HIRA For DPP-2 Project in I Block
HIRA For DPP-2 Project in I Block
Site/ Department : Overall site & all departments Section/ Area : Cold storage area Location in Dept : Warehouse
Team Members : Preferably owner dept / EHS / Engineering
Main Activity / Operation : Loading and unloading activity of HDPE drums in cold storage room (-20 deg C)
Document reference : Nil
Equipments involved : Cold Storage Chamber
Any legal applicability with reference to this Activity / Operation :
Risk Assessment (after control) Risk Category Risk Mitigation
Risk Rating without
Control
Possibility of
Condition Severity of Likelihood of Occurrence
Operation Type of Activity Consequence (Harm) Person (s) at Risk (E Leading to Risk Rating (RR) High (RR > 16)
S.No. Normal (N) / OHS Hazard Existing Control Measures Consequences / Harm of incident
(Sub Activity) (R / NR) - Injury / Illness / C / V) Emergency (Yes / Medium (RR betn 6-15)
Abnormal (A) High / Additional Control Measures
No)
Medium / (S) (L) (S X L)
Low Low (RR <6 )
5-1 5-1 25-1
Move the load inside the truck R Strain or more serious injury (such as
as close to the edge of the back injury) because the load is too
bed as possible to be ready for heavy.
unloading.
R Injury to the body due to undue
extension when hopping onto truck
bed to move object to be unloaded
R Injury to the foot or toes due to
pinching or striking the edge of the
container.
Unload object or container by R Physical injury from too much weight
lifting slightly and carrying being unloaded by one person.
the load downward to the
ground or a waiting mobile
platform
R Bodily strain or greater injury due to
heavy load or improper movement.
R Physical injury due to container
hitting body part while unloading.
If load is set on a mobile platform,
strain or injury due to unexpected
movement of the platform.
Move load to designated final Strain or injury due to heavy load
location. being moved or being unloaded from
the carrier to the final location.
NAME
SIGNATURE
Date
HAZARD IDENTIFICATION,RISK ASSESMENT(HIRA) CONTROL SHEET
Site/ Department :Projects Section/ Area : Near H-block Utility area Location :H-Block Unit-II
Site/ Department :Projects Section/ Area : Near H-block Utility area Location :H-Block Unit-II
2) SLAB
1. PPE like Helmet,Safety shoes, &
goggles provided.
2. Working people will be with PPE.
3. Providing the scaffolding for
Shuttering for slab Physical Shuttering at height.
2.1 NR N Fall Hazard C N Medium 4 2 8 Medium Area is barricated
(At height) injury. 4. Certified safety belts are provided
3)FLOORING WORK
HAZARD IDENTIFICATION,RISK ASSESMENT(HIRA) CONTROL SHEET
Site/ Department :Projects Section/ Area : Near H-block Utility area Location :H-Block Unit-II
4) DUCTING WORK
1. PPE like Helmet,Safety shoes, &
GI sheet cutting and goggles provided.
making it in to duct 2. Cut Resistance gloves are
4.1 NR N Cut injury Injury C Y H provided 2 5 10 Medium
and making
isulation 3. Skilled workmen provied
for the relevent activity
1. Electrical machines without cut
Electrocutio wires and joints are allowed to use.
Drilling to the slab 1. Electrocution
4.2 NR N n leading to C Y H 2. Isolation the area from all 5 2 10 Medium ELCB is provided
for fixing of duct 2. Fire Hazard
fatality. flammables
1. Scaffolding done for work at
Fixing of Duct to height.
Fall of human from
4.3 threaded rod after NR N causality C Y H 2.Certified safety belts are provided 2 5 10 Medium Area is barricated
height
drilling work
6) PAINTING WORK
1. Painter Shall wear Face Mask,
Internal painting of Inhalation of Paint Respiratory Gloves to avoid exposure to paint.
12.1 NR N C Y M 3 3 9 Medium
walls smell Hazard
HAZARD IDENTIFICATION,RISK ASSESMENT(HIRA) CONTROL SHEET
Site/ Department :Projects Section/ Area : Near H-block Utility area Location :H-Block Unit-II
MECHANICAL ACTIVITIES
1. PPE like Helmet,Safety shoes, &
1. Slip trip goggles provided.
Dismantling of 2.Ergonomics 2. Certified Safety belts
1 NR N Injury C Y H 5 2 10 Medium Area is barricated
Existing structure 3. Fall hazard are provided
3. Height work permit
provided
1. PPE like Helmet,Safety shoes, &
Installation of MSGL 1. Slip trip goggles provided.
500Kg receiver 2.Ergonomics 2. Certified Chain pulley
2 NR N Injury C Y H 5 3 15 Medium Risk
( Leading & 3. Swing hazard are provided
Erection) 3. Lifting Shifting permit
provided
HAZARD IDENTIFICATION,RISK ASSESMENT(HIRA) CONTROL SHEET
Site/ Department :Projects Section/ Area : Near H-block Utility area Location :H-Block Unit-II
Cutting of channels
1.1 1. Working people will be with gloves
with cutting machine
to avoid cuts and wounds.
NR N Cut injury Injury C N H 3 2 6 Medium Risk
HAZARD IDENTIFICATION,RISK ASSESMENT(HIRA) CONTROL SHEET
Site/ Department :Projects Section/ Area : Near H-block Utility area Location :H-Block Unit-II
Site/ Department :Projects Section/ Area : Near H-block Utility area Location :H-Block Unit-II
4) CABLE LAYING
1. Cables are stretched manually.
2. Rotating manpower.
NR N Ergonomic hazard. Sprine C N M 1 4 4 Medium Risk -
Cable laying using
cable jack after
4.1 1. Working people will be with gloves
cutting it to desired
to avoid cuts and wounds.
length with hacksaw
NR N Cut injury Injury C N H 2. Training on Proper work to the 3 2 4 Medium Risk -
personnel.
HAZARD IDENTIFICATION,RISK ASSESMENT(HIRA) CONTROL SHEET
Site/ Department :Projects Section/ Area : Near H-block Utility area Location :H-Block Unit-II
1. Rotating manpower.
NR N Ergonomic hazard. Sprine C N M 1 4 4 Medium Risk -
Site/ Department :Projects Section/ Area : Near H-block Utility area Location :H-Block Unit-II
Installation of 2.0KLRCVD
Installation of Blender
Installation of Sifter
Risk Rating Risk Assessment (after control) Risk Category Risk Mitigation
without Control
Possibility of Severity of Likelihood of Risk
Condition
Type of Consequence Person (s) at Leading to Consequences Occurrence of Rating High (RR > 16)
Operation Normal (N) /
S.No. Activity OHS Hazard (Harm) - Risk (E / C / Emergency Existing Control Measures / Harm incident (RR) Medium (RR
(Sub Activity) Abnormal Additional Control Measures
(R / NR) Injury / Illness V) (Yes / No) (S) (L) (S X L) betn 6-15)
(A) High /
Medium / Low (RR <6 )
5-1 5-1 25-1
Low
1. Full body harness belts are provided
a)Leading the Sifter. for the work men
1.Fall Hazard
b)Placing on the ground 2. Cut Resistance gloves
2.Slip trip
c)Leading of equipment are provided 3. Certified 'Area Barricated and Closed
using using rolled pipes. D-Sackles are used monitoring from executing
7 NR N 3.Hand injury Injury C NO H 5 2 10 Medium
4.All legal documents are avaible with department person Continuiosly
4. Ergonomic hazard
e)Positioning of equipment vehicle and well skilled operator available
5. Equipment Fall hazard
using A frame. present for the work.
6.Swing Hazard
Installation of Microniser
NAME
SIGNATURE
Date