Rocsupport Project Information: Carranza-Torres Solution Probabilistic Monte-Carlo 1000

The document summarizes the results of a probabilistic analysis of tunnel support using the Carranza-Torres solution method. With support installed, the radius of the plastic zone was 8.91 m, wall displacement was 61.95 mm, and tunnel convergence was 1.24%. Without support, the plastic zone radius was 14.84 m, wall displacement was 196.32 mm, and convergence was 3.93%.

Uploaded by

Ajay Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views2 pages

Rocsupport Project Information: Carranza-Torres Solution Probabilistic Monte-Carlo 1000

The document summarizes the results of a probabilistic analysis of tunnel support using the Carranza-Torres solution method. With support installed, the radius of the plastic zone was 8.91 m, wall displacement was 61.95 mm, and tunnel convergence was 1.24%. Without support, the plastic zone radius was 14.84 m, wall displacement was 196.32 mm, and convergence was 3.93%.

Uploaded by

Ajay Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

RocSupport Project Information

Project Settings:

Project Title: T-1


Solution Method: Carranza-Torres solution
Analysis Type: Probabilistic
Sampling Method: Monte-Carlo
Number of Samples: 1000

Analysis Results:

Data has no distributions. Analysis is effectively deterministic.

Probability of Failure : 0 %
Factor of Safety : 5.9
Mobilized Support Pressure : 0.28 MPa

With support installed :


Radius of Plastic Zone rp : 8.91 m
Wall Displacement up : 61.95 mm
Tunnel Convergence : 1.24 %

With no support installed :


Radius of Plastic Zone rp : 14.84 m
Wall Displacement up : 196.32 mm
Tunnel Convergence : 3.93 %

Deformation at the tunnel face :


Wall displacement : 60.43 mm
Tunnel Convergence : 1.21 %

Critical Pressure pcr : 1.23 MPa

Tunnel and Rock Parameters:

Tunnel Radius : 5 m
Distribution = None
In-Situ Stress po : 2.025 MPa
Distribution = None

Young's Modulus E : 299 MPa


Distribution = None
Poisson Ratio  : 0.3
Distribution = None

Dilation Angle  : 0 o
Distribution = None
Compressive Strength of Intact Rock ci : 4 MPa
Distribution = None

Peak Strength Parameters Defined As : GSI, mi, D

Geological Strength Index : 17


Distribution = None
Rock Mass Constant mi : 12
Distribution = None
Disturbance Factor : 0
Distribution = None

Using residual strength parameters


Residual Hoek-Brown mb parameter : 1
Distribution = None
Residual Hoek-Brown s parameter : 0.0001
Distribution = None
Residual Hoek-Brown a parameter : 0.5
Distribution = None

Support Parameters:

Total combined :
Maximum support pressure : 1.655 MPa
Maximum average strain : 0.18 %
Installed at distance from tunnel face : 0 m
Initial Tunnel Convergence : 1.21 %
Initial Wall Displacement : 60.43 mm

Steelset :
Type : I section rib
Properties : Flange width = 152 mm, section depth = 203, weight = 52 kg/m
Maximum support pressure : 0.519 MPa
Maximum average strain : 0.26 %
Steelset out-of-plane spacing : 1 m

Shotcrete :
Properties : Thickness = 150 mm, age = 28 days, UCS = 35 MPa
Maximum support pressure : 1.136 MPa
Maximum average strain : 0.1 %