KP 1508

The document provides details of work items, start and end dates, payment amounts and statuses for renovations at a client's flat. There are 12 work items listed with descriptions, timing, payment due dates if applicable and current status like completed, in progress or yet to start.

Uploaded by

k.shiva teja
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views2 pages

KP 1508

The document provides details of work items, start and end dates, payment amounts and statuses for renovations at a client's flat. There are 12 work items listed with descriptions, timing, payment due dates if applicable and current status like completed, in progress or yet to start.

Uploaded by

k.shiva teja
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Client Name Mrs.

Puspha Flat No : Kalpataru 1508

S.NO ITEM DESCRIPTION Start Date End date Payment Payment due date Status /Remarks

False Ceiling + Wiring provision +


1 AC Copper wiring 20.06.2021 30.06.2021 Completed
In progress ,Items
1100000 NA Included phase -1
2 Wood work phase 1 01.07.2021 30.08.2021 are Boxes and wood

Civil Works + Ceiling Luppam +


3 Remaining Areas POP 01.07.2021 25.08.2021 In progress

Yet to start ,Items


Included phase -2
are doors with
Wood work phase 2 + Along with Due as on Laminates /MDF at
4 Accessories 01.09.2021 15.09.2021 500000 30.08.2021 Duco areas
Nano white platform, HD Tile
5 works , Stone Works etc 08.09.2021 11.09.2021
Electrical Works along with light
6 fixtures as per 3D 08.09.2021 13.09.2021
Due as on
7 Cnc + Aryrlic works 12.09.2021 15.09.2021 300000 07.09.2021 Yet to start .

8 Duco + Veneer Polish finish 15.09.2021 05.10.2021


Plumbing water fountain etc As
9 per Quotation 16.09.2021 18.09.2021
Wooden flooring ,Glass work
,Shower glass & mirrors as per Due as on
10 Quotation 18.09.2021 21.09.2021 175000 14.09.2021 Yet to start .
Wall paper ,wall theme and Grass
11 carpet ,Curtain Rods /Towel rods 02.10.2021 04.10.2021
Due as on
12 Painting 22.09.2021 05.10.2021 125000 21.09.2021 Yet to start .

05th October
Delivery Date 2200000 Project cost tentative
2021