Render SelftestPERT
Render SelftestPERT
1. Network models such as PERT and CPM are backward pass through the network. The latest
used finish
b. to schedule large and complex projects. a. the largest LF of the activities for which it is
an imme diate predecessor.
c. to monitor large and complex projects.
b. the smallest LF of the activities for which it is
d. to control large and complex projects.
an
e. for all of the above.
immediate predecessor.
b. CPM has three time estimates. 5. When PERT is used and probabilities are
found, one of
c. PERT has three time estimates.
the assumptions that is made is that
d. with CPM, it is assumed that all activities can
be per formed at the same time. a. all activities are on the critical path.
3. The earliest start time for an activity is equal c. all activities have the same variance.
to
d. the project variance is equal to the sum of
a. the largest EF of the immediate the
predecessors.
variances of all activities in the project.
b. the smallest EF of the immediate
e. all of the above
predecessors.
a. the square root of the sum of the variances 11. If activity A is not on the critical path, then
along the the slack for
c. path with the smallest variance. b. the one with the shortest activity time.
d. path with the largest variance. c. the one with the longest activity time.