PROVIDING AND LAYING SEWERAGE NETWORK INCLUDING

HOUSE SERVICE CONNECTION AND CONSTRUCTION OF


PROJECT SEWAGE OF SEWAGE PUMPING STATION IN ZONE 5,6 AND 7
OF TIRUPPUR CITY MUNICIPAL CORPORATION - PACKAGE - 1

DESIGN. CHECK., APPRD., Rev


DOC.NO EPE/UGSS-TPR/MPS/Z-V/STR/PP ROOM/002
VJ VJ MGK 0
TITLE STRUCTURAL DESIGN CALCULATION OF PUMP ROOM

Design of Isolated Footing


2000
Reference Node 6 9
Footing Type - 1
1800
Footing Number
1600
Design Parameters
25 N/mm2 1400
Grade of Concrete fck=
Grade of Steel fy= 500 N/mm2 1200

50 mm 1000

Z Axis
Clear Cover to main reinforcement =
Unit weight of Concrete = 25 kN/m3 800

Unit weight of Soil = 17 kN/m3 600

Net Safe bearing capacity of the soil SBC = 150 kN/m2 400

Gross Safe bearing capacity of the Soil GSBC= 189.1 kN/m2 200
X Axis
Depth of Foundation = 2.3 m 0
0 500 1000 1500 2000
Difference in Level b/w FGL & NGL = 0.23 m
Surcharge acting on the footing = kN/m2
Section Properties
Lx Lz DOF Area (Af) Zxx Zzz
Footing 1.75 1.75 0.45 3.0625 0.9 0.9
Cx Cz DOC Area (Ac)
Column 0.3 0.3 1.85 0.09
Load Calculations VALID DESIGN

Footing Weight (L*B*D) = 34.45313 kN SBC SAFE


Weight of Soil = 93.486 kN Ast - X SAFE
Soil Filling Weight = 0 kN Ast - Z SAFE
Additional Load = 0 kN/m2 1-Way along X SAFE
Surcharge = 0 kN/m2 1-Way along Z SAFE
Total Surcharge acting = 0 kN/m2 2-Way Shear SAFE
Surcharge Load = 0 kN
Total Weight W= 93.49 kN
Staad Pro Input for Serviceability
Fy + Addl
Fx Fy FZ Mx My Mz
S.No Node No L/C Weight
kN kN kN kN m kN m kN m kN
28 100 DL+LL 320.562
1 20.403 227.072 43.335 17.41 -0.097 -9.032
101 DL+EQ X 296.251
11.869 202.761 44.298 17.729 -0.096 4.081
102 DL+EQ Z 298.284
20.466 204.794 31.466 -8.292 0.387 -9.05
103 DL+0.8LL+0.8EQ X 304.164
13.528 210.674 43.528 17.474 -0.097 1.476
104 DL+0.8LL+0.8EQZ 305.791
20.406 212.301 33.262 -3.343 0.289 -9.029
31 100 DL+LL 320.562
2 20.403 227.072 -43.335 -17.41 0.097 -9.032
101 DL+EQ X 296.251
11.869 202.761 -44.298 -17.729 0.096 4.081
102 DL+EQ Z 332.669
20.498 239.179 -57.13 -43.75 0.577 -9.072
103 DL+0.8LL+0.8EQ X 304.164
13.528 210.674 -43.528 -17.474 0.097 1.476
104 DL+0.8LL+0.8EQZ 333.298
20.431 239.808 -53.793 -38.291 0.482 -9.047

Check for Safe Bearing Capacity 1


PROVIDING AND LAYING SEWERAGE NETWORK INCLUDING
HOUSE SERVICE CONNECTION AND CONSTRUCTION OF
PROJECT SEWAGE OF SEWAGE PUMPING STATION IN ZONE 5,6 AND 7
OF TIRUPPUR CITY MUNICIPAL CORPORATION - PACKAGE - 1

DESIGN. CHECK., APPRD., Rev


DOC.NO EPE/UGSS-TPR/MPS/Z-V/STR/PP ROOM/002
VJ VJ MGK 0
TITLE STRUCTURAL DESIGN CALCULATION OF PUMP ROOM

I II III IV Max P Min P Check for


S.No Node No L/C
kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 SBC

1 28 100 DL+LL 113.99 134.06 95.37 75.3 134.06 75.3 SAFE

101 DL+EQ X 120.97 111.9 72.51 81.58 120.97 72.51 SAFE

102 DL+EQ Z 78.13 98.25 116.67 96.56 116.67 78.13 SAFE

103 DL+0.8LL+0.8EQ X 120.38 117.1 78.27 81.55 120.38 78.27 SAFE

104 DL+0.8LL+0.8EQZ 86.11 106.17 113.6 93.54 113.6 86.11 SAFE

2 31 100 DL+LL 75.3 95.37 134.06 113.99 134.06 75.3 SAFE

101 DL+EQ X 81.58 72.51 111.9 120.97 120.97 72.51 SAFE

102 DL+EQ Z 49.94 70.1 167.32 147.16 167.32 49.94 SAFE

103 DL+0.8LL+0.8EQ X 81.55 78.27 117.1 120.38 120.38 78.27 SAFE

104 DL+0.8LL+0.8EQZ 56.24 76.34 161.43 141.33 161.43 56.24 SAFE


Pressure along "X" & "Z" direction

Max Max Min


Avg P along Avg P Avg P Avg P Min Avg., Download
S.No Node L/C Avg.,P Avg.,P Avg.,P
X along X along Z along Z P along X Pressure
along X along Z along Z
1 28 100 94.645 114.715 124.025 85.335 114.715 94.645 124.025 85.335 30.53
101 101.275 92.205 116.435 77.045 101.275 92.205 116.435 77.045 30.53
102 87.345 107.46 88.19 106.615 107.46 87.345 106.615 88.19 30.53
103 100.965 97.685 118.74 79.91 100.965 97.685 118.74 79.91 30.53
104 89.825 109.885 96.14 103.57 109.885 89.825 103.57 96.14 30.53
2 31 100 94.645 114.715 85.335 124.025 114.715 94.645 124.025 85.335 30.53
101 101.275 92.205 77.045 116.435 101.275 92.205 116.435 77.045 30.53
102 98.55 118.71 60.02 157.24 118.71 98.55 157.24 60.02 30.53
103 100.965 97.685 79.91 118.74 100.965 97.685 118.74 79.91 30.53
104 98.785 118.885 66.29 151.38 118.885 98.785 151.38 66.29 30.53
Maximum Soil Pressure 118.885 87.345 157.24 60.02
Pressure consideration for Two Way Shear check 157.24 kN/m2
Calculation of Moment & Shear
Projection Projection P @ face of P @ face M along M along Load Mu,d Mu,d along SF @ SF @
L/C
along X along Z col-x of col-z X Z Factor along X Z d"x" d"z"
100 0.725 0.725 106.41 108 12.76 15.86 1.5 19.14 23.79 57.34 62.07
101 0.725 0.725 97.52 100.12 7.27 12.32 1.5 10.905 18.48 47.63 55.35
102 0.725 0.725 99.13 98.99 9.42 9.14 1.5 14.13 13.71 51.02 50.59
103 0.725 0.725 99.61 102.66 7.5 13.42 1.5 11.25 20.13 48.41 57.45
104 0.725 0.725 101.58 100.5 10.54 8.43 1.5 15.81 12.645 53.14 49.93
100 0.725 0.725 106.41 108 12.76 15.86 1.5 19.14 23.79 57.34 62.07
101 0.725 0.725 97.52 100.12 7.27 12.32 1.5 10.905 18.48 47.63 55.35
102 0.725 0.725 110.36 116.97 14.59 27.41 1.5 21.885 41.115 60.79 80.4
103 0.725 0.725 99.61 102.66 7.5 13.42 1.5 11.25 20.13 48.41 57.45
104 0.725 0.725 110.56 116.13 14.67 25.49 1.5 22.005 38.235 60.95 77.49

2
Design of Bottom Reinforcements
PROVIDING AND LAYING SEWERAGE NETWORK INCLUDING
HOUSE SERVICE CONNECTION AND CONSTRUCTION OF
PROJECT SEWAGE OF SEWAGE PUMPING STATION IN ZONE 5,6 AND 7
OF TIRUPPUR CITY MUNICIPAL CORPORATION - PACKAGE - 1

DESIGN. CHECK., APPRD., Rev


DOC.NO EPE/UGSS-TPR/MPS/Z-V/STR/PP ROOM/002
VJ VJ MGK 0
TITLE STRUCTURAL DESIGN CALCULATION OF PUMP ROOM

Dia of bars available


10 12 16 20 25 32 40 50
ALONG X-DIRECTION ALONG Z-DIRECTION
Design Moment = 22.005 kN m Design moment = 41.115 kN m
Projection = 0.725 m Projection = 0.725 m
Dia of bar = Y-12 mm Dia of bar = Y-10 mm
Effective "d" provided = 394 mm Effective "d" provided = 395 mm
Mu/bd2 =(22.005x10^6)/(1750x394^2) Mu/bd2 =(41.115x10^6)/(1750x395^2)
= 0.09 = 0.12
Pt req., =(25/(2x500))x(1-sqrt(4.6x0.09/25)))*100 Pt req., =(25/(2x500))x(1-sqrt(4.6x0.12/25)))*100
= 0.03 = 0.03
Req.,Ast =0.03%x1.75x(394) Req.,Ast =0.03%x1.75x(395)
= 108 mm2 = 207.375 mm2
Min Ast =0.12%x1750x(394) Min Ast =0.12%x1750x(395)
= 827.4 mm2 = 829.5 mm2
Governing Ast = 827.4 mm2 Governing Ast = 829.5 mm2
Provide Y-12 @-150 c/c Provide Y-10 @-150 c/c
Provided Ast Provided Ast
=((PI()X12^2)/4)x((1750/150)+1 =((PI()X10^2)/4)x((1750/150)+1

1431.84 994.3333
%Ast,pro 0.21 %Ast,pro 0.15
SAFE SAFE
Check for one way Shear
The critical Section for One-way shear is at a distance "d" from the face of the column.
Design Shear Force = 60.95 kN Design Shear Force = 80.4 kN
Actual Shear Stress = 0.16 N/mm2 Actual Shear Stress = 0.21 N/mm2
Area of Steel Provided = 1431.84 mm2 Area of Steel provided = 994.33333 mm2
% of Steel Provided = 0.21 % % of Steel Provided = 0.15 %
Beta along "X" = 19.36 Beta along "Z" = 13.83
Allowable Shear Stress = 0.32 N/mm2 Allowable Shear Stress = 0.38 N/mm2

SAFE SAFE

Check for Two Way Shear


The critical Section for two way shear is along the perphery of the square at a distance "d/2" from the face of the
Column.
Perimeter of periphery = 2.778
Factored Shear Force = 405.7059 kN
Nominal Shear Stress = 0.370666 N/mm2
Permissible shear Stress in concrete= ζc
ζc '= Ks.ζc Ks=(0.5+l/b) should not be greater than 1 ,otherwise Ks=1
Therefore,Ks= 1
ζc = 0.25*(fck)^1/2
= 1.25 N/mm2
SAFE
3
PROVIDING AND LAYING SEWERAGE NETWORK INCLUDING
HOUSE SERVICE CONNECTION AND CONSTRUCTION OF
PROJECT SEWAGE OF SEWAGE PUMPING STATION IN ZONE 5,6 AND 7
OF TIRUPPUR CITY MUNICIPAL CORPORATION - PACKAGE - 1

DESIGN. CHECK., APPRD., Rev


DOC.NO EPE/UGSS-TPR/MPS/Z-V/STR/PP ROOM/002
VJ VJ MGK 0
TITLE
STRUCTURAL DESIGN CALCULATION OF PUMP ROOM

Design of Isolated Footing


2000
Reference Node 6 9
Footing Type - 1
1800
Footing Number
1600
Design Parameters
25 N/mm2 1400
Grade of Concrete fck=
Grade of Steel fy= 500 N/mm2 1200

50 mm 1000

Z Axis
Clear Cover to main reinforcement =
Unit weight of Concrete = 25 kN/m3 800

Unit weight of Soil = 17 kN/m3 600

Net Safe bearing capacity of the soil SBC = 150 kN/m2 400

Gross Safe bearing capacity of the Soil GSBC= 189.1 kN/m2 200
X Axis
Depth of Foundation = 2.3 m 0
0 500 1000 1500 2000
Difference in Level b/w FGL & NGL = 0.23 m
Surcharge acting on the footing = kN/m2
Section Properties
Lx Lz DOF Area (Af) Zxx Zzz
Footing 1.75 1.75 0.45 3.0625 0.9 0.9
Cx Cz DOC Area (Ac)
Column 0.3 0.3 1.85 0.09
Load Calculations VALID DESIGN

Footing Weight (L*B*D) = 34.45313 kN SBC SAFE


Weight of Soil = 93.486 kN Ast - X SAFE
Soil Filling Weight = 0 kN Ast - Z SAFE
Additional Load = 0 kN/m2 1-Way along X SAFE
Surcharge = 0 kN/m2 1-Way along Z SAFE
Total Surcharge acting = 0 kN/m2 2-Way Shear SAFE
Surcharge Load = 0 kN
Total Weight W= 93.49 kN
Staad Pro Input for Serviceability
Fy + Addl
Fx Fy FZ Mx My Mz
S.No Node No L/C Weight
kN kN kN kN m kN m kN m kN
29 100 DL+LL 388.116
1 0 294.626 -10.089 -2.914 0 0
101 DL+EQ X 376.723
-18.549 283.233 -8.4 -2.358 0.001 17.752
102 DL+EQ Z 355.22
0 261.73 -24.543 -35.057 0 0
103 DL+0.8LL+0.8EQ X 385.838
-14.839 292.348 -9.751 -2.803 0.001 14.201
104 DL+0.8LL+0.8EQZ 368.635
0 275.145 -22.665 -28.962 0 0
32 100 DL+LL 388.116
2 0 294.626 10.089 2.914 0 0
101 DL+EQ X 376.723
-18.549 283.233 8.4 2.358 -0.001 17.752
102 DL+EQ Z 398.226
0 304.736 -7.742 -30.341 0 0
103 DL+0.8LL+0.8EQ X 385.838
-14.839 292.348 9.751 2.803 -0.001 14.201
104 DL+0.8LL+0.8EQZ 403.04
0 309.55 -3.163 -23.356 0 0

Check for Safe Bearing Capacity 4


PROVIDING AND LAYING SEWERAGE NETWORK INCLUDING
HOUSE SERVICE CONNECTION AND CONSTRUCTION OF
PROJECT SEWAGE OF SEWAGE PUMPING STATION IN ZONE 5,6 AND 7
OF TIRUPPUR CITY MUNICIPAL CORPORATION - PACKAGE - 1

DESIGN. CHECK., APPRD., Rev


DOC.NO EPE/UGSS-TPR/MPS/Z-V/STR/PP ROOM/002
VJ VJ MGK 0
TITLE
STRUCTURAL DESIGN CALCULATION OF PUMP ROOM

I II III IV Max P Min P Check for


S.No Node No L/C
kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 SBC

1 29 100 DL+LL 123.5 123.5 129.97 129.97 129.97 123.5 SAFE

101 DL+EQ X 140.12 100.67 105.91 145.36 145.36 100.67 SAFE

102 DL+EQ Z 77.04 77.04 154.95 154.95 154.95 77.04 SAFE

103 DL+0.8LL+0.8EQ X 138.66 107.1 113.33 144.89 144.89 107.1 SAFE

104 DL+0.8LL+0.8EQZ 88.2 88.2 152.56 152.56 152.56 88.2 SAFE

2 32 100 DL+LL 129.97 129.97 123.5 123.5 129.97 123.5 SAFE

101 DL+EQ X 145.36 105.91 100.67 140.12 145.36 100.67 SAFE

102 DL+EQ Z 96.33 96.33 163.75 163.75 163.75 96.33 SAFE

103 DL+0.8LL+0.8EQ X 144.89 113.33 107.1 138.66 144.89 107.1 SAFE

104 DL+0.8LL+0.8EQZ 105.66 105.66 157.56 157.56 157.56 105.66 SAFE


Pressure along "X" & "Z" direction

Max Max Min


Avg P along Avg P Avg P Avg P Min Avg., Download
S.No Node L/C Avg.,P Avg.,P Avg.,P
X along X along Z along Z P along X Pressure
along X along Z along Z
1 29 100 126.735 126.735 123.5 129.97 126.735 126.735 129.97 123.5 30.53
101 142.74 103.29 120.395 125.635 142.74 103.29 125.635 120.395 30.53
102 115.995 115.995 77.04 154.95 115.995 115.995 154.95 77.04 30.53
103 141.775 110.215 122.88 129.11 141.775 110.215 129.11 122.88 30.53
104 120.38 120.38 88.2 152.56 120.38 120.38 152.56 88.2 30.53
2 32 100 126.735 126.735 129.97 123.5 126.735 126.735 129.97 123.5 30.53
101 142.74 103.29 125.635 120.395 142.74 103.29 125.635 120.395 30.53
102 130.04 130.04 96.33 163.75 130.04 130.04 163.75 96.33 30.53
103 141.775 110.215 129.11 122.88 141.775 110.215 129.11 122.88 30.53
104 131.61 131.61 105.66 157.56 131.61 131.61 157.56 105.66 30.53
Maximum Soil Pressure 142.74 103.29 163.75 77.04
Pressure consideration for Two Way Shear check 163.75 kN/m2
Calculation of Moment & Shear
Projection Projection P @ face of P @ face M along M along Load Mu,d Mu,d along SF @ SF @
L/C
along X along Z col-x of col-z X Z Factor along X Z d"x" d"z"
100 0.725 0.725 126.74 127.29 19.56 20.64 1.5 29.34 30.96 71.06 72.7
101 0.725 0.725 126.4 123.47 24.41 18.72 1.5 36.615 28.08 77.84 69.16
102 0.725 0.725 116 122.68 14.62 27.59 1.5 21.93 41.385 61.75 81.52
103 0.725 0.725 128.71 126.53 24.47 20.26 1.5 36.705 30.39 78.42 71.99
104 0.725 0.725 120.38 125.9 16.64 27.35 1.5 24.96 41.025 65.55 81.88
100 0.725 0.725 126.74 127.29 19.56 20.64 1.5 29.34 30.96 71.06 72.7
101 0.725 0.725 126.4 123.47 24.41 18.72 1.5 36.615 28.08 77.84 69.16
102 0.725 0.725 130.04 135.82 21.08 32.3 1.5 31.62 48.45 73.92 91.02
103 0.725 0.725 128.71 126.53 24.47 20.26 1.5 36.705 30.39 78.42 71.99
104 0.725 0.725 131.61 136.06 21.8 30.44 1.5 32.7 45.66 75.28 88.44

5
Design of Bottom Reinforcements
PROVIDING AND LAYING SEWERAGE NETWORK INCLUDING
HOUSE SERVICE CONNECTION AND CONSTRUCTION OF
PROJECT SEWAGE OF SEWAGE PUMPING STATION IN ZONE 5,6 AND 7
OF TIRUPPUR CITY MUNICIPAL CORPORATION - PACKAGE - 1

DESIGN. CHECK., APPRD., Rev


DOC.NO EPE/UGSS-TPR/MPS/Z-V/STR/PP ROOM/002
VJ VJ MGK 0
TITLE
STRUCTURAL DESIGN CALCULATION OF PUMP ROOM

Dia of bars available


10 12 16 20 25 32 40 50
ALONG X-DIRECTION ALONG Z-DIRECTION
Design Moment = 36.705 kN m Design moment = 48.45 kN m
Projection = 0.725 m Projection = 0.725 m
Dia of bar = Y-10 mm Dia of bar = Y-10 mm
Effective "d" provided = 395 mm Effective "d" provided = 395 mm
Mu/bd2 =(36.705x10^6)/(1750x395^2) Mu/bd2 =(48.45x10^6)/(1750x395^2)
= 0.14 = 0.14
Pt req., =(25/(2x500))x(1-sqrt(4.6x0.14/25)))*100 Pt req., =(25/(2x500))x(1-sqrt(4.6x0.14/25)))*100
= 0.04 = 0.04
Req.,Ast =0.04%x1.75x(395) Req.,Ast =0.04%x1.75x(395)
= 144 mm2 = 276.5 mm2
Min Ast =0.12%x1750x(395) Min Ast =0.12%x1750x(395)
= 829.5 mm2 = 829.5 mm2
Governing Ast = 829.5 mm2 Governing Ast = 829.5 mm2
Provide Y-10 @-150 c/c Provide Y-10 @-150 c/c
Provided Ast Provided Ast
=((PI()X10^2)/4)x((1750/150)+1 =((PI()X10^2)/4)x((1750/150)+1

994.3333333 994.3333
%Ast,pro 0.15 %Ast,pro 0.15
SAFE SAFE
Check for one way Shear
The critical Section for One-way shear is at a distance "d" from the face of the column.
Design Shear Force = 78.42 kN Design Shear Force = 91.02 kN
Actual Shear Stress = 0.2 N/mm2 Actual Shear Stress = 0.24 N/mm2
Area of Steel Provided = 994.3333 mm2 Area of Steel provided = 994.33333 mm2
% of Steel Provided = 0.15 % % of Steel Provided = 0.15 %
Beta along "X" = 19.36 Beta along "Z" = 19.36
Allowable Shear Stress = 0.32 N/mm2 Allowable Shear Stress = 0.32 N/mm2

SAFE SAFE

Check for Two Way Shear


The critical Section for two way shear is along the perphery of the square at a distance "d/2" from the face of the
Column.
Perimeter of periphery = 2.78
Factored Shear Force = 422.389 kN
Nominal Shear Stress = 0.384654 N/mm2
Permissible shear Stress in concrete= ζc
ζc '= Ks.ζc Ks=(0.5+l/b) should not be greater than 1 ,otherwise Ks=1
Therefore,Ks= 1
ζc = 0.25*(fck)^1/2
= 1.25 N/mm2
SAFE
6
PROVIDING AND LAYING SEWERAGE NETWORK INCLUDING
HOUSE SERVICE CONNECTION AND CONSTRUCTION OF
PROJECT SEWAGE OF SEWAGE PUMPING STATION IN ZONE 5,6 AND 7
OF TIRUPPUR CITY MUNICIPAL CORPORATION - PACKAGE - 1

DESIGN. CHECK., APPRD., Rev


DOC.NO EPE/UGSS-TPR/MPS/Z-V/STR/PP ROOM/002
VJ VJ MGK 0
TITLE
STRUCTURAL DESIGN CALCULATION OF PUMP ROOM

Design of Isolated Footing


2000
Reference Node 6 9
Footing Type - 1
1800
Footing Number
1600
Design Parameters
25 N/mm2 1400
Grade of Concrete fck=
Grade of Steel fy= 500 N/mm2 1200

50 mm 1000

Z Axis
Clear Cover to main reinforcement =
Unit weight of Concrete = 25 kN/m3 800

Unit weight of Soil = 17 kN/m3 600

Net Safe bearing capacity of the soil SBC = 150 kN/m2 400

Gross Safe bearing capacity of the Soil GSBC= 189.1 kN/m2 200
X Axis
Depth of Foundation = 2.3 m 0
0 500 1000 1500 2000
Difference in Level b/w FGL & NGL = 0.23 m
Surcharge acting on the footing = kN/m2
Section Properties
Lx Lz DOF Area (Af) Zxx Zzz
Footing 1.75 1.75 0.45 3.0625 0.9 0.9
Cx Cz DOC Area (Ac)
Column 0.3 0.3 1.85 0.09
Load Calculations VALID DESIGN

Footing Weight (L*B*D) = 34.45313 kN SBC SAFE


Weight of Soil = 93.486 kN Ast - X SAFE
Soil Filling Weight = 0 kN Ast - Z SAFE
Additional Load = 0 kN/m2 1-Way along X SAFE
Surcharge = 0 kN/m2 1-Way along Z SAFE
Total Surcharge acting = 0 kN/m2 2-Way Shear SAFE
Surcharge Load = 0 kN
Total Weight W= 93.49 kN
Staad Pro Input for Serviceability
Fy + Addl
Fx Fy FZ Mx My Mz
S.No Node No L/C Weight
kN kN kN kN m kN m kN m kN
30 100 DL+LL 320.562
1 -20.403 227.072 43.335 17.41 0.097 9.032
101 DL+EQ X 334.702
-29.095 241.212 44.298 17.729 0.094 22.203
102 DL+EQ Z 298.284
-20.466 204.794 31.466 -8.292 -0.387 9.05
103 DL+0.8LL+0.8EQ X 334.925
-27.309 241.435 43.528 17.474 0.096 19.551
104 DL+0.8LL+0.8EQZ 305.791
-20.406 212.301 33.262 -3.343 -0.289 9.029
33 100 DL+LL 320.562
2 -20.403 227.072 -43.335 -17.41 -0.097 9.032
101 DL+EQ X 334.702
-29.095 241.212 -44.298 -17.729 -0.094 22.203
102 DL+EQ Z 332.669
-20.498 239.179 -57.13 -43.75 -0.577 9.072
103 DL+0.8LL+0.8EQ X 334.925
-27.309 241.435 -43.528 -17.474 -0.096 19.551
104 DL+0.8LL+0.8EQZ 333.298
-20.431 239.808 -53.793 -38.291 -0.482 9.047

Check for Safe Bearing Capacity 7


PROVIDING AND LAYING SEWERAGE NETWORK INCLUDING
HOUSE SERVICE CONNECTION AND CONSTRUCTION OF
PROJECT SEWAGE OF SEWAGE PUMPING STATION IN ZONE 5,6 AND 7
OF TIRUPPUR CITY MUNICIPAL CORPORATION - PACKAGE - 1

DESIGN. CHECK., APPRD., Rev


DOC.NO EPE/UGSS-TPR/MPS/Z-V/STR/PP ROOM/002
VJ VJ MGK 0
TITLE
STRUCTURAL DESIGN CALCULATION OF PUMP ROOM

I II III IV Max P Min P Check for


S.No Node No L/C
kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 SBC

1 30 100 DL+LL 134.06 113.99 75.3 95.37 134.06 75.3 SAFE

101 DL+EQ X 153.66 104.32 64.93 114.27 153.66 64.93 SAFE

102 DL+EQ Z 98.25 78.13 96.56 116.67 116.67 78.13 SAFE

103 DL+0.8LL+0.8EQ X 150.51 107.06 68.23 111.68 150.51 68.23 SAFE

104 DL+0.8LL+0.8EQZ 106.17 86.11 93.54 113.6 113.6 86.11 SAFE

2 33 100 DL+LL 95.37 75.3 113.99 134.06 134.06 75.3 SAFE

101 DL+EQ X 114.27 64.93 104.32 153.66 153.66 64.93 SAFE

102 DL+EQ Z 70.1 49.94 147.16 167.32 167.32 49.94 SAFE

103 DL+0.8LL+0.8EQ X 111.68 68.23 107.06 150.51 150.51 68.23 SAFE

104 DL+0.8LL+0.8EQZ 76.34 56.24 141.33 161.43 161.43 56.24 SAFE


Pressure along "X" & "Z" direction

Max Max Min


Avg P along Avg P Avg P Avg P Min Avg., Download
S.No Node L/C Avg.,P Avg.,P Avg.,P
X along X along Z along Z P along X Pressure
along X along Z along Z
1 30 100 114.715 94.645 124.025 85.335 114.715 94.645 124.025 85.335 30.53
101 133.965 84.625 128.99 89.6 133.965 84.625 128.99 89.6 30.53
102 107.46 87.345 88.19 106.615 107.46 87.345 106.615 88.19 30.53
103 131.095 87.645 128.785 89.955 131.095 87.645 128.785 89.955 30.53
104 109.885 89.825 96.14 103.57 109.885 89.825 103.57 96.14 30.53
2 33 100 114.715 94.645 85.335 124.025 114.715 94.645 124.025 85.335 30.53
101 133.965 84.625 89.6 128.99 133.965 84.625 128.99 89.6 30.53
102 118.71 98.55 60.02 157.24 118.71 98.55 157.24 60.02 30.53
103 131.095 87.645 89.955 128.785 131.095 87.645 128.785 89.955 30.53
104 118.885 98.785 66.29 151.38 118.885 98.785 151.38 66.29 30.53
Maximum Soil Pressure 133.965 84.625 157.24 60.02
Pressure consideration for Two Way Shear check 157.24 kN/m2
Calculation of Moment & Shear
Projection Projection P @ face of P @ face M along M along Load Mu,d Mu,d along SF @ SF @
L/C
along X along Z col-x of col-z X Z Factor along X Z d"x" d"z"
100 0.725 0.725 106.41 108 12.76 15.86 1.5 19.14 23.79 57.04 61.77
101 0.725 0.725 113.53 112.68 19.75 18.09 1.5 29.625 27.135 68.47 65.94
102 0.725 0.725 99.13 98.99 9.42 9.14 1.5 14.13 13.71 50.75 50.32
103 0.725 0.725 113.1 112.7 18.8 18.04 1.5 28.2 27.06 67.04 65.86
104 0.725 0.725 101.58 100.5 10.54 8.43 1.5 15.81 12.645 52.86 49.66
100 0.725 0.725 106.41 108 12.76 15.86 1.5 19.14 23.79 57.04 61.77
101 0.725 0.725 113.53 112.68 19.75 18.09 1.5 29.625 27.135 68.47 65.94
102 0.725 0.725 110.36 116.97 14.59 27.41 1.5 21.885 41.115 60.49 80.04
103 0.725 0.725 113.1 112.7 18.8 18.04 1.5 28.2 27.06 67.04 65.86
104 0.725 0.725 110.56 116.13 14.67 25.49 1.5 22.005 38.235 60.65 77.14

8
Design of Bottom Reinforcements
PROVIDING AND LAYING SEWERAGE NETWORK INCLUDING
HOUSE SERVICE CONNECTION AND CONSTRUCTION OF
PROJECT SEWAGE OF SEWAGE PUMPING STATION IN ZONE 5,6 AND 7
OF TIRUPPUR CITY MUNICIPAL CORPORATION - PACKAGE - 1

DESIGN. CHECK., APPRD., Rev


DOC.NO EPE/UGSS-TPR/MPS/Z-V/STR/PP ROOM/002
VJ VJ MGK 0
TITLE
STRUCTURAL DESIGN CALCULATION OF PUMP ROOM

Dia of bars available


10 12 16 20 25 32 40 50
ALONG X-DIRECTION ALONG Z-DIRECTION
Design Moment = 29.625 kN m Design moment = 41.115 kN m
Projection = 0.725 m Projection = 0.725 m
Dia of bar = Y-10 mm Dia of bar = Y-10 mm
Effective "d" provided = 395 mm Effective "d" provided = 395 mm
Mu/bd2 =(29.625x10^6)/(1750x395^2) Mu/bd2 =(41.115x10^6)/(1750x395^2)
= 0.11 = 0.12
Pt req., =(25/(2x500))x(1-sqrt(4.6x0.11/25)))*100 Pt req., =(25/(2x500))x(1-sqrt(4.6x0.12/25)))*100
= 0.03 = 0.03
Req.,Ast =0.03%x1.75x(395) Req.,Ast =0.03%x1.75x(395)
= 108 mm2 = 207.375 mm2
Min Ast =0.12%x1750x(395) Min Ast =0.12%x1750x(395)
= 829.5 mm2 = 829.5 mm2
Governing Ast = 829.5 mm2 Governing Ast = 829.5 mm2
Provide Y-10 @-150 c/c Provide Y-10 @-150 c/c
Provided Ast Provided Ast
=((PI()X10^2)/4)x((1750/150)+1 =((PI()X10^2)/4)x((1750/150)+1

994.3333333 994.3333
%Ast,pro 0.15 %Ast,pro 0.15
SAFE SAFE
Check for one way Shear
The critical Section for One-way shear is at a distance "d" from the face of the column.
Design Shear Force = 68.47 kN Design Shear Force = 80.04 kN
Actual Shear Stress = 0.18 N/mm2 Actual Shear Stress = 0.21 N/mm2
Area of Steel Provided = 994.3333 mm2 Area of Steel provided = 994.33333 mm2
% of Steel Provided = 0.15 % % of Steel Provided = 0.15 %
Beta along "X" = 19.36 Beta along "Z" = 19.36
Allowable Shear Stress = 0.32 N/mm2 Allowable Shear Stress = 0.32 N/mm2

SAFE SAFE

Check for Two Way Shear


The critical Section for two way shear is along the perphery of the square at a distance "d/2" from the face of the
Column.
Perimeter of periphery = 2.78
Factored Shear Force = 405.5966 kN
Nominal Shear Stress = 0.369362 N/mm2
Permissible shear Stress in concrete= ζc
ζc '= Ks.ζc Ks=(0.5+l/b) should not be greater than 1 ,otherwise Ks=1
Therefore,Ks= 1
ζc = 0.25*(fck)^1/2
= 1.25 N/mm2
SAFE