Work Procedure For Gypsum False Ceiling: Sandvik PVT LTD, Dapodi, Pune
Work Procedure For Gypsum False Ceiling: Sandvik PVT LTD, Dapodi, Pune
1.Objective:-
This procedure is prepared to carry out ceiling and partition worksto line, level as per drawing.
2.Scope:-
Procedure shall be adopted for all the works of Architects evolution for the Sandvik Pvt Ltd,
Dapodi, Pune.
3. References:-
1. Technical Specification.
2. Approved relevant drawings.
3. BOQ item no:- SAND-BOQ-INT-01 – I – 59
4. Responsibility:-
Section in charge/Supervisor:
Concern section in charge and Supervisor shall execute out work as per procedure and
maintain the checklist for days work.
QA/QC Engineer:
Page 1|2
Sandvik Pvt Ltd, Dapodi, pune.
Gypsum board of Saint Gobain, GI framing, Suspenders (Make : Saint Gobain Gyproc), Jointing
Compound, Right angle, Cutting machine, Grinding Machine, Level Tube, jointing tape etc.
7. WORK PROCEDURE:
Prerequisite
Ensure all previous works relating to gypsum ceiling and partition works have been completed
prior to commencement of job.
Ceiling System
1. Drop C-channels from the concrete ceiling slab to the level of the main ceiling support,
attaching the C-channels to the slab using a nail gun.
2. To the dropped vertical C-channels, fix on a horizontal plane the main ceiling support – an
arrangement of furring channels and C-channels bound together using wire clips.
3. Fix gypsum boards to the main ceiling support by means of gypsum black screws.
4. Reinforce the joints at the interface between gypsum boards using mesh tape and gypsum
joint compound.
5. Apply gypsum joint compound to screw holes and other areas as required.
6. Apply edge trim, corner tape and gypsum joint compound as required.
7. Complete cut-outs for relevant appliances (diffusers, lights, etc.) if applicable.
Page 2|2