CE-01-06
Prodcut Name: Electrical Breast Pump (Device packaging) Version: A
Model: XN-2212M2, XN-2219M1, XN-2219M2, XN-2223M1, XN-
Revision Date: 2017.07.07
2223M2, XN-2233M1, XN-2233M2

Begin
Required fixtures and tools

Calor box preparation 01

Put in adapter 02 Glove, cleaning cloth, cleaner, air gun

Laser spray code machine, protective goggles, laser work clothes,


Laser engraving device information 03 cleaning cloth, cleaner, medicinal alcohol

Unit cleaning 04 cleaning cloth, cleaner, medicinal alcohol, swab

Assemble device foot pad 05 Flat plate, cleaning cloth, cleaner, medicinal alcohol

Put in spare adapter components 06 cleaning cloth, cleaner, medicinal alcohol, swab

Put in nipple tubing component(s) 07 cleaning cloth, cleaner, medicinal alcohol, swab

Stick protective film and label(s) 08 Glove, knife

Check and put the product in calor box 09 Glove

Put the other components in calor box


and seal calor box
10 Glove, small tape machine

The calor box is packed in outer box 11 Barcode scanner, printing ink

Sealing the outer box 12 packer, tape machine, date stamp

END

Common process Criical process Special process Inspection position

Compiled by: Reviewed by: Approved by:

5/5 HNR-CE-01-06

You might also like