Design Checklist Interconnection Diagram: Sheet 1 of 4

This document is a 4 page design checklist for electrical engineering drawings including single line diagrams, equipment layouts, and cable tray layouts. It lists over 50 items to check on each drawing type including title blocks, equipment tags, cable sizes, dimensions, references, and general notes. The checklist is intended to ensure consistency and completeness across preliminary and detailed design drawings.

Uploaded by

freij
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views4 pages

Design Checklist Interconnection Diagram: Sheet 1 of 4

This document is a 4 page design checklist for electrical engineering drawings including single line diagrams, equipment layouts, and cable tray layouts. It lists over 50 items to check on each drawing type including title blocks, equipment tags, cable sizes, dimensions, references, and general notes. The checklist is intended to ensure consistency and completeness across preliminary and detailed design drawings.

Uploaded by

freij
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

Sheet 1 of 4

PROJECT TITLE: DESIGN CHECKLIST

PROJECT NO.: Interconnection Diagram

DOCUMENT NO.: ORIGINATED BY: DATE:

REVISION NO.: CHECKED BY: DATE:

Preliminary Engineering
Detailed Engineering

ITEM
NO. ITEMS TO BE CHECKED Checked COMMENTS

1 Title Block / Revision Number/ Drawing Number

2 Presentation as per Typical Standard/ Symbols

3 All equipment vendor reference drawings are identified in the


reference column

4 Checked against single line diagram / MCC Schedule, Cable


schedule and Control Drawings

5 Wiring checked against equipment vendor drawing

6 Wiring checked against schematics

7 Terminal blocks have adequate spare capacity

8 Instrument cable shields are grounded at one end only

9 Instrument signal wires are not mixed with power cables

10 Spare wires are clearly identified

11 Equipment and terminal numbers

12 Cable size and numbers

13 Instrument wiring and termination

14 Thermocouple wiring and termination

15 Wire numbers and / or color where applicable

16 Junction box numbers

17 Line types and weights ( Bus, Cables)

18 Spelling & Font types

L:\Engineering-AllUsers\Elec\DesignCkLists\DesignCkLists.xls\CableTrayLayouts.xls Sept./08 Rev.0


Sheet 2 of 4

PROJECT TITLE: DESIGN CHECKLIST

PROJECT NO.: SLD

DOCUMENT NO.: ORIGINATED BY: DATE:

REVISION NO.: CHECKED BY: DATE:

Preliminary Engineering
Detailed Engineering

ITEM
NO. ITEMS TO BE CHECKED Checked COMMENTS

1 Title Block / Revision Number/ Drawing Number

2 Presentation as per Typical Standard / Symbols

3 Incoming Power Source, Voltage

4 Equipment Tag numbers Correct

5 Bus ratings/ Bus numbers/ Short circuit ratings

6 Transfomer(s) Ratings, Connection Symbols, Grounding

7 Protective devices / meetering

8 breaker ratings - Loading

9 Current and potential transformers (ratio, accuracy)

10 Interlocks (Electrical & Mechanical)

11 Special Motor Symbols (DC/ Synchronous/ Wound Rotor )

12 Switchgear Incoming/Load Cables Sizes / Ratings

13 Lightning & Surge Arrestors shown where needed

14 Redundancy / Flexibility / Safety

15 General Notes

16 Reference drawings

17 Line types and weights ( Bus, Cables)

18 Spelling & Font types

L:\Engineering-AllUsers\Elec\DesignCkLists\DesignCkLists.xls\CableTrayLayouts.xls Sept./08 Rev.0


Sheet 3 of 4

PROJECT TITLE: DESIGN CHECKLIST

PROJECT NO.: Electrical Room Equipment


Layout
DOCUMENT NO.: ORIGINATED BY: DATE:

REVISION NO.: CHECKED BY: DATE:

Preliminary Engineering
Detailed Engineering

ITEM
NO. ITEMS TO BE CHECKED Checked COMMENTS

1 Title Block / Revision Number/ Drawing Number

2 Layout Presentation as per Typical Standard/ Symbols

3 Latest revision plot plan used for background

4 Equipment dimensions per vendor drawings

5 Equipment position dimensions from grid line

6 Equipment tag numbers correct

7 Equipment Access ( Front and Back as required )

8 Equipment Installation / Removal

11 Cross check with Tray Layouts

12
Buried Conduits properly dimensioned for bottom access

13 Section and detail cross reference

14 Key plan/ North arrow / Scale

15 Reference drawings

16 Background line work / Line types and weights

17 General Notes

18 Spelling & Font types

L:\Engineering-AllUsers\Elec\DesignCkLists\DesignCkLists.xls\CableTrayLayouts.xls Sept./08 Rev.0


Sheet 4 of 4

PROJECT TITLE: DESIGN CHECKLIST

PROJECT NO.: CABLE TRAY LAYOUTS

DOCUMENT NO.: ORIGINATED BY: DATE:

REVISION NO.: CHECKED BY: DATE:

Preliminary Engineering
Detailed Engineering

ITEM
NO. ITEMS TO BE CHECKED Checked COMMENTS

1 Title Block / Revision Number/ Drawing Number

2 Layout Presentation as per Typical Standard/ Symbols

3 Latest revision plot plan used for background

4 Critical Dimensions for tray location from grid lines

5 Minimum 12" (300mm ) vertical space between the trays

6 Trays are paralell to grid lines

7 Tray bending radius suitable for largest diameter cable

8 Adequate clearances provided from floor

9 Clash check is done for this layout

10 Standard tray supports are possible by structural steel

11 All Cables exiting electrical rooms are identified

12
Separate trays/Bariers provided for MV, LV and Control cables

13 Cross checked trays going between floors/walls

14 Key plan/ North arrow / Scale

15 Reference drawings

16 Background line work / Line types and weights

17 General Notes

18 Spelling & Font types

L:\Engineering-AllUsers\Elec\DesignCkLists\DesignCkLists.xls\CableTrayLayouts.xls Sept./08 Rev.0