The document discusses the software development life cycle (SDLC) process. It covers project planning, designing, coding, testing, release, and support & maintenance. Testing is done in four levels - unit, integration, system, and user acceptance testing. It also discusses white box and black box testing methods.

Uploaded by

victor othugadi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views

Manual Notes 3

The document discusses the software development life cycle (SDLC) process. It covers project planning, designing, coding, testing, release, and support & maintenance. Testing is done in four levels - unit, integration, system, and user acceptance testing. It also discusses white box and black box testing methods.

Uploaded by

victor othugadi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
You are on page 1/ 3

Day-03

------

SDLC:
-----

Vi) Project Planning:


-----------------
It is prepared by PM, After Analysing the requirements based on
the requirements the PM prepares the project Plan

duration,developers, Testers, designing team, Automation, os....

7. Designing:
-------------

It is done by Technical team/Architect team

Based on requirements design team will design in 2 different WAYS

i) HLD: High level design: outlook of an application

ii) LLD: low level design: innerlook of an application

8. Coding:
----------

Based on requirments coding will be done by developers..

9. Testing:
----------

once coding is done before giving to the testing team the developers will
test the application @there end

i) White box Testing: Testing done by developers

under white box Testing 2 levels

i) unit Testing: Testing each and every part of a code

ii) Integration Testing: Combining all parts of a code and conducting testing
is called as Integration/interconnected Testing

ii) When 100% coding and white box Testing is done than the developers will give
the application for Testing---Entry Criteria

iii) Black Box Testing:


-----------------------

Testing done by Testers


2 levels

i) System Testing: Compare the Expected to Actual value

expected: Client Requirement

Actual: Application developed

exp=Act--signoff
exp#Act--defect/Bug

ii) UAT(user acceptance Testing):After System Testing before submitting


application to client, Conducting testing along
with Business Analyst

* 4 levels Testing: unit, integration, System & UAT

* 2 methods Testing : white & Black Box Testing

10. Release
--------------

Finally, Testing is completed we will release an application to client here

11. Support & Maintainance:


----------------------------

After release an application to the client, during utilisation if customer faces


any problem we have to support them

This is SDLC

Manual batch(4 to 5 weeks)--1 (Mon-Friday)

TOOLs--Bug Tracking & Test Management tools

Live project--Agile process