Bill 10 UG Water Tank and Pump Room
Bill 10 UG Water Tank and Pump Room
Bill 10 UG Water Tank and Pump Room
AL-SAUD RESIDENCE
BILL
RIYADH
N0.10 - UG WATER TANK & PUMP ROOM
A Blinding 31 m3
To Collection SR
A Columns 10 m3
D Upstands 3 m3
E Concrete pads 60 m3
To Collection SR
A Blinding 4 m3
H Upstands 1 m3
To Collection SR
COLLECTION
10/3/1
10/3/2
10/3/3
To Summary SR
The Tenderer shall allow for additional items and costs Note
not specifically mentioned in this bill but necessary for
the satisfactory completion of the contract. Particular
items shall be considered to be included in the prices of
the items, No claims will be entertained for any items
shown or inferred by the Specifications and Drawings
and not included herein.
To Summary SR
To Collection SR
Sundries
Sundries
To Collection SR
Lining
Lining
To Collection SR
COLLECTION
10/7/1
10/7/2
10/7/3
Rate
Item Description Quantity Unit Amount (SR)
(SR)
DIVISION 09 - FINISHES
The Tenderer shall allow for additional items and costs Note
not specifically mentioned in this bill but necessary for
the satisfactory completion of the contract. Particular
items shall be considered to be included in the prices of
the items, No claims will be entertained for any items
shown or inferred by the Specifications and Drawings
and not included herein.
Floor Finishes
Wall Finishes
Ceiling Finishes
Rate
Item Description Quantity Unit Amount (SR)
(SR)
To Summary SR
DIVISION 10 - SPECIALITIES
To Summary SR
DIVISION 22 - PLUMBING
To Collection SR
A 90mm diameter 55 m
B 110mm diameter 60 m
C 160mm diameter 50 m
D 75mm diameter 40 m
E 110mm diameter 75 m
F 160mm diameter 30 m
Channel Drain
To Collection SR
G 300mm diameter 5 m
H 450mm diameter 5 m
To Collection SR
Valves
A 150mm diameter 2 Nr
B 250mm diameter 2 Nr
Non-Return Valve
C 150mm diameter 2 Nr
D 250mm diameter 2 Nr
To Collection SR
To Collection SR
DIVISION 22 - PLUMBING
COLLECTION
10/22/1
10/22/2
10/22/3
10/22/4
10/22/5
To Summary SR
DIVISION 23 - HVAC
To Collection SR
B 25mm diameter 65 m
C 32mm diameter 55 m
D 40mm diameter 15 m
E 50mm diameter 5 m
F 25mm diameter 65 m
G 32mm diameter 55 m
To Collection SR
A 40mm diameter 15 m
B 50mm diameter 5 m
Accessories
C 50mm diameter 3 Nr
D 50mm diameter 1 Nr
Duct Work
To Collection SR
To Collection SR
DIVISION 23 - HVAC
COLLECTION
10/23/1
10/23/2
10/23/3
10/23/4
To Summary SR
Rate
Item Description Quantity Unit Amount (SR)
(SR)
Rate
Item Description Quantity Unit Amount (SR)
(SR)
To Collection SR
Rate
Item Description Quantity Unit Amount (SR)
(SR)
1No. (4 x 10mm²
ESMDB-WT XLPE)sump
to isolator, + 1 x pump
10mm²WT-SP-CP
G from
F 23 Lm
1No. (4 x 10mm²
ESMDB-WT XLPE) sump
to isolator, + 1 x 10mm² G From
pump RB-SP-CP
G 28 Lm
Rate
Item Description Quantity Unit Amount (SR)
(SR)
To Collection SR
Rate
Item Description Quantity Unit Amount (SR)
(SR)
B Ref. ESMDB-WT 1 No
Socket Outlets
Rate
Item Description Quantity Unit Amount (SR)
(SR)
To Collection SR
Rate
Item Description Quantity Unit Amount (SR)
(SR)
Socket Outlets
A Junction box 5 No
J Lighting points 40 No
Rate
Item Description Quantity Unit Amount (SR)
(SR)
To Collection SR
Rate
Item Description Quantity Unit Amount (SR)
(SR)
Rate
Item Description Quantity Unit Amount (SR)
(SR)
To Collection SR
Rate
Item Description Quantity Unit Amount (SR)
(SR)
Rate
Item Description Quantity Unit Amount (SR)
(SR)
To Collection SR
Rate
Item Description Quantity Unit Amount (SR)
(SR)
Sundries
C Ref. LPP-MF4 1 No
Rate
Item Description Quantity Unit Amount (SR)
(SR)
To Collection SR
Rate
Item Description Quantity Unit Amount (SR)
(SR)
Lighting Switches
Socket Outlets
D Junction box 1 No
G Lighting points 2 No
Rate
Item Description Quantity Unit Amount (SR)
(SR)
To Collection SR
Rate
Item Description Quantity Unit Amount (SR)
(SR)
Rate
Item Description Quantity Unit Amount (SR)
(SR)
To Collection SR
Rate
Item Description Quantity Unit Amount (SR)
(SR)
COLLECTION
10/26/1
10/26/2
10/26/3
10/26/4
10/26/5
10/26/6
10/26/7
10/26/8
10/26/9
Rate
Item Description Quantity Unit Amount (SR)
(SR)
To Summary SR
DIVISION 27 - COMMUNICATIONS
To Summary SR
The Tenderer shall allow for additional items and costs Note
not specifically mentioned in this bill but necessary for
the satisfactory completion of the contract. Particular
items shall be considered to be included in the prices of
the items, No claims will be entertained for any items
shown or inferred by the Specifications and Drawings
and not included herein.
To Collection SR
To Collection SR
COLLECTION
10/28/1
10/28/2
To Summary SR
DIVISION 31 - EARTHWORK
Excavation
To Summary SR
To Collection SR
A One lead, one lag and one standby pumps, auto 1 Set
alternating, multi-stage, vertical and centrifugal
type. Pumps to be mounted on common base
frame pumps to be stainless steel Grade 316.
Capacity: Each pump capacity: 8.0 Cu.m/Hr at 71
M-head. Pumps set to be complete with pressure
gauges and switches, vibration isolators,
interconnecting pipe work, valves and check
valves, control panel, dry-running protection and
variable frequency drive for automatic operation.
B One lead, one lag and one standby pumps, auto 1 Set
alternating, multi-stage, vertical and centrifugal
type. Pumps to be mounted on common base
frame pumps to be stainless steel Grade 316.
Capacity: Each pump capacity: 7.0 Cu.m/Hr at 48
M-Head. Pumps set to be complete with pressure
gauges and switches, vibration isolators,
interconnecting pipe work, valves and check
valves, control panel, dry-running protection and
variable frequency drive for automatic operation.
To Collection SR
A One lead, one lag and one standby pumps, auto 1 Set
alternating, multi-stage, vertical and centrifugal
type. Pumps to be mounted on common base
frame pumps to be stainless steel Grade 316.
Capacity: Each pump capacity: 14.0 Cu. m/Hr at 41
M-head. Pumps set to be complete with pressure
gauges and switches, vibration isolators,
interconnecting pipe work, valves and check
valves, control panel, dry-running protection and
variable frequency drive for automatic operation.
To Collection SR
To Collection SR
To Collection SR
To Collection SR
To Collection SR
COLLECTION
10/46/1
10/46/2
10/46/3
10/46/4
10/46/5
10/46/6
10/46/7
To Summary SR
SUMMARY
4 Division 09 - Finishes
5 Division 10 - Specialities
6 Division 22 - Plumbing
7 Division 23 - HVAC
9 Division 27 - Communications
11 Division 31 - Earthwork
SUMMARY
To General Summary