SDLC:
-----
7. Designing:
-------------
8. Coding:
----------
9. Testing:
----------
once coding is done before giving to the testing team the developers will
test the application @there end
ii) Integration Testing: Combining all parts of a code and conducting testing
is called as Integration/interconnected Testing
ii) When 100% coding and white box Testing is done than the developers will give
the application for Testing---Entry Criteria
exp=Act--signoff
exp#Act--defect/Bug
10. Release
--------------
This is SDLC