Site Engineers:
Site engineers are responsible for all aspects of health and safety on site and are accountable to the Unit
head / Regional manager. Their roles include:
Report any issue affecting health and safety issues at the work sites to the regional manager / unit
head / safety team
Coordinate with end customer / client for the taking work permit and returning work permit
Communicating the work content / hazard involved to working group through the medium of
Toolbox meeting before commencement of work every day
Initiating proactive measures to minimize / eliminate accidents
Reporting in detail in the event of incident
Ensure effective use of appropriate PPE
Ensure the quality of job at all times without any compromise on safety
“Stop Work” in the event of any serious safety violation
Prepared by Approved by
Doc No: VEPL /OHSAS/D11 Rev.No:00 Page 1 of 7
VOLTECH ENGINEERS PRIVATE LIMITED.
OPERATIONAL CONTROL PROCEDURE
OCP NO: 04
Safety Manger / Regional Safety Engineers:
Safety manger / Regional safety engineers are responsible for providing health and safety advice and
guidance to their Unit head/ Regional manager, site engineers and their roles include:
Ensuring implementation of all instruction and procedures based on the occupational health and
safety
Communicating all safety rules, regulations and practices to all site engineers / regional manager/
unit head
Follow up for the closure of audit non conformances and help regional mangers / unit head to take
corrective action and preventive action
Report and investigate all the incidents / Near misses to the top management
Create awareness amongst site engineers / regional managers and also organize the regular training
program.
Ensure that Tool box talk meetings are in being conducted daily at site and the workers are aware of
all the hazards at the work site
Ensure adequate PPE’s and safety equipment as are required are available at sites and are being
used at site appropriately
Reporting of any issues affecting the health and safety at the work site to the unit head / Regional
managers
Ensure basic first aid facilities are available at sites
Ensure that no unsafe act is performed at any site
Ensuring that any unsafe condition observed at site is eradicated at the earliest
Issuing of safety challans in the event of any safety violations.
4.0 Working Activity and descriptions
4.1 Pre-Testing Checks
Check out the working condition of ELCB(30 mA)
Check the insulation of power cable for equipment
Ensure proper earthing and rubber mats available at the work location.
Calibrated Testing equipment should be used and calibration reports available with engineers for
the same
Check out the insulates hand tools available with the technician
Ensure the Healthiness of the test leads (Check for any insulation Damages)
Ensure appropriate PPE’s available at sites
4.2 Resources – Tools and Equipment Required
For Insulation Resistance measurement Test (IR Test):
a. 500 V, 5000 V Insulation Tester
b. Test Leads
c. Insulated Hand Tools
Prepared by Approved by
Doc No: VEPL /OHSAS/D11 Rev.No:00 Page 2 of 7
VOLTECH ENGINEERS PRIVATE LIMITED.
OPERATIONAL CONTROL PROCEDURE
OCP NO: 04
a. Contact Resistance meter kit with test leads range of 200µΩ-2000µΩ
MEGGER
MEGGER
Prepared by Approved by
Doc No: VEPL /OHSAS/D11 Rev.No:00 Page 3 of 7
VOLTECH ENGINEERS PRIVATE LIMITED.
OPERATIONAL CONTROL PROCEDURE
OCP NO: 04
Motor Winding IR test (using 500V Meggar)
Connect the Megger across the motor Terminal “U1 & V1”
Switch ON the megger and press the test button take down the readings
Discharge the potential from the “U1 & V1” terminal with respect to earth
Switch OFF the megger
Repeat the above steps for other Terminals (V1 & W1), (W1 & U1)
Prepared by Approved by
Doc No: VEPL /OHSAS/D11 Rev.No:00 Page 4 of 7
VOLTECH ENGINEERS PRIVATE LIMITED.
OPERATIONAL CONTROL PROCEDURE
OCP NO: 04
Contact Resistance Measurement Test
C+ V+ V- C-
CRM KIT
Prepared by Approved by
Doc No: VEPL /OHSAS/D11 Rev.No:00 Page 5 of 7
VOLTECH ENGINEERS PRIVATE LIMITED.
OPERATIONAL CONTROL PROCEDURE
OCP NO: 04
OCP for IR and CRM for Isolators is available with testing engineers
Ensure PTW system in place for the particular bay
Ensure all supply to the equipment is dead
Unauthorized persons should not be allowed to enter Testing area
Barricade the testing area with warning tape
More than 2Mtr height shall be used proper working plat form man lifter and suggested for
complying with fall arrester or Full body harness
Less than 2Mtr height shall be used the standard insulated ladder
Inspect the ladders prior to work, keep both feet below 3rd rung from top, keep one hand on
ladder minimum at all times and suggested for complying with fall arrester
Proper supervision, conduct job specific toolbox meeting and barricading the entire area
Calibrated equipment shall be used
Insulated hand tools shall be used
Avoid joints for power cable and supply has to be taken via ELCB
Avoid alone working
Use appropriate insulated hand gloves
5.0 Final Checks & Restoration of work area after completion of work:
Prepared by Approved by
Doc No: VEPL /OHSAS/D11 Rev.No:00 Page 6 of 7
VOLTECH ENGINEERS PRIVATE LIMITED.
OPERATIONAL CONTROL PROCEDURE
OCP NO: 04
Personal
Protective
Equipment
Personal
Protective
Equipment
Prepared by Approved by