G - Floor: Bracket Wall Fan Ceiling Fan Lights
G - Floor: Bracket Wall Fan Ceiling Fan Lights
Tube Lights – 4 ft
Tube Light – 2 ft
LED Saver Lights
Sr
Exast Fan
TOTAL
TOTAL
TOTAL
:N
Wahid
Millat
G.F.C
Royal
Royal
Blubs
GFC
Pak
Pak
o
G - Floor
1 LHS Big Room No:1
(Last LHS End) back End WallWindow
towardslast end gate wall 4-00 x 3’6’’
2 Front small R.No:2
(On Back Wall) towards gali and towards
big long inside baramda corridor indoor
wall window 4-00x3-6’’
(Attach B/Room ) High ventilator Left wall
1.6’’x2.6’’
Right wall 1.6’’x2.6’’
3 RHS Big Room No:3
(Last RHS End)in backwall
W=4-00x3-6’’
4 RHS Computer Room No:4 (Comp:
Room)
(Middle in RHS Row)
One door & one window W=
5 RHS Big Room No:5 Elevation
Facing
(Beginning RHS)
1 Door & w=
6 LHS Room No:6
Principal Office - I (Two door entries -
One from open court yard & other from
attached room) (Beginning of LHS)
W=4-00x6-00’’
7 LHS Room No:7
Principal Office - II (Adjacent Main
Principal Office)
Connected with door & ventilator with
Principal Room
8 LHS Stair Portion
Left Side Upstairs (Both Flights I/c
Landing Slab)
9 LHS Under Stairs
Small Room No: 8
(With Tapper Slope Roof)
10 Open Court Yard
A.O. Office
(Glass Door + Glass Window - 2 nos
windows W=4-00x4-00’’ & its Entrance
Gali)
11 Open Court Yard
RHS Accounts Office Room
Door +2 Windows w=4-00 x
12 Open Court Yard
Canteen Near Main Gate
One side door &window towards A.O.
office
13 Open Court Yard
LHS Big Wall
With steel door to out LHS outside gate
14 Open Court Yard
Bath Rooms & Its Gali Portion Towards
Front Wall Side
15 Covered area space between all the
rooms