Manual Notes 4
Manual Notes 4
---------------------------------
1. S/w Testing:
--------------
Implementation activities
-------------------------
Req gathering
BRS/SRS
project plan
design
coding
Testing
2. Verification:
----------------
It is a process of verifying the developing project is correct or not
3. Validation:
--------------
S/w Testing---Validation+Verification
4.
SDLC Models:
-----------
Based on project and client requirement, SDLc models are divided into 2 types
i) Waterfall model
ii) V-model
2. Incremental model: Big size project or big size requimnets than we go gor
Incremntal, part by part