The document provides an estimation of concrete quantities and required shuttering for a construction project. It includes a table with the dimensions, volumes of concrete and required shuttering areas for various structural elements of the building. These include a base slab, long walls, short walls, baffle walls, slabs, beams, staircases, inlets etc. The total estimated concrete quantity is 123.209 cubic meters and the total shuttering area required is 4.305 square meters for the base slab. For other RCC elements, the total concrete quantity is 112.008 cubic meters and the total shuttering area is not provided. With a 10% wastage, the grand total concrete estimate is 123.209 cubic meters.

Uploaded by

epe civil1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
126 views2 pages

CCT CT Concrete

The document provides an estimation of concrete quantities and required shuttering for a construction project. It includes a table with the dimensions, volumes of concrete and required shuttering areas for various structural elements of the building. These include a base slab, long walls, short walls, baffle walls, slabs, beams, staircases, inlets etc. The total estimated concrete quantity is 123.209 cubic meters and the total shuttering area required is 4.305 square meters for the base slab. For other RCC elements, the total concrete quantity is 112.008 cubic meters and the total shuttering area is not provided. With a 10% wastage, the grand total concrete estimate is 123.209 cubic meters.

Uploaded by

epe civil1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

Estimation SBR (CONCRETE QUANTITY)

Rect Trap
Concrete Shuttering
No Length (m) Depth (m) Width (m)
(m3) (m2)

Base Slab 1 13.7 0.1 6.8 9.32 4.1

Total 9.32 4.1


Wastage
10% 0.932 0.205

TOTAL 10.252 4.305

2. RCC (M30 & M25)

Rect Trap
Concrete Shuttering
No Length (m) Depth (m) Width (m) a (m) b (m) h(m) (m3) (m2)
Raft

Base Slab 1 13.5 0.300 6.6 26.73 12.06

Total 26.73
Wastage
10% 2.673

Total Raft 29.403

Others

Long Wall 2 12 3.500 0.25 21 168

Short Wall 2 5.1 3.500 0.25 8.925 71.4

Baffle Walls 4 3.6 3.800 0.25 13.68 109.44

Slab @ 4.40m 1 9.6 5.100 0.2 9.792 54.84


Roof Slab 1 9.6 5.100 0.15 7.344 97.92

C1 2 0.3 7.450 0.38 1.6986 20.264

C2 4 0.38 7.450 0.3 3.3972 40.528

B1 1 9.83 0.500 0.3 1.4745 12.779

B2 1 9.83 0.500 0.3 1.4745 12.779

Beam BB 1 4.9 0.500 0.3 0.735 6.37

Beam BD 1 4.9 0.500 0.3 0.735 6.37

Beam BC 1 4.9 0.500 0.3 0.735 6.37

Lintel Beam 2 4.9 0.380 0.23 0.85652 8.575

Lintel Beam 2 4.53 0.380 0.23 0.791844 7.9275

RBB ,RBC,RBD 3 5.2 0.450 0.3 2.106 15.6

RB1,RB2 2 9.83 0.450 0.3 2.6541 20.643

1
RB1A 1 5.3 0.450 0.3 0.7155 6.36

Beam 5 1.2 0.380 0.3 0.684 4.92

Staircase Flight & Landing 1 2.525 0.150 1.2 0.4545 4.1475

Staircase Flight & Landing 1 1.5 0.150 1.2 0.27 2.61

Staircase Flight & Landing 1 1.956 0.150 1.2 0.35208 3.294

Staircase Flight & Landing 1 1.5 0.150 1.2 0.27 2.61

Inlet 4 1 2.050 0.15 1.23 16.4

Inlet 4 1 2.050 0.15 1.23 16.4

82.605344 0

Total 112.008344 0
Wastage
10% 11.2008344 0

Total Quantity (Raft + all other) 123.2091784