3
WORK CENTRES FOR INTEGRATION
ACTIVITIES
Valiamala (Tvm)
LMF (Mahendragiri)
(Sub assembly Preparation for
(For Liquid Stages)
PSLV & GSLV) Core Base Shroud
1/2L, 1/2M, 1/2V, Equipment Bays, * Mech. Pre Assy. including
Heat Shields, PS3 adaptor, PLA etc) fixing Bond Pads on tanks
* Stage Integration
* Pre-Assy. Mech. Int. operations.
* Inspection /Marking using 3DCMM * Engine Harnessing
* Harness Preparation * Electrical Testing
* Avionic Package Assembly * Leak & Functional checks
* Electrical Checks
* Vibration Assy & Vibration test MVIT
PLANNING, CO-ORDINATION,
& EXECUTION OF INTEGRATION and
CHECKOUT OF LAUNCH VEHICLES
Thumba (Tvm) SRIHARIKOTA
Liquid Stage sub assembly
preparation (PS2, GS2 & L40s), * Preparation of vehicle stages
LVM3 , RSR Payload & RLV * Checkout at Stage Level
assemblies preparation * Vehicle build-up at Pad
* Pre-Assy. Mech. Int. operations. * Alignment Checks
* Harness Preparation * Flight Battery Preparation
* Avionic Package Assembly * Vehicle Checkout
* Electrical Checks * Launch Operations
* Vibration Assembly
4
Major mechanical integration tasks
1. Assembly / installation of
o Satellite Assembly
o Pre-launch Cooling
o Rain proofing
o Umbilical connections
o Alignment
5
Launch Vehicle Mechanical Integration Group
- Housing Concept
RMSA ETA
Advantages
• High strength & stiffness with low mass
• Good vibration damping
9
2nd May, 2013 Presentation at ZeeDP Program
Launch Vehicle Mechanical Integration Group
Pressure Pickup
Secondary
Igniter
Primary
Igniter
Most of the pads are welded on steel motor cases at work centre itself. A few
are additionally bonded during stage preparation.
All pads on aluminium propellant tanks of liquid & cryo stages are bonded
instead of welding to avoid localised residual stresses.
Incase of solid motor (PS3 in PSLV) made of reinforced fibre material, the
dilations values are high. Hence the pads are bonded with intermediate rocasin
sheet to absorb dilation.
2nd May, 2013 Vehicle
Presentation at ZeeDPIntegration
Program at Launch Complex 11
Launch Vehicle Mechanical Integration Group
Bonding on tanks
TPS Materials
15
Launch Vehicle Mechanical Integration Group
VIBRATION ISOLATOR