TK PIPING PQ Korea
TK PIPING PQ Korea
TK PIPING PQ Korea
1. Company Profile
1-1. Introduction
1-2. Company Overview
1-3. Organization
1-4. Business License
1-5. ISO 9001
3. Quality Manual
4. Reference List
2
Chapter 1.
Company Profile
1. Introduction
2. Company Overview
3. Organization
4. Business License
3
Chapter 1.
COMPANY INTRODUCTION
COMPANY OVERVIEW
Employee 11 persons
Contact
Tel. +82-2-858-8534 (Rep.)
COMPANY OVERVIEW
- LOCATION
SEOUL OFFICE
#413, Leaders Tower, 286, Beotkkot-ro,
Geumcheon-gu, 08511, Korea
WAREHOUSE
686, Seokpo-ri, Seokpo-myeon,
Bonghwa-gun, Gyeongsangbuk-do,
Republic of Korea
VIETNAM Branch
Vung Tau Province, VIETNAM
ORGANIZATION
- SUB-CONSTRUCTOR,
- SPOOL FABRICATOR,
- LNG PLANT.
BUSINESS LICENSE
QUALITY CERTIFICATE
1. SALES PRODUCTS
Fittings PIPE
- Wrought Fitting - SMLS PIPE
- Forged Fitting - Welded PIPE
Flange Etc
- Blind Flange - Valve
- W/N Flange - Gasket
- GRP Piping
- HDPE Piping
TK PIPING CO., LTD 11
Chapter 2.
1. SALES PRODUCTS
1. SALES PRODUCTS
1. SALES PRODUCTS
SS WELDED PIPE
1. SALES PRODUCTS
FLANGE
TK FLANGE KOREA
VALVE
DONGKANG KOREA
KM TECH KOREA
1. ERNE FITTING
- REDUCER A234 WP22 CL.3
2. TK Corporation
- TEE A234 WP9 CL.1
3. HUSTEEL
- API 5L GR.B/ X42 ERW PIPE
4. TENARIS
- A106 Gr.B SMLS PIPE
Q.A MANUAL
1. SCOPE
This Section defines the responsibilities and describes the control of the Quality
System Manual. Also describes the management review to assure the effective
implementation of QS Manual, and provides for indoctrination and training of
personnel performing verifying, or managing activities affecting quality
This Quality System Manual takes into consideration of the technical aspects and
provide for planning and accomplishment of activities affecting quality. The
program takes into account the need for any special controls, processes, test
equipment, tools and skills to attain the required quality and for verification of
quality by examination, inspection or test to manufacture the acceptable
materials.
The Quality System Manual and revision thereto shall be prepared and
maintained by the QA Team
The Quality System Manual and revision thereto shall be reviewed by the QA
Manager, and approved by President
The Quality System Manual is revised on each Section basis, and identified
with an under line on the portions of applicable paragraph and revision
number and date on the Section Ⅱ Table of Contents.
The QS Manual shall be responsible for maintain current with the latest
revisions by the QA Manager. Only controlled copies of the Quality System
Manual shall be distributed for use within SAMKWANG organization and
personnel and Controlled copies may be distributed outside SAMKWANG at
the discretion of the QA Manager.
The Controlled QS Manual cover sheet shall be identified with the control
number including indication of controlled of uncontrolled status.
For internal distribution of the QS Manual, copies shall be hand carried to the
President and all Managers, as a minimum. QS Manual to be distributed
outside SUNJIN shall be sent with a Document Transmittal Sheet.
Distribution of revisions to controlled Quality System Manual shall be
handled in the same manner as the original distribution.
Responsibilities
The QA Manager shall be responsible for the overall Indoctrination and Training
program for indoctrination and training of all personnel and monitoring for
performance of Indoctrination and Training and follow-up action.
General requirements
(2) The extent of indoctrination and training shall be commensurate with the
scope, complexity, and nature of the activity as well as the education,
experience, and proficiency of the person.
(3) Training programs shall include;
(a) Personnel to be indoctrinated or trained shall be identified.
(b) Basic job duties, functions, and responsibilities as related to other
Individuals and Teams.
(c) Functions related to the various Chapters of the QS Manual, supporting
procedures and associated documents.
(d) Spec Code and other Standards
(e) Training shall be provided, as needed, to achieve initial proficiency, maintain
proficiency, and adapt to changes in technology, methods, and job
responsibilities.
REFERENCE LIST
32
Chapter 4.
REFERENCE LIST
YEAR END USER CLIENT PROJECT NAME ITEM
KOREA
2018 HKC Boryeong Thermal Power Plant PIPE / FITTING / FLANGE
MIDLAND POWER
2018 DAE SUNG GAS KMT Yeosu Daesung Gas Facility PIPE / FITTINGS
2018 HANHWA CHEMICAL Sungbo Powertec ULSAN CHEMICAL PIPE / FITTING / FLANGE
HYUNDAI
2018 KNPC ENGINEERING KLNG PROJECT CS SMLS PIPE
HYUNDAI
2018 KNPC KLNG –KOC Tie in - PROJECT CS SMLS PIPE
ENGINEERING
HYUNDAI
2018 CEEG. Spa ENGINEERING Ain Arnat 1200mw CCPP Project SS SMLS PIPE
REFERENCE LIST
YEAR END USER CLIENT PROJECT NAME ITEM
Daejung
2018 GS GALTEX Gunsan Bio Kombinat PIPE / FITTINGS / FLANGE
Development
DAE AH E&C
LG VINA DOP/DINP 80,000
2018 DAE AH E&C VIETNAM PIPE / FITTINGS / FLANGE
MTPY EXPANSION
BRANCH
Hyundai Heavy
2018 WON IL TNI SINOPEC PIPE / TUBE SHEET
Industries
2019 CGN DASAN POWER SeKwang Industrial Daesan Biomass Power Plant Gasket, Bolt
REFERENCE LIST
YEAR END USER CLIENT PROJECT NAME ITEM
2019 PETRO BRAS MODEC Singapore MV31 FPSO GUANARA CU-Ni, Titanium
2019 PETRO BRAS MODEC Singapore MV31 FPSO GUANARA Alloy Pipe, Fitting, Flange
2020 CHUNBO Chemical Dong-Il CHUNBO TANK Hastelloy C22 Plate, Tube