A Report On: Sub-Soil Investigation For The Proposed Construction of Minor Bridge Over Chora Nala at Ch. KM 4.000
A Report On: Sub-Soil Investigation For The Proposed Construction of Minor Bridge Over Chora Nala at Ch. KM 4.000
A Report On: Sub-Soil Investigation For The Proposed Construction of Minor Bridge Over Chora Nala at Ch. KM 4.000
RTL&C/SSI/2020/2184_2
A
REPORT ON
SUB-SOIL INVESTIGATION
FOR THE PROPOSED CONSTRUCTION OF
MINOR BRIDGE OVER CHORA NALA AT CH. KM 4.000
IN JOLAIBARI - BELONIA (FROM KM 0.000 TO KM 21.412)
SECTION OF NH-108A IN THE STATE OF TRIPURA
Submitted to:
M/S. SATISH PRASAD
RANCHI
Executed By:
F Introduction………………………………………………………
1
F Project details…………………………………….. 2
F Laboratory Testings……………………………….. 4
CHAPTER - I
1 INTRODUCTION:
1.1 In an attempt to facilitate the design of the proposed new
construction of the foundation structure of the :
MINOR BRIDGE OVER CHORA NALA AT CH. KM 4.000 IN JOLAIBARI -
BELONIA (FROM KM 0.000 TO KM 21.412) SECTION OF NH-108A IN
THE STATE OF TRIPURA
A subsoil investigation work was programmed by the authority and
for this work, the services of M/s. Ramkrishna Testing Laboratory &
1.2 The scope of the soil investigation consisted of making three nos. of
bore holes at this site.
1.3 The formation at the site is to be reported for various layers presented
at their respective depth along with their thickness. This would also
CHAPTER - II
2 PROJECT DETAILS
2.1 The fieldwork consisted of three nos. of bore hole at pre-determined
location. The detail of fieldwork like depth of bore hole, date of the
1997). The bore holes of 150mm diameter (SX size) are initially sunk
by hand auger boring upto the water table and thereafter by rotary
boring. Undisturbed soil samples were collected (as per IS: 2132 -
1986, reaffirmed - 1997) from the bore holes and both end of the
intervals as per IS:2131 in each bore hole using a split spoon sampler.
The split spoon sampler used for this test advanced by driving with a
monkey weighing 63.5 kg, falling freely through 750mm. The soil
2.3 Ground water level in the bore holes within the explored depth below
the existing ground level was observed during boring work and also
after 24 hours of the completion of the field work. Also the water
CHAPTER - III
3 LABORATORY TESTING:
5 Specific Gravity.
CHAPTER - IV
4 FOUNDATION DESIGN ASPECTS
A suitable foundation for any structure should have an adequate
requirment.
BEARING CAPACITY OF SHALLOW FOUNDATION
(IS : 6403-1981, reaffirmed - 1997)
accordance with IS: 6403-1981. The following equation has been used
All the Bearing capacity factors, Shape factors and depth factors has
5.1.2.2 respectively.
Si = (pB(1- ì2)I)/E
Where ì= Piosson’s ratio = 0.5 for cohesive, 0.3 for cohesionless soil.
I = Influence factor
Cc = Co-efficient of consolidation
df = depth factor
dr = Rigidity factor
CHAPTER - V
5 SOIL PROFILE & RECOMMENDATION
From the exploratory bore holes at the site it is observed that sub soil
layer and the stiffness of the soil has been increases with the
increases in depth. Details of the formations along with the “N” values
Since the structure consists of a single span bridge and the scour
of compacted layer of sand around 1.5m thick below the founding level
the depth of 9.5m with the compacted sand, and accordingly SBC has
(A Maiti)
(ME, Soil Mech. Fdn. Engg.)
(Chartered Engineer)
foundation
foundation
Size of
Shape of
Depth of
3.00 4.00 3.50 0.50 1.150 1.150 0.700 1.404 1.202 1.202 -- -- -- 43.02 15.00 20.60
3.00 5.00 3.50 0.50 1.120 1.120 0.760 1.404 1.202 1.202 -- -- -- 43.13 14.97 20.61
4.00 5.00 3.50 0.50 1.160 1.160 0.680 1.303 1.152 1.152 -- -- -- 44.59 15.39 21.23
4.00 6.00 3.50 0.50 1.133 1.133 0.733 1.303 1.152 1.152 -- -- -- 44.96 15.45 21.35
3.00 4.00 4.00 0.50 1.150 1.150 0.700 1.462 1.231 1.231 -- -- -- 48.73 17.08 23.41
3.00 5.00 4.00 0.50 1.120 1.120 0.760 1.462 1.231 1.231 -- -- -- 48.72 17.00 23.35
4.00 5.00 4.00 0.50 1.160 1.160 0.680 1.346 1.173 1.173 -- -- -- 49.93 17.33 23.85
4.00 6.00 4.00 0.50 1.133 1.133 0.733 1.346 1.173 1.173 -- -- -- 50.20 17.35 23.92
DETERMINATION OF SETTLEMENTS
Total settlement S = Si + Sc
Where Si = Immediate settlement
Sc = Consolidation Settlement
As per IS:8009 Part 1-1976 Cl. 9.2.3.2 Equation (11)
2
Si = (qB (1-m ) x I )/E x df x dr
Where m = poisson ratio = 0.5 for clay q = Applied bearing pressure
I = Influence factor(depands upon length (L ) to breadth (B ) ratio of the footings)
foundation
applied
pressure
Size of
Depth of
(m)
Influence factor
Poisson ratio
Modulas of
Settlement in
Elasticity
mm
df dr
B L m E
3.00 4.00 3.00 17.91 0.30 8750 1.00 0.78 0.95 4.14
3.00 5.00 3.00 17.97 0.30 8750 1.00 0.78 0.95 4.15
4.00 5.00 3.00 18.70 0.30 8750 1.00 0.78 0.95 5.76
4.00 6.00 3.00 18.86 0.30 8750 1.00 0.78 0.95 5.81
3.00 4.00 3.50 20.60 0.30 8750 1.00 0.78 0.95 4.76
3.00 5.00 3.50 20.61 0.30 8750 1.00 0.78 0.95 4.76
4.00 5.00 3.50 21.23 0.30 8750 1.00 0.78 0.95 6.55
4.00 6.00 3.50 21.35 0.30 8750 1.00 0.78 0.95 6.58
3.00 4.00 4.00 23.41 0.30 8750 1.00 0.78 0.95 5.41
3.00 5.00 4.00 23.35 0.30 8750 1.00 0.78 0.95 5.40
4.00 5.00 4.00 23.85 0.30 8750 1.00 0.78 0.95 7.35
4.00 6.00 4.00 23.92 0.30 8750 1.00 0.78 0.95 7.37
DETERMINATION OF SETTLEMENTS
Consolidation Settlement
compressible
Depth of
foundation (m)
Thickness of the
layer
pr. t/m2
Size of
foundation
Initial overburdan
Pressure increment
Settlement in mm
Cc/(1+e0)
Oedometer
correction
t/m2
df dr
B L
3.00 4.00 3.00 17.91 4.50 11.700 5.848 0.70 0.12 0.78 0.95 49.31
3.00 5.00 3.00 17.97 4.50 13.163 5.867 0.70 0.12 0.78 0.95 44.84
4.00 5.00 3.00 18.70 6.00 13.163 6.105 0.70 0.12 0.78 0.95 61.80
4.00 6.00 3.00 18.86 6.00 14.625 6.159 0.70 0.12 0.78 0.95 57.00
3.00 4.00 3.50 20.60 4.50 12.675 6.728 0.70 0.12 0.78 0.95 51.79
3.00 5.00 3.50 20.61 4.50 14.138 6.728 0.70 0.12 0.78 0.95 47.35
4.00 5.00 3.50 21.23 6.00 14.138 6.933 0.70 0.12 0.78 0.95 64.72
4.00 6.00 3.50 21.35 6.00 15.600 6.972 0.70 0.12 0.78 0.95 59.92
3.00 4.00 4.00 23.41 4.50 13.650 7.643 0.70 0.12 0.78 0.95 54.09
3.00 5.00 4.00 23.35 4.50 15.113 7.624 0.70 0.12 0.78 0.95 49.68
4.00 5.00 4.00 23.85 6.00 15.113 7.788 0.70 0.12 0.78 0.95 67.42
4.00 6.00 4.00 23.92 6.00 16.575 7.811 0.70 0.12 0.78 0.95 62.63
0.50 - - - - - DS
Brownish grey clayey silt
1.50 1.95 2 2 2 4 SPT/DS
2.50m
3.00 3.45 2 2 3 5 SPT/DS
Greyish with blueish patches silty clay 21.00 21.45 17 70 80 150 SPT/DS
sample (in m)
Depth of the
density(gm/cc)
Test Particle Size Distribution Atterberg Limit NMC Shear Strength Consolidation
Bulk Density
Dry Density
No (%) (%) Parameter
Cohesion Charecteristic
Submersed
Void ratio
(in %) C
(gm/cc)
(gm/cc)
F
Specific
Gravity
Cc Cc/(1+e0)
Gravel
LL PL PI Kg/cm2 (degree)
Sand
Clay
Silt
UDS 2.50
0.00 6.81 56.47 36.72 34.50 17.00 17.50 21.54 1.844 1.517 0.844 2.48 0.63 0.38 0 0.222 0.1358
UDS 4.00
0.00 7.47 57.51 35.02 36.00 19.55 16.45 23.44 1.863 1.509 0.863 2.45 0.62 0.42 0 0.217 0.1337
UDS 7.00
0.00 6.67 57.83 35.50 37.00 17.68 19.32 22.55 1.899 1.550 0.899 2.42 0.56 0.53 0 - -
BH - 1
SPT 13.50
0.54 7.63 56.61 35.22 36.50 17.62 18.88 - - - - 2.44 - - - - -
SPT 19.50
0.00 6.99 57.90 35.11 36.50 18.76 17.74 - - - - 2.59 - - - - -
28.50
12
SPT
0.00 7.13 57.11 35.76 36.00 16.43 19.57 - - - - 2.51 - - - - -
UDS 4.00
0.00 7.94 55.44 36.62 36.50 19.07 17.43 21.56 1.897 1.561 0.897 2.46 0.58 0.46 0 0.215 0.1364
SPT 7.50
0.00 6.79 56.79 36.42 37.00 18.66 18.34 - - - - 2.53 - - - - -
SPT 12.00
Minor Bridge over Chora Nala
sample (in m)
Depth of the
density(gm/cc)
Test Particle Size Distribution Atterberg Limit NMC Shear Strength Consolidation
Bulk Density
Dry Density
No (%) (%) Parameter
Cohesion Charecteristic
Submersed
Void ratio
(in %) C
(gm/cc)
(gm/cc)
F
Specific
Gravity
Cc Cc/(1+e0)
Gravel
LL PL PI Kg/cm2 (degree)
Sand
Clay
Silt
UDS 2.50
0.00 6.81 57.63 35.56 34.50 14.61 19.89 23.14 1.840 1.494 0.840 2.45 0.64 0.31 0 0.223 0.1360
UDS 4.00
0.41 7.90 55.51 36.18 36.00 19.19 16.81 25.67 1.863 1.482 0.863 2.54 0.71 0.33 0 0.217 0.1267
UDS 7.00
0.67 6.87 56.86 35.60 37.00 17.50 19.50 23.17 1.880 1.526 0.880 2.42 0.59 0.37 0 - -
BH - 3
SPT 12.00
0.00 6.60 57.25 36.15 35.00 16.14 18.86 - - - - 2.53 - - - - -
SPT 18.00
0.00 6.99 57.15 35.86 36.50 19.53 16.97 - - - - 2.41 - - - - -
25.00
12
SPT
0.00 6.89 57.87 35.24 35.00 17.81 17.19 - - - - 2.57 - - - - -
Minor Bridge over Chora Nala
at CH. KM 4.000
* Suggested Value
Job No. RTL&C/SSI/2020/2184_2
100
120
140
160
180
20
40
60
80
-1.500m 4 4 6.72 ###
0
-3.000m 5 5 7.25 ### 0.00m
-4.500m 11 11 ### ###
-2.00m
-6.000m 13 13 ### ###
-7.500m 18 18 ### ###
-4.00m
-9.000m 23 23 ### ###
-10.500m 30 30 ### ### -6.00m
-12.000m 48 48 ### ###
-13.500m 59 59 ### ### -8.00m
-15.000m 70 70 ### ###
-16.500m 57 57 ### ### -10.00m
-18.000m 60 60 ### ###
-19.500m 76 76 ### ### -12.00m
-21.000m 95 95 ### ###
-22.500m 112 112 ### ### -14.00m
145 145 ### ###
DEPTH
-24.000m
135 -16.00m
-25.500m 135 ### ###
-27.000m 120 120 ### ###
-18.00m
-28.500m 147 147 ### ###
-30.000m 160 160 ### ###
-20.00m
0.00 7.50
0.00 7.50 -22.00m
0.00 7.50
0.00 7.50 -24.00m
0.00 7.50
0.00 7.50 -26.00m
0.00 7.50
0.00 7.50 -28.00m
0.00 7.50
0.00 7.50 -30.00m
0.00 7.50
-32.00m
0.00 7.50
0.00 7.50 FIELD AND CORRECTED N VALUE
Series1 Series2
100
120
140
160
180
20
40
60
80
-1.500m 8 13 ### ###
0
-3.000m 13 17 ### ### 0.00m
-4.500m 20 21 ### ###
-6.000m 26 23 ### ### -2.00m
-7.500m 48 48 ### ###
-9.000m 63 42 ### ### -4.00m
-10.500m 73 45 ### ###
-12.000m 82 49 ### ###
-6.00m
-13.500m 43 43 ### ###
-15.000m 63 63 ### ###
-16.500m 75 75 ### ### -8.00m
-18.000m 90 90 ### ###
-19.500m 104 104 ### ### -10.00m
-21.000m 110 110 ### ###
-22.500m 117 117 ### ###
-12.00m
125 125 ### ###
DEPTH
-24.000m
-25.000m 133 133 ### ###
0.00 7.50 -14.00m
0.00 7.50
0.00 7.50 -16.00m
0.00 7.50
0.00 7.50
-18.00m
0.00 7.50
0.00 7.50
0.00 7.50 -20.00m
0.00 7.50
0.00 7.50 -22.00m
0.00 7.50
0.00 7.50 -24.00m
0.00 7.50
0.00 7.50
-26.00m
0.00 7.50
0.00 7.50 FIELD AND CORRECTED N VALUE
Series1 Series2
100
120
140
160
180
20
40
60
80
-1.500m 4 4 6.72 ###
0
-3.000m 5 5 7.25 ### 0.00m
-4.500m 6 6 7.92 ###
-6.000m 7 7 8.54 ### -2.00m
-7.500m 8 8 9.20 ###
-9.000m 3 3 3.27 9.14 -4.00m
-10.500m 17 17 ### ###
-12.000m 24 24 ### ###
-6.00m
-13.500m 40 40 ### ###
-15.000m 49 49 ### ###
-16.500m 61 61 ### ### -8.00m
-18.000m 77 77 ### ###
-19.500m 111 111 ### ### -10.00m
-21.000m 150 150 ### ###
-22.500m 140 140 ### ###
-12.00m
153 153 ### ###
DEPTH
-24.000m
-25.000m 159 159 ### ###
0.00 7.50 -14.00m
0.00 7.50
0.00 7.50 -16.00m
0.00 7.50
0.00 7.50
-18.00m
0.00 7.50
0.00 7.50
0.00 7.50 -20.00m
0.00 7.50
0.00 7.50 -22.00m
0.00 7.50
0.00 7.50 -24.00m
0.00 7.50
0.00 7.50
-26.00m
0.00 7.50
0.00 7.50 FIELD AND CORRECTED N VALUE
Series1 Series2
100.00
90.00
80.00
70.00
Percentage finer
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0.002
0.075
0.425
4.75
0.00100 0.01000 0.10000 1.00000 10.00000 100.00000
Grain size2.50m
(mm) 4.00m
100.00
90.00
80.00
70.00
Percentage finer
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0.002
0.075
0.425
4.75
100.00
90.00
80.00
70.00
Percentage finer
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0.002
0.075
0.425
4.75
0.00100 0.01000 0.10000 1.00000 10.00000 100.00000
100.00
90.00
80.00
70.00
Percentage finer
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0.002
0.075
0.425
4.75
4.00m 7.50m
Grain size (mm)
100.00
90.00
80.00
70.00
Percentage finer
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0.002
0.075
0.425
4.75
0.00100 0.01000 0.10000 1.00000 10.00000 100.00000
100.00
90.00
80.00
70.00
Percentage finer
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0.002
0.075
0.425
4.75
100.00
90.00
80.00
70.00
Percentage finer
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0.002
0.075
0.425
4.75
0.00100 0.01000 0.10000 1.00000 10.00000 100.00000
Grain size2.50m
(mm) 4.00m
100.00
90.00
80.00
70.00
Percentage finer
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0.002
0.075
0.425
4.75
100.00
90.00
80.00
70.00
Percentage finer
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0.002
0.075
0.425
4.75
0.00100 0.01000 0.10000 1.00000 10.00000 100.00000
100.00
90.00
80.00
70.00
Percentage finer
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0.002
0.075
0.425
4.75
1.50 1.50
1.00 1.00
0.50 0.50
0.50 1.00 1.50 2.00 2.50 3.00 3.50 0.50 1.00 1.50 2.00 2.50 3.00 3.50
Normal Stress (Kg/cm2)
21
BH - 1 BH - 2
Shear Stress (kg/cm2)
1.00 1.00
0.50 0.50
Minor Bridge over Chora Nala
1.50 1.50
1.00 1.00
0.50 0.50
0.50 1.00 1.50 2.00 2.50 3.00 3.50 0.50 1.00 1.50 2.00 2.50 3.00 3.50
Normal Stress (Kg/cm2)
22
BH - 3
Shear Stress (kg/cm2)
DEPTH = 7.00 m
C= 0.55 Kg/cm2 & f = 10
1.50
1.00
0.50
Minor Bridge over Chora Nala