REQUEST DATE:
QUALITY CONTROL - WORKS INSPECTION ITEMS: Door Hardware
REF. NO.:
TITLE OF THE PROJECT Sandvik Pvt Ltd G Block
PACKAGE C&I packages
CONTRACTOR Architec ts Evolution
DESCRIPTION OF WORKS INSPECTION OF INSTALLATION OF MATERIALS FOR QUALITY COMPLIANCE
CONTRACT CLAUSE DATE
INSPECTION BY
BOQ REF. NO. NA TIME
ITEM DETAILS: Door Hardware WING NO. G Block
LOCATION FOR
INSPECTION All area
FLOOR NO. 3rd floor AREA Coromet, Projects
CHECK FOR QUALITY COMPLIANCE/ NON-CONFORMITY
Sr.No INSPECTION DETAILS Date of Inspection
ROUND 1 ROUND 2 REMARKS
A Hinges
1 Check for make
2 Check for model number
3 Check for dimension
4 Check for positioning as per drawing
5 Check for screws for fixing
6 Check for working condition
Handles
1 Check for make
2 Check for model number
3 Check for dimension
4 Check for positioning as per drawing
5 Check for screws for fixing
6 Check for working condition
B Lock
1 Check for make
2 Check for model number
3 Check for dimension
4 Check for positioning as per drawing
5 Check for screws for fixing
6 Check for working condition
7 Check for number of keys
C Door Closer
1 Check for make
2 Check for model number
3 Check for dimension
4 Check for positioning as per drawing
5 Check for screws for fixing
6 Check for Closing speed
7 Check for Latching action
8 Check for Backcheck
9 Check for Delayed action
Page 1 of 2
REQUEST DATE:
QUALITY CONTROL - WORKS INSPECTION ITEMS: Door Hardware
REF. NO.:
TITLE OF THE PROJECT Sandvik Pvt Ltd G Block
D Patch Fitting
1 Check for make
2 Check for model number
3 Check for dimension
4 Check for positioning as per drawing
5 Check for screws for fixing
6 Check for working condition
Observations if any :
Contractor/Vendor JLL Archtect/Consultant
Signature : Signature : Signature :
Name : Name : Name :
Date : Date : Date :
Page 2 of 2