0% found this document useful (0 votes)
80 views1 page

C A F G H D B E: Finish Start

The document outlines a management training program for Mohawk Discount Store consisting of 8 activities (A-H) that trainees must complete. Certain activities have precedence relationships where a later activity requires the completion of an earlier activity, such as activity D and F requiring the completion of A, B, and C first before they can be started. A project network diagram is provided showing the precedence relationships between each of the 8 activities for the trainees to complete the program.

Uploaded by

yellow fish
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
80 views1 page

C A F G H D B E: Finish Start

The document outlines a management training program for Mohawk Discount Store consisting of 8 activities (A-H) that trainees must complete. Certain activities have precedence relationships where a later activity requires the completion of an earlier activity, such as activity D and F requiring the completion of A, B, and C first before they can be started. A project network diagram is provided showing the precedence relationships between each of the 8 activities for the trainees to complete the program.

Uploaded by

yellow fish
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

SELF TEST 1: MOHAWK PROJECT NETWORK

The Mohawk Discount Store is a designing management training program for individuals at its
corporate headquarters. The company wants to design the program so that trainees can complete
it as quickly as possible. Important precedence relationships must be maintained between
assignments or activities in the program. For example, a trainee cannot serve as an assistant to
the store manager until the trainee has obtained experienced in the credit department and at least
one sales department. The following activities are he assignments that must be completed by
each trainee in the program. Construct a project network for this problem. Do not perform any
further analysis.

Activity A B C D E F G H
A, D,
Immediate Predecessor - - A A,B C E,G
B F

A C F

START D G FINISH
H

B E