0% found this document useful (0 votes)
70 views4 pages

Plumbing-Ground Floor Design Build Operate Mep Services Using Bim A113

The document appears to be a floor plan layout with dimensions and notes. Key details include: - Dimensions ranging from 160-974 units - Labels including "W", "D1", "D2", "V", "C", "B", "A" in various locations - Notes including "water closet flush tank", "flush tank 1", and "PLUMBING-GROUND FLOOR" - Grid of 14 columns and variable rows with numeric values

Uploaded by

Amal Prem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views4 pages

Plumbing-Ground Floor Design Build Operate Mep Services Using Bim A113

The document appears to be a floor plan layout with dimensions and notes. Key details include: - Dimensions ranging from 160-974 units - Labels including "W", "D1", "D2", "V", "C", "B", "A" in various locations - Notes including "water closet flush tank", "flush tank 1", and "PLUMBING-GROUND FLOOR" - Grid of 14 columns and variable rows with numeric values

Uploaded by

Amal Prem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

1 2 3 4 5 6 7 8 9 10 11 12 13 14

329 340 320 330 330 330 330 330 330 330 330 330 330

W W W W W W W W W W W

D 160 D

72 56 72 64 73 62 76 59 73 62 71 76
D2 V
372

D2
V
W
V
D2
C D1 D1
C
D1 D1 D2
V
UP D1
424

Water
closet
D2
flush
tank
V
W W 5

D2
Water
closet
flush V

B B
tank
D1 1

D1 D1 D1
220

A D
A
W W W W W W W W W W W W

1 2 3 4 5 6 7 8 9 10 11 12 13 14

No. Description Date


PLUMBING-GROUND FLOOR

13-03-2019 16:44:24
Project number BIM-101
DESIGN BUILD OPERATE Date 10-03-2019 A113
www.bimlabs.in MEP SERVICES USING BIM Drawn by SABIK
Checked by Checker Scale 1 : 125
1 2 3 4 5 6 7 8 9 10 11 12 13 14

329 340 320 330 330 330 330 330 330 330 330 330 330

967 23 974 93 160 93 637 23 967 23 100 15 199


W W W W W W W W W W W W
D D

128
D2 V

372
D2
V
W

546
V
D2
C C
787

787
D2
V
DN
D1

424
W D2 V
W
D2
V

B D1 D1 D1
D1
B
W W W W W W

220
V

A A
W

1 2 3 4 5 6 7 8 9 10 11 12 13 14

No. Description Date


PLUMBING-FIRST FLOOR

13-03-2019 16:44:24
Project number BIM-101
DESIGN BUILD OPERATE Date 10-03-2019 A114
www.bimlabs.in MEP SERVICES USING BIM Drawn by SABIK
Checked by Checker Scale 1 : 125
Parapet
905

Roof Top
695

FIRST FLOOR
375

Ceiling
255

GROUND FLOOR
45
GL
0

No. Description Date


SECTION

13-03-2019 16:44:26
Project number BIM-101
DESIGN BUILD OPERATE Date 10-03-2019 A115
www.bimlabs.in MEP SERVICES USING BIM Drawn by SABIK
Checked by Checker Scale 1 : 50
Plumbing Fixture Schedule
Family and Type Count

M_Water Closet - Flush Tank: Public - 12


Flushing Greater than 6.1 Lpf
Sanitary_Basins_Jika_IBON-Drop-in-basin: 6
IBON Drop in basin
Grand total: 18

No. Description Date


PLUMBING-3D VIEW

13-03-2019 16:44:28
Project number BIM-101
DESIGN BUILD OPERATE Date 10-03-2019 A116
www.bimlabs.in MEP SERVICES USING BIM Drawn by SABIK
Checked by Checker Scale

You might also like