Proposal Cover Letter (5 Real Examples)
Proposal Cover Letter (5 Real Examples)
Joe Soap
ACME Rail Agency
Address
Date
Dear Joe,
Attached is our response to RFP 00/2021 for a turnkey contractor for the upgrading and modernisation
of Disney World’s roller coasters.
The new roller coasters are a critical component of Disney World’s vision to enhance a magical
experience. However, the current facilities are inadequate to accommodate the new rides. To resolve
this, Disney requires an experienced turnkey partner.
By selecting Best Company, Disney will gain a provider with over 35 years experience in theme park
development. We offer the financial, technical contractual capacity and expertise to ensure success. A
proven track record with Disney Paris and Florida reduces risk, costs and time. Our new X-cite rides won
the innovation award at Experience Thrills Awards 2021.
Our response proves our capabilities in delivering a solution that will meet your project specifications. It
complies with all the tender requirements. To assist in a speedy evaluation, we have provided a
compliance matrix.
We look forward to helping Disney set the foundation to create the rides of tomorrow.
Yours sincerely,
James Dean
__________________________
James Dean
CEO
Best Company
SimplexGrinnell’s mission is to develop the most cost-effective and comprehensive solution to your life safety
systems and service needs. Our team stands ready to provide world-class products, service and support. We offer
to work closely with your personnel to ensure that your systems and service needs are met well into the future. Our
customers have relied on SimplexGrinnell personnel and technology to protect thousands of lives and millions of
dollars worth of property.
Our One-Stop-Shop offering includes total support for a wide range of needs. Our capabilities include service
support for annual inspections, testing, and maintenance of all major brands of fire alarm, fire sprinkler, portable fire
extinguisher, emergency lighting, access control, CCTV, intrusion detection systems, sound and communications
equipment. Our trained technicians have extensive expertise in a wide range of fire safety and security equipment.
They use state-of-the-art test equipment to ensure high quality results and are trained to perform related repairs, in
addition to inspections and responding to emergency maintenance requirements. Our customers have consistently
referred to SimplexGrinnell’s life safety services as “Best-Value” for the following reasons:
• Specialized inspection teams trained to identify and correct problems before they occur, thus preventing costly
nuisance alarms and unnecessary downtime.
• Experienced technicians ensure that repairs are done right, and in a timely manner.
• Standardized reporting and documentation.
• Customized service plans to meet any customer’s needs.
• Central station monitoring dedicated to the critical needs of commercial buildings.
We are submitting this bid subject to our being able to work out a mutually satisfactory definitive agreement as to the
parties’ obligations under the Specifications. Our submission of the bid is based on the assumption that if we are the
successful bidder, then such a mutually satisfactory, definitive agreement between the parties will be entered into. In
the event that you are not agreeable to the acceptance of this bid pursuant to the conditions set forth above, or, if we
are awarded the bid but are unable to negotiate a mutually satisfactory definitive agreement with you, then our bid
will be deemed null and void and the same shall be withdrawn from consideration by you without penalty.
Our wish is to build a long-term relationship, providing you with the certainty that the Life Safety systems in your
facilities are functioning at their optimum level.
John Wrycraft,
Operations Manager
COVER LETTER
RE: Chain of Lakes Park – Phase II Design, Engineering and Permitting | RFQ-21-18
Subject:
Design Services for Developing Adaptation Strategies to Respond to
Sea Level Rise (ISD Project No. E16-RER-01)
Robert J. Daoust
Associate Vice President / Project Manager
Our team understands that AMEC is selecting fire suppression contractor for K + S Legacy Project. As the industry
leader in fire protection systems, SimplexGrinnell is fully prepared to undertake this project and to meet or exceed all
project requirements. Our Regina, SK office has a proven track record providing fire sprinkler systems installation
and service throughout the area. Our office is located in an ideal location to service AMEC and K + S’s installation
needs as well as emergency service needs 24 hours a day, seven days a week. SimplexGrinnell has actively
reviewed the project’s needs and has committed a wide range of resources to support this important effort.
Proven as a major prime contractor and integrator of complex projects, SimplexGrinnell has the resources, products,
skills, technology, and expertise required to ensure a successful project. We design, assemble, test, service, and
monitor a complete line of fire protection systems. Our approach is low-risk because of previous experience with
large, complex projects. Our customers have relied on SimplexGrinnell personnel and technology to protect
countless lives and millions of dollars worth of equipment.
We understand the need for a responsive local organization to provide installation support and service throughout the
years to come. Our management team will ensure that the necessary resources are available to support this
important project. We have assigned a multi-disciplinary team to the K + S Legacy project. This team includes Mr.
John Wrycraft, Regional Manager, as the Corporate Sponsor and Mr. Trevor Lee as the project manger for this
project. We have also assigned a safety officer, Mr. Shannon Luoma. Finally, post-installation, Mr. Dean Bousquet,
Total Service Manager, will oversee a team of technicians providing warranty and post warranty support to K + S’
suppression systems. This team will ensure that AMEC’s goals for the project are met.
We wish to form a long-term relationship with AMEC to develop the most cost-effective and comprehensive solutions
to your needs. With an experienced, flexible staff of professional personnel already in place, our team is prepared to
move swiftly to ensure that we meet critical objectives. Moreover, with the backing of the entire SimplexGrinnell
organization, we offer a full range of capabilities to support the project, now and in the years to come. We pledge our
full support to the success of this project.
Sincerely,