0% found this document useful (0 votes)
195 views27 pages

The HKIE Structural Examination - Written Examination 2018: Section 2: Design Questions

The document provides requirements for designing a research centre building in Hong Kong, including: 1. The building must meet minimum headroom, fire resistance rating, and other requirements for different floors serving different functions like laboratories, offices, and an exhibition hall. 2. There are restrictions on vertical structural element spacing depending on the floor and area. 3. Ground conditions based on two boreholes are provided, with loose fill overlying weathered rock, and groundwater one meter below ground. 4. Wind loads and imposed loads shall be designed to the latest Hong Kong standards.

Uploaded by

dexterbox1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
195 views27 pages

The HKIE Structural Examination - Written Examination 2018: Section 2: Design Questions

The document provides requirements for designing a research centre building in Hong Kong, including: 1. The building must meet minimum headroom, fire resistance rating, and other requirements for different floors serving different functions like laboratories, offices, and an exhibition hall. 2. There are restrictions on vertical structural element spacing depending on the floor and area. 3. Ground conditions based on two boreholes are provided, with loose fill overlying weathered rock, and groundwater one meter below ground. 4. Wind loads and imposed loads shall be designed to the latest Hong Kong standards.

Uploaded by

dexterbox1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 27

The HKIE Structural Examination – Written Examination 2018

Section 2: Design Questions


(80% of the Written Examination)

Date: 7 December 2018 (Friday)


Time: 12:15 pm – 6:15 pm
(Duration: 6 hours)

Question Paper

Answer ONE question only


 

Question 1  An Aircraft Hangar by the Seaside 
 
 
Client’s Requirements 
 
The following client’s requirements must be met: 
 
1.  A  large  span  structure  for  a  new  aircraft  hangar  is  proposed  near  the  seaside. 
The ground level is +5 mPD.  The sea level is taken to be 0 mPD.  See figure Q1. 
 
2.  The on plan dimensions of the hangar are 150m by 150m. (Figure Q1 ‐ 1) 
 
3.  The clear headroom of the hangar is 25m.  A two‐storey office (plan area 100m 
by  20m)  is  located  at  the  back  of  the  hangar.    The  storey  height  and  clear 
headroom of each of the office floors is 5m and 3.5m respectively. (Figure Q1 ‐ 2) 
 
4.  The enclosure walls should be steel cladding panels with at least 15% of the wall 
areas to be glass windows. 
 
5.  An  130m  by  130m  wide  structure‐free  zone  is  to  be  provided  at  the  entrance 
and inside the hangar to allow the movement of aircrafts. 
 
6.  The top of the foundations should be at least 2m below the ground surface.  This 
is to give enough room for utility services to pass into the site. 
 
7.  A  minimum  2‐hour  fire  resistance  rating  is  required  for  all  elements  of 
construction for the hangar. 
 
 
Imposed Loads 
 
8.  Roof of hangar    10kN/m2 
Ground floor of hangar    20kN/m2 
 
Office:‐  First floor  10kN/m2 
  Ground floor  20kN/m2 
 
 
 
 
 

 
1
 

Wind Loads 
 
9.  The  site  is  located  near  the  sea.  The  structure  shall  be  checked  against  wind 
loads  in  accordance  with  the  Code  of  Practice  on  Wind  Effects  in  Hong  Kong 
2004. 
 
 
Site Conditions 
 
10.  Ground conditions as revealed by the ground investigation boreholes are: 
 
From Ground level to 3m  Very loose and compressible fill, SPT N‐values range 
from 2 to 4. 
 
From 3m to 5m  Strong  completely  decomposed  granite  in  the  form 
of  dense  to  very  dense  coarse  sands,  SPT  N‐values 
range from 80 to 120. 
 
From 5m onwards  Moderately  decomposed  (Grade  III)  granite  with 
total core recovery greater than 85%. 
 
Groundwater table is found at 3.5m below the existing ground level. 
 
 
Omit from Consideration 
 
11.  Design of wall and roof panels. 
 
12.  Design of lift shafts and stair wells for the office. 
 
13.  Design of the sliding door at the entrance of the hangar. 
 
 
 
 
 
 
 
 
 
 

 
2
 

Section A 
 
a.  Prepare a design appraisal with appropriate sketches and calculations indicating 
two  distinct  and  viable  solutions  for  the  proposed  aircraft  hangar  and  office 
structures.    Candidate  is  allowed  to  prepare  only  one  viable  scheme  for  the 
foundations.  Indicate clearly the functional framing, load transfer and stability 
aspects of each scheme to meet all client’s requirements.  Identify the solution 
you recommend and give reasons for your choice. 
(40 marks) 
 
 
Section B 
 
For the solution recommended in Section A: 
 
b.  Prepare  sufficient  design  calculations  to  establish  the  form  and  size  of  all  the 
principal structural elements including the foundation. 
(20 marks) 
 
c.  Prepare framing plans, sections and elevations to show the dimensions, layout 
and  disposition  of  the  structural  elements  and  critical  details  for  estimating 
purposes. 
(20 marks) 
 
d.  Prepare  a  detailed  method  statement  covering  essential  activities  for  the  safe 
construction of the structure including foundation works. 
(10 marks) 
 
e.  Prepare  a  detailed  construction  program  covering  essential  activities  from 
commencement of foundation to completion of structural works. 
(10 marks) 
 
 

 
3
'A'

2-STOREY OFFICE

COLUMN FREE ZONE


STRUCTURE-FREE ZONE

SLIDING DOOR

'A'
PLAN OF THE AIRCRAFT HANGAR

Figure 41

Figure Q1
4
Ir Dr James LAU

GROUND
WATER
TABLE
OFFICE
COLUMN FREE ZONE
STRUCTURE-FREE ZONE GROUND LEVEL
+5.0mPD
SEA LEVEL
0mPD

SECTION 'A-A'

Figure 42

Figure Q1
5
 

Question 2  Research Centre 
 
 
Client’s Requirements 
 
The following client’s requirements must be met: 
 
1.  A research centre building is to be constructed within the New Territories area 
of Hong Kong.  See figure Q2. 
 
2.  The  proposed  use  of  research  centre  building  with  the  minimum  headroom 
requirements and fire resistance rating is listed as follows: 
 
Floor Mark  Usage  Min. Clear  Fire  Finishes & 
Headroom*  Resistance  E/M Services 
(m)  Rating  Zone (m) 
1/F to 4/F  Laboratory  3.5  2 hours  0.5 
1/F  Exhibition Hall  7.0  2 hours  0.5 
G/F to M/F  Office  2.5  2 hours  0.5 
G/F  High ceiling  6.0  2 hours  0.5 
Laboratory 
G/F  Entrance Lobby  5.0  2 hours  0.5 
B/F  Car Park  2.5  4 hours  0.5 
*  The  minimum  clear  headroom  is  the  floor  height  clear  of  all  structures, 
finishes and building services. 
 
3.  The restrictions on the location of vertical structural elements are as follows: 
 
Floor Mark  Area   Restrictions 
G/F – 4/F  Entrance  Lobby,  ‐ Minimum  spacing  of  internal  columns  is 
Office  and  All  9.0m centres. 
Laboratories  ‐ No  restriction  on  spacing  between  the 
internal column to peripheral wall and/or 
column if any. 
1/F  Exhibition Hall  ‐ Column free area. 
G/F  Driveway/Ramp ‐ No  column/wall  permitted  inside  the 
driveway and access ramp. 
B/F  Car Parking  ‐ Minimum  spacing  of  internal  columns  is 
9.0m centres. 
 
 

 
6
 

Imposed Loads 
 
4.  The  imposed  loads  shall  be  in  accordance  with  the  latest  version  of  the  Hong 
Kong Code of Practice for Dead and Imposed Loads. 
 
 
Wind Loads 
 
5.  The wind loads shall be in accordance with the Code of Practice on Wind Effects 
in Hong Kong 2004. 
 
 
Site Conditions 
 
6.  Abutting the eastern boundary of the site is a 30° natural slope. 
 
7.  Ground conditions are: 
 
Borehole No.1 
 
From +14mPD to +8mPD  :  Loose fill with SPT N‐value < 10. 
 
Below +8mPD  :  Slightly  to  moderately  decomposed  moderately 
strong  rock  of  material  weathering  grade  III  or 
better, with total core recovery of more than 85% 
of the grade. 
 
Borehole No.2 
 
From +10mPD to ‐0mPD  :  Loose Fill with SPT N‐value < 10. 
 
From ‐0mPD to ‐4mPD  :  Medium dense sand with SPT N‐value 10 – 50. 
 
Below ‐4mPD  :  Slightly  to  moderately  decomposed  moderately 
strong  rock  of  material  weathering  grade  III  or 
better,  with  total  core recovery  of  more  than 85% 
of the grade. 
 
The groundwater level is at one meter below existing ground level. 
 
 

 
7
 

Omit from Consideration 
 
8.  Detailed layout and design of the structure inside the service core. 
 
9.  Detailed layout and design of the car park ramp. 
 
10.  Design of curtain wall. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
8
 

Section A 
 
a.  Prepare  an  overall  design  appraisal  of  the  proposed  structure.    Prepare  ONE 
viable  structural  scheme  for  the  research  centre  building.    Based  on  the 
proposed  structural  scheme  for  the  research  centre  building,  provide  TWO 
distinct  and  viable  solutions  with  the  aid  of  appropriate  sketches  for  the 
proposed  superstructure  for  the  exhibition  hall  between  grid  A  to  C  and  from 
1/F  to  4/F.    Indicate  clearly  the  functional  framing  and  load  transfer  path  for 
each  scheme.    Identify  the  solution  you  recommend  and  give  the  reasons  for 
your choice. 
(40 marks) 
 
Section B 
 
For the solution recommended in Section A: 
 
b.  Prepare  design  calculations  to  establish  the  form  and  size  of  all  principal 
structural elements for superstructure from G/F to 3/F, including transfer and/or 
cantilever structures. 
(14 marks) 
 
c.  Prepare  dimensional  framing  plans  for  G/F  to  3/F  including  transfer  and/or 
cantilever structures. 
(20 marks) 
 
d.  Prepare structural details for the principal structural elements from G/F to 3/F, 
including transfer and/or cantilever structures, for cost estimation purpose. 
(14 marks) 
 
e.  Prepare the design calculation for the building foundation. 
(4 marks) 
 
f.  Prepare a preliminary foundation layout plan. 
(4 marks) 
 
g.  Prepare  an  outline  construction  program  covering  essential  activities  from 
commencement of foundation to completion of structural works. 
(4 marks) 

 
9
Figure Q2
10
11
Figure Q2
Figure Q2
12
 

Question 3  Extension of Logistic Centre 
 
 
Client’s Requirements 
 
The following client’s requirements must be met: 
 
1.  A  two‐storey  building  is  proposed  adjacent  to  an  existing  logistic  centre  as  an 
extension. The client requests the construction of extension to be fast‐track. In 
order  not  to  affect  the  operation  of  logistic  centre,  the  client  also  expressed 
vibration  induced  by  any  construction  activities  to  the  existing  building  should 
not exceed peak particle velocity of 5mm/s.  See figure Q3. 
 
2.  The  existing  logistic  centre  building  is  a  four‐storey  reinforced‐concrete 
structure enclosed by curtain wall façade supported on deep foundation. 
 
3.  The new building is 40m x 166m. The ground floor will be served as warehouse 
with  two  covered  car  parks  as  loading/unloading  area.  For  loading/unloading 
purpose, the ground floor level is proposed to be raised by 1.2m. The first floor 
will be used for office. 
 
4.  To  facilitate  future  alteration,  the  client  asks  for  an  open  plan  building.  No 
structural wall is allowed for stair/lift core and anywhere. 
 
5.  The minimum column spacing (centre to centre) is 8m, except for Warehouse A 
and  C,  where  column  spacing  should  be  widened  to  16m  for  storage  of  large 
machinery. Also, no column is allowed at the car parks. 
 
6.  Glazing façade is proposed at office with peripheral columns of 500mm setback 
from building edge. 
 
7.  Minimum  requirements  on  clear  headroom  (clear  height  of  all  structures, 
finishes and building services) are as follows: 
 
Floor  Usage  Min. Clear Headroom (m)  Finishes & E/M Zone (m) 
1/F  Office  3.8  0.6 
G/F  Warehouse  4.0  0.4 
G/F  Car park  5.2  0.4 
 
8.  A minimum 2‐hour fire resistance rating is required for all structural elements. 
 

 
13
 

9.  An  open  footbridge  with  glass  balustrade  is  proposed  on  1/F  for  staff  passage 
from the existing building over the 6m‐width driveway. A clear 5.2m headroom 
of driveway shall be maintained. 
 
 
Imposed Loads 
 
10.  The imposed loads shall be in accordance with the latest version of the Code of 
Practice for Dead and Imposed Loads in Hong Kong with the Specific Use below: 
 
Car park  Areas  accessible  to  vehicles  not  exceeding 
30,000 kg gross weight 
Warehouse  General  storage  with  storage  height  in 
accordance with clear headroom 
Office  Offices for general use 
Roof  Inaccessible roof 
 
Wind Loads 
 
11.  The wind loads shall be in accordance with the Code of Practice on Wind Effects 
in Hong Kong 2004. 
 
Site Conditions 
 
12.  Ground conditions are: 
 
+6mPD to +5mPD  Loose fill, SPT N‐value < 10. 
 
+5mPD to ‐14mPD  Medium dense sand with SPT N‐value from 20 to 50. 
 
‐14mPD and below  Strong  completely  decomposed  granite  in  the  form  of 
dense  to  very  dense  coarse  sand,  SPT  N‐value  ranges 
from 100 to 150. 
 
Groundwater is encountered at 5m below ground level. 
 
Omit from Consideration 
 
13. Detailed layout and design of the structure inside the lift shaft and staircase core. 

 
14
 

Section A 
 
a.  Prepare a design appraisal with appropriate sketches indicating two distinct and 
viable  solutions  for  the  proposed  extension  including  two  viable  foundation 
schemes. Indicate clearly the functional framing, load transfer, serviceability and 
stability  aspects  of  each  scheme  to  meet  all  client’s  requirements.  Identify  the 
solution you recommend and give reasons for your choice. 
 (30 marks) 
 
b.  Explain how the structure will resist wind load including detailed description of 
the structural wind loads and design assumption. Prepare a detailed wind load 
calculation and stability checking for the proposed extension. 
(10 marks) 
 
Section B 
 
For the solution recommended in Section A: 
 
c.  Prepare  sufficient  design  calculations  to  establish  the  form  and  size  of  all  the 
principal structural elements including the foundation. 
 (20 marks) 
 
d.  Prepare framing plans, sections and elevations to show the dimensions, layout 
and  disposition  of  the  structural  elements  and  critical  details  including  fire 
protection for estimating purposes. 
 (18 marks) 
 
e.  Prepare  footbridge  details  including  (1)  connection  to  existing  logistic  centre, 
and (2) glass balustrade. 
 (6 marks) 
 
f.  Prepare  a  detailed  method  statement  covering  essential  activities  for  the  safe 
construction  of  the  new  building  including  the  formation  of  opening  at  the 
existing curtain wall of logistic centre for footbridge connection. 
(8 marks) 
 
g.  Prepare  a  detailed  construction  program  covering  essential  activities  from 
commencement of foundation to completion of structural works. 
(8 marks) 

 
15
EXISTING
DRIVEWAY

WAREHOUSE A

EXISTING NEW CARPARK


LOGISTIC EXTENSION
CENTRE BUILDING

DRIVEWAY
WAREHOUSE B

BLOCK PLAN

CARPARK

EXISTING WAREHOUSE c
B
LOGISTIC FOOTBRIDGE SITE B.L.
CENTRE
OFFICE

WAREHOUSE

GLASS BALUSTRADE DRIVEWAY

SECTION A G/F PLAN

Figure Q3
16
OFFICE

FOOTBRIDGE

1/F PLAN

Figure Q3
17
ROOF

R/F PLAN

Figure Q3
18
 

Question 4  Office/Hotel Development 
 
 
Client’s Requirements 
 
The following client’s requirements must be met: 
 
1.  A 40‐storey Office/Hotel development is to be built at Central, HK.  See figure Q4. 
 
2.  No foundation can be built within the 3m MTR protection zone. 
 
3.  No vertical structural element can be placed within the “Column Free Zone” as 
indicated on plan. 
 
4.  All vertical structural elements, if any, must be affixed to the partition wall inside 
the hotel room/s.  
 
5.  Minimum column spacing (centre to centre) at office floors is to be 10m. 
 
6.  250mm curtain wall along the perimeter of the building is to be allowed. 
 
7.  No part of the structure, including foundations, can be built outside the building 
line. 
 
8.  Minimum  requirements  on  clear  headroom  (clear  height  of  all  structures, 
finishes and building services) are as follows: 
 
Floor  Usage  Min. Clear Headroom (m)  Finishes & E/M Zone (m) 
Basement     Car park  3.0  0.5 
G/F  Main Entrance  4.5  0.5 
1/F to 20/F  Office  3.0  0.5 
21/F  Refuge floor  3.0  0.5 
22 to 40/F  Hotel  3.0  0.5 
 
9.  A minimum 2‐hour fire resistance rating is required for all structural elements. 
 
 
Imposed Loads 
 
10.  The  imposed  loads  shall  be  in  accordance  with  the  latest  version  of  the  Hong 
Kong Code of Practice for Dead and Imposed Loads. 

 
19
 

Wind Loads 
 
11.  The wind loads shall be in accordance with the Code of Practice on Wind Effects 
in Hong Kong 2004. 
 
 
Site Conditions 
 
12.  The site is located at Central, HK. 
 
13.  Ground conditions are: 
 
Ground level – 10m  Fill, SPT N‐value = 10. 
 
10 m – 30 m  Marine Deposit, SPT N‐value = 4. 
 
30 m – 40 m  Alluvium, SPT N‐value = 15. 
 
40 m – 50 m  CDG with SPT N‐value varies from 30 to 200. 
 
Grade III rock with total core recovery more than 85% of the grade is found at 
50m below ground level. 
 
Groundwater is encountered at 3m below ground level. 
 
 
Omit from Consideration 
 
14.  Detailed layout and design of car park. 
 
 
 
 
 
 
 
 
 
 
 
 

 
20
 

Section A 
 
a.  Prepare a design appraisal with appropriate sketches indicating two distinct and 
viable  solutions  for  the  proposed  Office/Hotel  including  two  viable  foundation 
schemes, with due consideration of the existing MTR tunnel. Indicate clearly the 
functional framing, load transfer and stability aspects of each scheme to meet all 
client’s requirements. Identify the solution you recommend and give reasons for 
your choice. 
(30 marks) 
 
b.  Explain how the structure will resist wind load including detailed description of 
the  structural  wind  loads  and  design  assumption.  Prepare  a  detailed  stability 
checking  of  the  structure  with  wind  load  calculation  including  estimation  of 
building deflection to meet statutory requirement for the proposed Office/Hotel. 
(10 marks) 
 
 
Section B 
 
For the solution recommended in Section A: 
 
c.  Prepare  sufficient  design  calculations  to  establish  the  form  and  size  of  all  the 
principal structural elements including the foundation. 
(20 marks) 
 
d.  Prepare framing plans, sections and elevations to show the dimensions, layout 
and  disposition  of  the  structural  elements  and  critical  details  for  estimating 
purposes. 
(20 marks) 
 
e.  Prepare  a  detailed  method  statement  covering  essential  activities  for  the  safe 
construction  of  the  Office/Hotel  including  foundation  works,  with  due 
consideration of the existing MTR tunnel. 
(10 marks) 
 
f.  Prepare  a  detailed  construction  program  covering  essential  activities  from 
commencement of foundation to completion of structural works. 
(10 marks) 
 

 
21
+5mPD

22
Figure Q4
 

Question 5  Bridge over Channel 
 
 
Client’s Requirements 
 
The following client’s requirements must be met: 
 
1.  A  Road  Bridge  carrying  a  dual  carriageway  and  footpath  is  to  be  built  over  an 
existing  channel  with  footpaths  and  utilities  zone  at  the  channel  bank.    See 
figure Q5. 
 
2.  No temporary and permanent structures are to be placed within the channel as 
shown on Section A‐A in figure Q5. The high water level of the channel is to be 
+4.5mPD at wet season (April to Oct). 
 
3.  The footpaths at the top of channel need to be kept at all times and the utilities 
zone needs to be protected and maintained throughout the construction. 
 
4.  The  design  of  the  structure  should  be  kept  to  a  minimum  height  with  a 
maximum gradient of 1 in 12 due to environmental reason. 
 
5.  Minimum  requirements  on  clear  headroom  over  footpaths,  utilities  and 
maintenance zone are as follows: 
 
Location      Min. Clear Headroom (m)   
Footpaths      3.5m 
Utilities and maintenance zone    4.5m 
Height of bridge soffit at abutment    2.0m 
 
6.  The construction is planned to complete in 2 years and to be started in January 
to avoid the wet season. Incentives are planned for shortening the programme 
of construction to speed up the works. 
 
 
Design Requirements 
 
7.  The  structural  design  shall  be  in  accordance  with  the  latest  version  of  the 
Structures Design Manual for Highways and Railways published by the Highways 
Department of the HKSAR Government. 
 
 

 
23
 

Imposed Loads 
 
8.  The imposed loads and highway loadings shall be in accordance with the latest 
version of the Structures Design Manual for Highways and Railways. 
 
 
Wind Loads 
 
9.  The wind loads shall be in accordance with requirements in the latest version of 
the Structures Design Manual for Highways and Railways. 
 
 
Site Conditions 
 
10.  The site is located at rural open area with Degree 3 of exposure to wind. 
 
11.  Ground conditions are: 
 
Ground level – 4m  Fill, SPT N‐value = 0 – 5. 
 
4m – 8m  Medium dense soil, SPT N‐value = 10 – 30. 
 
8m – 15m  Very dense soil, SPT N‐value >50. 
 
15m and below  Moderately  decomposed,  moderately  strong  to 
moderately weak rock of material weathering grade III or 
better, with TCR > 50%. 
 
Groundwater is encountered at 3.5m below ground level. 
 
 
Omit from Consideration 
 
12.  Design calculations for approach ramp and containment parapet. 
 
13.  Detailed layout and design of approach ramp. 
 
 
 
 
 

 
24
 

Section A 
 
a.  Prepare a design appraisal with appropriate sketches indicating two distinct and 
viable  solutions  for  the  proposed  road  bridge  including  two  viable  foundation 
schemes.  Indicate  clearly  the  functional  framing,  load  transfer  and  stability 
aspects of each scheme to meet all client’s requirements. Identify the solution 
you recommend and give reasons for your choice. 
(30 marks) 
 
b.  Explain how the structure will resist wind load including detailed description of 
the structural wind loads and design assumption. Prepare a detailed wind load 
calculation for the proposed road bridge.  
(10 marks) 
 
 
Section B 
 
For the solution recommended in Section A: 
 
c.  Prepare  sufficient  design  calculations  to  establish  the  form  and  size  of  all  the 
principal structural elements including the foundation. 
(20 marks) 
 
d.  Prepare framing plans, sections and elevations to show the dimensions, layout 
and  disposition  of  the  structural  elements  and  critical  details  for  estimating 
purposes. 
 (20 marks) 
 
e.  Prepare  a  detailed  method  statement  covering  essential  activities  for  the  safe 
construction of the road bridge including foundation works. 
 (10 marks) 
 
f.  Prepare  a  detailed  construction  program  covering  essential  activities  from 
commencement of foundation to completion of structural works. 
(10 marks) 
 
 
   

 
25
 

  PLAN
 

+
+

 
  SECTION A-A

SECTION B-B

Figure Q5
 
End of Paper

You might also like