Saudi Diyar Consultants: King Abdullah Foundation Project
Saudi Diyar Consultants: King Abdullah Foundation Project
Saudi Diyar Consultants: King Abdullah Foundation Project
03 CLIENT REPR.
03
PACKAGED HOT WATER BOILER SCHEDULE WASTE WATER SUBMERSIBLE PUMPS SCHEDULE
HOT WATER HOT WATER WORKING HEATING OIL BOILER
QTY. TYPE OF ELECTRICAL DATA FUEL OPERATING
SUPPLY IN SUPPLY OUT WATER RUNNING ON
TEMPERATURE TEMPERATURE
PRESSURE CAPACITY
BURNER BLOWER MOTOR
PUMP AIR COMPRESSOR
CIRCULATION CONSUMPTION PRESSURE EQUIPMENT
REMARKS
QTY. FLOW L/S APPROX. ELECT'L. DATA EQUIPMENT PUMP THE EMERGENCY
CONTRACTOR:
UNIT NO. DESCRIPTION MOTOR MOTOR (gpm)
BAR LOCATION UNIT NO. DESCRIPTION RPM LOCATION OVERALL REMARKS
KW kW kW (HP) L/S DUTY STANDBY HEAD m YES NO
DUTY STANDBY °F °F BARS kW (BHP) - (gpm) (PSI) EACH kW V PH HZ EFF. %
VOLTS HZ (HP) (HP) L/HR
15 0.56 63.4 3.16 HOTEL BUILDING
A DHWB-1&2
DOMESTIC HOT WATER
BOILER FOR HOTEL & CONVENTION CENTER 1 1 160 180 8.6 2943 (300) OIL FIRED 400 60
(15) (0.75)
2.3 (3)
(1005) 332
8.6
(125)
HOTEL GROUND FLOOR
BOILER ROOM
REGULAR TYPE
BOILER SSP-1,2
WASTE WATER SUBMERSIBLE
PUMP
1 1 (50)
14
(20 psi) 3500 3.5 400 3 60 BASEMENT FLOOR
44.6 % SUBMERSIBLE- DOUBLEX A
WASTE WATER SUBMERSIBLE 3.16 14 HOTEL BUILDING
SSP-3,4 1 1 (50) 3500 3.5 400 3 60 44.2 % SUBMERSIBLE- DOUBLEX
PUMP (20 psi) BASEMENT FLOOR
H-HWRCP-5,6 HOT WATER RETURN CIRCULATING 10 HOTEL BUILDING 4. ALL WORKS ON SITE SHALL BE EXECUTED STRICTLY
1 1 2 3500 2
PUMP SERVING HOTEL (1 BAR) 400 3 60 56.6 2ND MEZZANINE FLOOR IN ACCORDANCE WITH APPROVED SHOP DRAWINGS,
COORDINATED WITH ALL DISCIPLINE AND APPROVED
H-HWRCP-7,8 HOT WATER RETURN CIRCULATING 10 HOTEL BUILDING EQUIPMENT FOR THE PROJECT.
1 1 2 3500 2 400 3 60 53.5
PUMP SERVING HOTEL (1 BAR) EIGHTH FLOOR
5. ALL PIPINGS AND JOINTS SHALL BE INSTALLED
B H-HWRCP-9,10 HOT WATER RETURN CIRCULATING
1 1 10 HOTEL BUILDING STRICTLY IN ACCORDANCE WITH MANUFACTURER'S B
HEATING PUMPS SCHEDULE PUMP SERVING HOTEL 2 (1 BAR) 3500 2 400 3 60 56.6 FOURTEEN FLOOR RECOMMENDATION.
QTY. RUNNING ON NOTES: 6. ALL PIPES RUNNING SHALLOWER THAN 900mm
PUMP CAP. APPROX. ELECT'L DATA
DESCRIPTION L/S (GPM) HEAD M. RPM
EQUIPMENT THE EMERGENCY
REMARKS 1 - PUMPS HEAD IS APROXIMATE, CONTRACTOR TO VERIFY AND SUBMIT FOR APPROVAL PRIOR TO MATERIAL ORDERING. IN DEPTH OR UNDER TRAFFIC LOAD SHALL BE
UNIT NO. kW
DUTY STANDBY V PH HZ LOCATION YES NO 2 - ALL MOTORS SHALL BE RATED FOR 50 DEG C. AMBIENT TEMP. PROVIDED WITH SLEEVES AND INCASED WITH
EACH (BAR) (HP)
63.4 30 HOTEL GROUND FLOOR 3 - ALL PUMPS SHALL BE CONTROLLED BY BMS SYSTEM. 150mm THICK CONCRETE.
PRIMARY HEATING PUMPS SERVING 45
PPDH-1,2,3 1750 400 3 60 VFD MOTOR DRIVEN PUMPS
DOMESTIC HOT WATER BOILER 2 1 (1005) (3) (60.5) BOILER ROOM 4 - ALL BOOSTER PUMPS SHALL BE VFD MOTOR DRIVEN. 7. UNLESS OTHERWISE SPECIFIED PIPE SLOPE SHALL
NOTES: BE A MIN. 1%. NO DRAINAGE PIPES SHALL RUN
1 - PUMPS HEAD IS APROXIMATE, CONTRACTOR TO VERIFY AND SUBMIT FOR APPROVAL PRIOR TO MATERIAL ORDERING. UNDER THE GROUND WATER TABLE.
2 - ALL MOTORS SHALL BE RATED FOR 50 DEG C. AMBIENT TEMP.
8. ALL PIPINGS AND FITTING SHALL BE INSTALLED
3 - ALL PUMPS SHALL BE CONTROLLED BY BMS SYSTEM.
4 - ALL BOOSTER PUMPS SHALL BE VFD MOTOR DRIVEN. FUEL OIL TANK SCHEDULE STRICTLY IN ACCORDANCE WITH PROJECT
SPECIFICATION AND MANUFACTURER'S RECOMMENDATIONS.
CAPACITY OPER. DES. OPER.
UNIT QTY.
LITERS
DIMENSIONS (m)
EQUIPMENT 9. CONTRACTOR SHALL SUBMIT TECHNICAL PROPOSAL
BLOWDOWN TANK SCHEDULE NO.
DESCRIPTION
DUTY STANDBY
(GALLONS)
PRESS. PRESS.
(PSIG) (PSIG)
TEMP.
(°F) LOCATION
REMARKS FOR BACK FILLING, PRESSURE TESTING, WARNING
TAPES AND FLASHING OF THE SYSTEM STRICTLY
EACH H W L
QTY. AS PER SPECIFICATIONS AND APPLICABLE CODES,
OPER. DES. OPER. EQUIPMENT 15140 HOTEL GROUND FLOOR DOUBLE WALL
UNIT SIZE CONNECTION SIZE BLOWDOWN BMFOT-1&2 BOILER MAIN FUEL OIL TANK TO FEED
2 -- - Ø 2.5 5 ATM 50 100
FOR THE APPROVAL OF ENGINEER.
DESCRIPTION (LIT.) (MM) PRESS. PRESS. TEMP. LOCATION REMARKS THE HOT WATER&STEAM BOILERS (4000) BOILER ROOM PRESENT
NO. 10. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS
DUTY STANDBY (L/S) HOTEL GROUND FLOOR
INLET OUTLET VENT DRAIN (KPA) (KPA) (°C) BOILER DAILY FUEL OIL TANK TO FEED 1 --
1514 1.4 1.3 2 ATM 50 100 DOUBLE WALL FULLY COORDINATED WITH ELECTRICAL AND OTHER
BDFOT-1
THE HOT WATER&STEAM BOILERS (400) BOILER ROOM PRESENT
BLOWDOWN TANK UTILITIES. ALL WORKS SHALL BE AS PER APPROVED
HOTEL GROUND FLOOR
BDT-1 TO SERVE MAIN LAUNDRY 1 -- 310 - - - - 0.027 1000 446 124 GMFOT-1&2 GENERATOR MAIN FUEL OIL TANK TO -- 15140 HOTEL GROUND FLOOR DOUBLE WALL SHOP DRAWINGS WITH INVERT LEVELS VERIFIED FOR
STEAM BOILER BOILER ROOM 1 - Ø 2.5 5 ATM 50 100
FEED THE HOTEL GENERATOR (4000) GENERATOR ROOM PRESENT ALL SERVICES.
GENERATOR DAILY FUEL OIL TANK TO 2000 1.3 1.6 2.5
HOTEL GROUND FLOOR DOUBLE WALL 11. ALL WORKS SHALL SATISFY THE USGBC LEED GUIDELINES
GDFOT-1 1 -- ATM 50 100
FEED THE HOTEL GENERATOR (400) GENERATOR ROOM PRESENT FOR MATERIALS, INSTALLATION...ETC.
NOTES :
12.ALL EQUIPMENTS, MATERIALS AND INSTALLATIONS SHALL
COMPLY WITH THE LEED V.3 REFERENCE GUIDE
1.) THE UNDER GROUND FUEL TANKS SHALL BE DOUBLE WALL TANK MANUFACTURED WITH 100% RESIN AND GLASS FIBER REINFORCEMENT(NO SAND FILTERS ARE ACCEPTED).
2.) THE TANKS SHALL BE CAPABLE OF STORING PETROLEUM PRODUCTS WITH SPECIFIC GRAVITY UP TO 1.1. REQUIREMENTS FOR GREEN BUILDING DESIGN AND
3.) DOUBLE-WALL TANKS SHALL HAVE A SPACE BETWEEN THE WALLS TO ALLOW FOR THE FREE FLOW AND CONTAINMENT OF LEAKED PRODUCT FROM THE PRIMARY TANK. CONSTRUCTION- 2009 EDITION.
PRESSURIZATION UNIT SCHEDULE THE SPACE ALSO USED FOR INSERTION OF MONITORING HYDROSTATIC LEAK DETECTION.
4.) THE GOVERNING STANDARD SHALL BE UL STANDARD FOR SAFETY 1316 AND NFPA. ALL TANKS SHALL BE UL CERTIFIED. 13. ALL EQUIPMENTS, MATERIALS AND INSTALLATIONS
5.) THE MANUFACTURE SHALL WARRANTY THE TANK FOR 30 YEARS PERIOD. SHALL COMPLY AS A MINIMUM WITH ASHRAE 90.1-2007
QTY. PUMP CAP. APPROX. ELETRICAL DATA 6.) THE DAILY FUEL TANK SHALL BE DOUBLE WALL TANK OF HEAVY GUAGE STEEL FACTORY CONSTRUCTION COATED WITH THE RUST-INHIBITOR ON INTERIOR PERFORMANCE REQUIREMENTS IN ADDITION TO
UNIT NO. DESCRIPTION HEAD M. RPM EQUIPMENT REMARKS
DUTY STANDBY
L/S (GPM) KW AND EXTERIOR SURFACES AND FINISH EXTERIOR COATING. PERFORMANCE REQUIREMENT IN SCHEDULES AND
EACH (BAR) (HP) V PH HZ LOCATION 7.) PROVIDE NORMAL VENT FOR THE UNDERGROUND TANK AND DAY TANK. PROVIDE EMERGENCY VENT AND VACUUM BREAKER FOR THE DAY TANK. SPECIFICATIONS WHICHEVER IS MORE STRINGENT.
PRESSURIZATION UNIT 1.9 40 3 HOTEL GROUND FLOOR
PU-1 1 1 (4) 3500 (4) 400 3 60
FOR HEATING WATER (30.2) BOILER ROOM
C C
GENERATOR FUEL OIL SUBMERSIBLE PUMPS SCHEDULE
EXPANSION TANK SCHEDULE QTY. RUNNING ON
FLOW L/S APPROX. ELECT'L. DATA EQUIPMENT PUMP THE EMERGENCY
QTY. SYSTEM PRESS. (PSIG) TANK TANK TANK AIR SIZE UNIT NO. (gpm)
SYSTEM TEMP (°F) DESCRIPTION RPM LOCATION OVERALL REMARKS
AT TANK LOCATION PRESSURE VOLUME CHARGE (D x H) EQUIPMENT DUTY STANDBY HEAD m YES NO 3 REVISED AS SHOWN 06-05-2014
REMARKS EACH kW V PH HZ EFF. %
UNIT NO. DESCRIPTION LOCATION
RATING (GAL) (PSIG) METER 2 REVISED AS SHOWN 06-01-2014
DUTY STANDBY MINIMUM MAXIMUM MINIMUM MAXIMUM (PSIG) GENERATOR FUEL OIL SUBMERSIBLE 0.37 INSIDE THE MAIN FUEL
1 -- 10 1.5 SUBMERSIBLE
G-FOSP-1 PUMP (14.5 psi) 3500 400 3 60 OIL TANK AT SITE 1 REVISED AS SHOWN 18-12-2013
(5.7)
SERVING THE GENERATOR
EXPANSION TANK 30 125 125 1000 HOTEL GROUND FLOOR INSIDE THE MAIN FUEL
EXPT-1 1 -- 40 180 58 (1.4X3.1) BOILERS FUEL OIL SUBMERSIBLE 0.37 10
TO SERVE HEATING PLANT BOILER ROOM B-FOSP-1&2 2 -- 3500 1.5 400 3 60 OIL TANK AT SITE SUBMERSIBLE REV.NO. DESCRIPTION DATE
PUMP (5.7) (14.5 psi)
SERVING THE BOILERS
NOTES: KEY PLAN
NOTES :
1.) THE EXPANSION TANK SHALL BE ASME RATED. 1. PUMPS SHALL BE SUPPLIED POWER FROM EMERGENCY POWER AND BOTH DUTY & STAND-BY PUMPS CAN RUN TOGETHER AT PEAK LOAD.
2.) THE TANKS SHALL BE PRECHARGED BLADDER-TYPE. 2. CONTRACTOR SHALL VERIFY THE ACTUAL PUMP HEAD BASED ON APPROVED SHOP DRAWINGS AND SUBMIT CALCULATIONS FOR THE APPROVAL. CONTRACTOR SHALL
3.) THE BLADDER SHALL BE HEAVY DUTY BUTYL RUBBER. PROVIDE SLOW CLOSSING VALVES IN PUMP DISCHARGE TO AVOID WATER HAMMER & SURGE CONDITION.
4.) THE WATER SHALL BE INSIDE THE HEAVY DUTY BLADDER THERE BY ELIMINATES TANK CORROSION.
SEC
3. ALL LIFT PUMPS SHALL BE SUBMERSIBLE TYPE WITH WEARING RINGS,IMPELLER, GUIDE RAIL SYSTEM AND ALL THE BOLTS AND FASTENERS SHALL BE STAINLESS
5.) EXPANSION TANK SHALL BE PROVIDED WITH PRESSURE GAUGE, AUTOMATIC VENT AND DRAIN VALVE.
STEEL WEARING RING, MOTOR SHALL BE UL LISTED, ALL OTHER PARTS SHALL BE EPOXY COATED. OPEN
BELOW
DES. FLUID
UNIT DIMENSIONS CONNECTION SIZE QUANTITY MOTOR NOTES :- CIVIL MECHANICAL ELECTRICAL
LOCATION SERVICE
D NO.
CAPACITY
(MM) (MM)
CAP. PRESS. TEMP. NPSHR 1 - SIZE OF SOFTENER/BRINE TANK AND ESTIMATED GRAINS SHOULD BE VERIFIED BY CONTRACTOR D
(BAR) KW EQUIPMENT ACCORDING TO WATER ANALYSIS. SUBMIT CALCULATION AND SELECTIONS FOR APPROVAL.
(LITERS) H DIA INLET OUTLET VENT
(°C)
(M)
DUTY STAND BY
(HP)
RPM ELECTRICAL
LOCATION 2 - SOFTENERS SHALL BE COMPLETE WITH MOTORIZED CONTROL VALVE, POLYGLASS REINFORCED MINERAL TANK, ON HOLD
(L/S)
METER REGENERATION TO ACTIVATE AUTOMATICALLY ACCORDING TO WATER USAGE WITH SAFETY BRINE VALVE. NC NK TO
- - - - - - 0.37 HOTEL BUILDING
CON-TANK-1 COMPRESSOR ROOM BASEMENT FLOOR LAUNDRY 450 0.113 1.7 100.0 1 1 3500 230V/1PH-60HZ
- - - (0.5) BASEMENT FLOOR
- - -
AIR SEPARATOR SCHEDULE PLATE HEAT EXCHANGER SCHEDULE SERVING THE KITCHEN AREAS FOR THE HOTEL MZ CAD F.H
K-H.X-6
HOTEL BUILDING KITCHEN WATER
10 DEG. CELSIUS HEAT EXCHANGER
1 - 40 0.72 22 10 2 1.2 6.7 14 2
HOTEL BUILDING
TWENTY FOURTH FLOOR KING ABDULLAH
QTY.
ELECT'L DATA FOUNDATION PROJECT
V WATT HZ
HOTEL BUILDING
ON HOLD
1 230 550 60
GROUND FLOOR
HOTEL BUILDING
1 230 230 60
FIRST FLOOR
1
HOTEL BUILDING
230 230 60
PLATE HEAT EXCHANGER SCHEDULE
FIRST FLOOR
DRAWING TITLE:
HOTEL BUILDING HOT SIDE COLD SIDE
1 230 96 60
FIRST FLOOR MAXIMUM MAXIMUM
QTY. TOTAL
WATER FLOW EWT LWT PRESSURE WATER FLOW EWT LWT PRESSURE EQUIPMENT B01 - HOTEL
HOTEL BUILDING 230 230 60 UNIT NO. DESCRIPTION CAPACITY (°C) (°C) DROP (°C) (°C) DROP REMARKS
1 (L/S) (L/S) LOCATION
2ND FLOOR DUTY STANDBY (KW) m m
*FINAL SELECTION OF UV-STERILIZERS SHOULD BE SUBJECT TO THE SUPPLIER SPECIALIST, HOWEVER HOTEL BUILDING HOT WATER HOTEL BUILDING SCALE DATE SHEET NO.
IT SHOULD BE BASED ON THE FINAL EQUIPMENT SELECTION. H-HWR-H.X-4 1 -- 31.4 1.5 60 55 2 1.5 55 60 2
RETURN HEAT EXCHANGER-4 FOURTEEN FLOOR
1045 B01-P400 3
1 2 3 4 5 6
Saudi Diyar Consultants