B1 Usability Package: Go-Live Checklist
B1 Usability Package: Go-Live Checklist
Package
Go-Live Checklist
January 2014
Final Preparation Phase
Objective:
The objective of this checklist is to document that the final preparation for Go-Live has been completed. As a
result, all checks have to be completed, i.e. answered with ‘Yes
System Readiness
Verify that all actions to get the system properly configured have been conducted and tested in the
productive environment.
Project Management
Is the system ready for Go-Live in a production environment?
Yes No
Comments:
Add-on Management
Is the add-on installed and operative?
Yes No
Have all users required to run the add-on been set to run it and
Yes No
assigned a license?
Have the required modules been activated and allowed to create Yes No
Page 2 of 4
their metadata?
Are all configurations created and tested? Yes No
Have the appropriate additional authorizations been assigned to a
super user for administration of the system? Yes No
Comments:
Company Readiness
To confirm that the end users and the system support personnel are ready for the Go-Live.
Comments:
Page 3 of 4
By signing below, the parties agree that the information in this document is correct and that the system is
ready to go live in production.
Page 4 of 4