Inspection Request for the installation of Openings on slaps and Sleeves in Drop Beams on First Floor Level for mechanical
services as per attached drawing.
INSPECTION COMMENT
Position Comments Signature Date & Time
Architectural
MEP
Others (Specify)
CONFIRMATION OF CONTRACTOR'S QA/QC INSPECTION SECTION B
Confirmation of coordination and compliance with the specifications, approved drawings, Method Statement, and Quality Control Plan
If No, any departure from the specification, approved drawings, Method of Statement and Quality Control Plan
Yes No Note:
to be recorded below
Non conformity and/or reference to the attached Non Conformity Report (NCR) NCR No. Date:
Signed by Contractors QA/QC Manager: Date:
ENGINEERS INSPECTION COMMENTS: SECTION C
POSITION Comments Signature Date & Time
Architectural
MEP
Others (Specify)
Section A to be completed by MEP Contractor and delivered to CRANEBURG by at least 24 hrs. before planned time of inspection.
Section B to be completed by CRANEBURG prior to inspection.
Section C to be completed by MEP CONSULTANT and delivered to Contractor.
Section D to be completed by Client representative the original copy.
Checking technical compliance by the Consultant shall not relieve the Contractor from his obligation to perform the work in accordance with the
Contract Documents, Requirements of Safety, and Local Authorities regulations.