Piping Pressure Drop and Pump Design Calculation Sheet: PT Ca Ltex Pacific Indonesia
Piping Pressure Drop and Pump Design Calculation Sheet: PT Ca Ltex Pacific Indonesia
Piping Pressure Drop and Pump Design Calculation Sheet: PT Ca Ltex Pacific Indonesia
5
PUMP DESIGN CALCULATION SHEET 1/1
PT Ca ltex Pacific Indonesia DATE 30-Sep-99 JOB No. 2512
REV. DATE DESCRIPTION BY CHK'D APP'D
DURI STEAMFLOOD PROJECT 5 30-Sep-99 RE-ISSUED FOR BID PACKAGE YKW ANR TSR
AREA 11
112.7 psig
60 psig
HHLL 27 ft
LLLL 3.4 ft
10" dia
14" dia 590 ft
18" dia 4920 ft
33 ft FE W
24" dia 24" x 10"
10' 14" x 10" 1650 ft
20" x 14"
Area Production
Header
PF Heat Exchanger Degassing Boot
Surge Vessel Production Transfer Pump
(CGS - N) (CGS - N)
811x.V.902 811x.P.901 A/B/C
CGS - N
2512/ANG/539080112.xls/811x.P.901 A-C 1 of 3
Sheet No. REV. 0
PUMP DESIGN CALCULATION SHEET
1/1
REV. DATE DESCRIPTION BY CHK'D APP'D
PT Ca ltex Pacific Indonesia
0 05/02/02 ISSUED FOR INTERNAL REVIEW ARH ARH
1 15/02/02 ISSUED FOR CLIENT REVIEW ARH ARH
DURI AWT-10 BID PACKAGE DEVELOPMENT
HHLL 16.5 ft
LLLL 6 ft
HHLL 14.5 ft
6 inch
12 inch 20 ft
HHLL 14.5 ft 20 ft 8 inch - 18000 ft LLLL 4 ft
16 inch
LLLL 4 ft 10 ft
OPERATING CONDITIONS
1. Capacity 103,943 BPD 103943 8. Density 62.4 lb/ft3
Design 5,197 BPH 34647.67 9. Maximum Vapor Pressure 6.71 psia
2. Operation hours 20 Hours 10. Normal Viscosity 1.00 cP
3. No of operation pumps 3 Units 11. Capacity Maximum 34,648 BPD
4. No of spare pumps 1 Units 1,011 GPM
5. Fluid Name Waste Water 12. Capacity Overdesign 20 %
6. Normal Temperature 175 oF 13. Capacity Design 1,213 GPM
7. Normal Specific Gravity 1.00 14. Roughness Factor 0.005 Cast Iron
5.3E-06 FRP
DISCHARGE