0% found this document useful (0 votes)
25 views3 pages

Render SelftestPERT

This document discusses project management techniques like PERT and CPM. It provides definitions of key terms used in PERT/CPM like critical path, slack time, three time estimates, and crashing a project. The document is a self-test with multiple choice questions to test understanding of PERT/CPM concepts.

Uploaded by

Saeym Segovia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views3 pages

Render SelftestPERT

This document discusses project management techniques like PERT and CPM. It provides definitions of key terms used in PERT/CPM like critical path, slack time, three time estimates, and crashing a project. The document is a self-test with multiple choice questions to test understanding of PERT/CPM concepts.

Uploaded by

Saeym Segovia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

SELF-TEST PROJECT MANAGEMENT 4.

The latest finish time for an activity is found


(PERT/CPM) during the

1. Network models such as PERT and CPM are backward pass through the network. The latest
used finish

a. to plan large and complex projects. time is equal to

b. to schedule large and complex projects. a. the largest LF of the activities for which it is
an imme diate predecessor.
c. to monitor large and complex projects.
b. the smallest LF of the activities for which it is
d. to control large and complex projects.
an
e. for all of the above.
immediate predecessor.

c. the largest LS of the activities for which it is


2. The primary difference between PERT and an imme diate predecessor.
CPM is that
d. the smallest LS of the activities for which it
a. PERT uses one time estimate. is an immediate predecessor.

b. CPM has three time estimates. 5. When PERT is used and probabilities are
found, one of
c. PERT has three time estimates.
the assumptions that is made is that
d. with CPM, it is assumed that all activities can
be per formed at the same time. a. all activities are on the critical path.

b. activity times are independent.

3. The earliest start time for an activity is equal c. all activities have the same variance.
to
d. the project variance is equal to the sum of
a. the largest EF of the immediate the
predecessors.
variances of all activities in the project.
b. the smallest EF of the immediate
e. all of the above
predecessors.

c. the largest ES of the immediate predecessors.


6. In PERT, the time estimate b represents
d. the smallest ES of the immediate
predecessors. a. the most optimistic time.

b. the most likely time.

c. the most pessimistic time.

d. the expected time.

e. none of the above.


7. In PERT, slack time equals 10. If the project completion time is normally
distributed and the due date for the project is
a. EF - ES.
greater than the expected completion time,
b. LS - ES. then the probability that the project will be
finished by the due date is
c. 0.
a. less than 0.50.
d. ES + t.
b. greater than 0.50.
e. none of the above.
c. equal to 0.50.

d. undeterminable without more information.


8. The standard deviation for the PERT project
is approximately

a. the square root of the sum of the variances 11. If activity A is not on the critical path, then
along the the slack for

critical path. A will equal

b. the sum of the critical path activity standard a. LF-EF


deviations.
b. EF-ES
c. the square root of the sum of the variances of
c. 0.
the proj ect activities.
d. all of the above.
d. all of the above.

e. none of the above.


12. If a project is to be crashed at the minimum
possible
9. The critical path is the
additional cost, then the first activity to be
a. shortest path in a network. crashed must be

b. longest path in a network. a. on the critical path.

c. path with the smallest variance. b. the one with the shortest activity time.

d. path with the largest variance. c. the one with the longest activity time.

e. none of the above. d. the one with the lowest cost.

13. ____CRITICAL PATH__________ activities


are ones that will delay the

entire project if they are late or delayed.

14. PERT stands for PROGRAM EVALUATION


AND REVIEW TECHNIQUE
15. Project crashing can be performed using a

__LINEAR PROGRAMMING
MODEL____________.

16. PERT can use three estimates for activity


time. These

three estimates are _OPTIMISTIC, MOST


LIKELY, PESSIMISTIC

17. The latest start time minus the earliest start


time is called

the SLACK time for any activity.

18. The percent of project completion, value of


work

completed, and actual activity costs are used to

MONITOR AND CONTROL projects.