Material Master at What Level: Direct Procurement Refers To Obtaining
Material Master at What Level: Direct Procurement Refers To Obtaining
Vendor Block
filed selection
internal/external procurement
user department
material length is 18
filed selection
1 time vendor
1 time vendor
vendor subrange
partner function
The procurement type is preset by the material type in Customizing for the material master. If necessary, you have defined more precisely how the in-house
Direct procurement refers to obtaining
anything that’s required to produce an end-
product. For a manufacturing company, this
includes raw materials and components. For
a retailer, it includes any items purchased
from a wholesaler for resale to customers.
purpose of PIR
it contains material and vendor supplying th
standar
sub contracting
pipeline
consignment
Source list
Source list specifies the time period of ordering a particular material from a given vendor.
to fix vendor
quota arrangement
The MRP indicator in the source list stipulates how the source defined in a source list record is taken into account in materials planning. If a source
Fix: This indicator is to be set if the vendor is the preferred source of supply for the material and plant combination. Blk: If a particular vendor is to b
no new item category can be created, even SAP recommened not create/change existing item category
Batch management
material created in batch with certain characteristic
CT04
MSC1N
C07
SUGGG
A1
A2
A3
MATNR
C01
c02
C03
C04
C05
C06
C07
FS
change request
which area ur strong
procurement & invoice verification
Purchase requisite
special procurement type
transfer posting
ME2o
BOM
BSv
FRL+
GBB
WDO
scrap
scheduling
can we maintain pricing at header level
how can we detarmine fright charge from materail master
source list
pricing procedue
quota
pIR
purchase order
Document type
Internal
Purchase Requistion
sinificance of PR
no. range & no. assignment
filed selection
item interval
allowed item interval
release procedure
MM - FI integration
material length is 40 in S/4 Hana
material master is created at all level , statring with client, company code, plant & storage location
XK07
SPRO
SPRO
aterial type in Customizing for the material master. If necessary, you have defined more precisely how the in-house production or external procurement is to be carried out,
Se16n
material type, UOM, materail group
plant,
description, language
Me11
Me12
Me13
ME01
ordering a particular material from a given vendor.
plant and material level
MEQ1
ulates how the source defined in a source list record is taken into account in materials planning. If a source list requirement exists, a material may not be procured
dor is the preferred source of supply for the material and plant combination. Blk: If a particular vendor is to be blocked from supplying the material for a specified tim
ertain characteristic
create character
create batch
MFRNR
V0001
V0001
V0001
V0001
V0001
V0001
V0001
functional specification
CR
BSX+
GBB-
External
Purchase order
Scheduling Agreement
Contract
Request for Quotation
can be done at client & Plant levl
XK06 can be done at client & Plant levl
financial document new acount receivable and payabel vendor account master data
LG BP Vendor control
ernal procurement is to be carried out, in the material master ( MRP 2 view), in the Special procurement field.
create
exit
display
xists, a material may not be procured from sources other than those included in the source list.
pplying the material for a specified time, then this indicator is to be set.
che999
industory sector
material type
ZZ