Grade 20 Concrete Mix: Nama Projek: Tajuk Lukisan: Direkabentuk: Dilukis: Disemak: Tarikh: Skel: OCT, 2017 As Shown
Grade 20 Concrete Mix: Nama Projek: Tajuk Lukisan: Direkabentuk: Dilukis: Disemak: Tarikh: Skel: OCT, 2017 As Shown
Grade 20 Concrete Mix: Nama Projek: Tajuk Lukisan: Direkabentuk: Dilukis: Disemak: Tarikh: Skel: OCT, 2017 As Shown
30
INSTALLED BY KERB MAKER MACHINE
272
152
150
90
3. ALL DIMENSION OF MOULD SHAPES TO BE IN MILLIMETRES
40
SCALE
30
60
300
REINSTATEMENT WORK
302
ALL EXISTING ROAD, FOOTPATH ETC, DAMAGED DURING
Y10 STEEL BAR
36
30
36
30
36
30
36
30
36 60 30 30 60 CONSTRUCTION SHALL BE REINSTATED AND RECTIFIED BY
60 CONSTRUCTOR.
62
40
PLAN AND SECTION DETAIL OF REINFORCED PRECAST CONCRETE INLET SUMP
NTS
50 100
CONCRETE DRAIN CONCRETE FOOTPATH
272
272
100 GRADE 20
CONCRETE MIX
REINFORCED PRECAST
225 X 225 OPENING CONCRETE INLET SUMP TO REINFORCED PRECAST
100
DETAIL CONCRETE INLET SUMP TO
DETAIL
225
WELL COMPACTED HARDCORE
100 GRADE 20 CONCRETE MIX
DISEMAK:
AND MAINTENANCE WORK FOR ROAD DETAILS FOR PRECAST REINFORCED
UTARA TARIKH: OCT, 2017
SIDE KERB, PEDESTRIAN WALKWAY AND CONCRETE OUTLET CHANNEL
OUTLET CHANNEL WITHIN DBKU AREA, NO KERJA: NO LUKISAN:
ARKITEK/JURUTERA/PERANCANG SKEL: AS SHOWN KUCHING DBKU / IMT/ L / 17 - 18 9/14