0% found this document useful (0 votes)
57 views6 pages

Lean PM

Lean project management uses principles from lean manufacturing to focus on delivering value with less waste and reduced time. The phased or staged approach breaks work down into a series of distinct steps and manages them through completion, typically consisting of five process areas including four phases plus control. It is often referred to as the traditional or waterfall approach, though the specifics may vary.

Uploaded by

Rakesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views6 pages

Lean PM

Lean project management uses principles from lean manufacturing to focus on delivering value with less waste and reduced time. The phased or staged approach breaks work down into a series of distinct steps and manages them through completion, typically consisting of five process areas including four phases plus control. It is often referred to as the traditional or waterfall approach, though the specifics may vary.

Uploaded by

Rakesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Lean project management[edit]

Main article: Lean project management


Lean project management uses the principles from lean manufacturing to focus on delivering
value with less waste and reduced time.

Phased approach[edit]
The phased (or staged) approach breaks down and manages the work through a series of
distinct steps to be completed, and is often referred to as "traditional" [28] or "waterfall".[29] Although
it can vary, it typically consists of five process areas, four phases plus control:

Lean project management[edit]


Main article: Lean project management
Lean project management uses the principles from lean manufacturing to focus on delivering
value with less waste and reduced time.

Phased approach[edit]
The phased (or staged) approach breaks down and manages the work through a series of
distinct steps to be completed, and is often referred to as "traditional" [28] or "waterfall".[29] Although
it can vary, it typically consists of five process areas, four phases plus control:

Lean project management[edit]


Main article: Lean project management
Lean project management uses the principles from lean manufacturing to focus on delivering
value with less waste and reduced time.

Phased approach[edit]
The phased (or staged) approach breaks down and manages the work through a series of
distinct steps to be completed, and is often referred to as "traditional" [28] or "waterfall".[29] Although
it can vary, it typically consists of five process areas, four phases plus control:

Lean project management[edit]


Main article: Lean project management
Lean project management uses the principles from lean manufacturing to focus on delivering
value with less waste and reduced time.

Phased approach[edit]
The phased (or staged) approach breaks down and manages the work through a series of
distinct steps to be completed, and is often referred to as "traditional" [28] or "waterfall".[29] Although
it can vary, it typically consists of five process areas, four phases plus control:

Lean project management[edit]


Main article: Lean project management
Lean project management uses the principles from lean manufacturing to focus on delivering
value with less waste and reduced time.

Phased approach[edit]

C2 General
The phased (or staged) approach breaks down and manages the work through a series of
distinct steps to be completed, and is often referred to as "traditional" [28] or "waterfall".[29] Although
it can vary, it typically consists of five process areas, four phases plus control:

Lean project management[edit]


Main article: Lean project management
Lean project management uses the principles from lean manufacturing to focus on delivering
value with less waste and reduced time.

Phased approach[edit]
The phased (or staged) approach breaks down and manages the work through a series of
distinct steps to be completed, and is often referred to as "traditional" [28] or "waterfall".[29] Although
it can vary, it typically consists of five process areas, four phases plus control:

Lean project management[edit]


Main article: Lean project management
Lean project management uses the principles from lean manufacturing to focus on delivering
value with less waste and reduced time.

Phased approach[edit]
The phased (or staged) approach breaks down and manages the work through a series of
distinct steps to be completed, and is often referred to as "traditional" [28] or "waterfall".[29] Although
it can vary, it typically consists of five process areas, four phases plus control:

Lean project management[edit]


Main article: Lean project management
Lean project management uses the principles from lean manufacturing to focus on delivering
value with less waste and reduced time.

Phased approach[edit]
The phased (or staged) approach breaks down and manages the work through a series of
distinct steps to be completed, and is often referred to as "traditional" [28] or "waterfall".[29] Although
it can vary, it typically consists of five process areas, four phases plus control:

Lean project management[edit]


Main article: Lean project management
Lean project management uses the principles from lean manufacturing to focus on delivering
value with less waste and reduced time.

Phased approach[edit]
The phased (or staged) approach breaks down and manages the work through a series of
distinct steps to be completed, and is often referred to as "traditional" [28] or "waterfall".[29] Although
it can vary, it typically consists of five process areas, four phases plus control:

Lean project management[edit]

C2 General
Main article: Lean project management
Lean project management uses the principles from lean manufacturing to focus on delivering
value with less waste and reduced time.

Phased approach[edit]
The phased (or staged) approach breaks down and manages the work through a series of
distinct steps to be completed, and is often referred to as "traditional" [28] or "waterfall".[29] Although
it can vary, it typically consists of five process areas, four phases plus control:

Lean project management[edit]


Main article: Lean project management
Lean project management uses the principles from lean manufacturing to focus on delivering
value with less waste and reduced time.

Phased approach[edit]
The phased (or staged) approach breaks down and manages the work through a series of
distinct steps to be completed, and is often referred to as "traditional" [28] or "waterfall".[29] Although
it can vary, it typically consists of five process areas, four phases plus control:

Lean project management[edit]


Main article: Lean project management
Lean project management uses the principles from lean manufacturing to focus on delivering
value with less waste and reduced time.

Phased approach[edit]
The phased (or staged) approach breaks down and manages the work through a series of
distinct steps to be completed, and is often referred to as "traditional" [28] or "waterfall".[29] Although
it can vary, it typically consists of five process areas, four phases plus control:

Lean project management[edit]


Main article: Lean project management
Lean project management uses the principles from lean manufacturing to focus on delivering
value with less waste and reduced time.

Phased approach[edit]
The phased (or staged) approach breaks down and manages the work through a series of
distinct steps to be completed, and is often referred to as "traditional" [28] or "waterfall".[29] Although
it can vary, it typically consists of five process areas, four phases plus control:

Lean project management[edit]


Main article: Lean project management
Lean project management uses the principles from lean manufacturing to focus on delivering
value with less waste and reduced time.

Phased approach[edit]

C2 General
The phased (or staged) approach breaks down and manages the work through a series of
distinct steps to be completed, and is often referred to as "traditional" [28] or "waterfall".[29] Although
it can vary, it typically consists of five process areas, four phases plus control:

Lean project management[edit]


Main article: Lean project management
Lean project management uses the principles from lean manufacturing to focus on delivering
value with less waste and reduced time.

Phased approach[edit]
The phased (or staged) approach breaks down and manages the work through a series of
distinct steps to be completed, and is often referred to as "traditional" [28] or "waterfall".[29] Although
it can vary, it typically consists of five process areas, four phases plus control:

Lean project management[edit]


Main article: Lean project management
Lean project management uses the principles from lean manufacturing to focus on delivering
value with less waste and reduced time.

Phased approach[edit]
The phased (or staged) approach breaks down and manages the work through a series of
distinct steps to be completed, and is often referred to as "traditional" [28] or "waterfall".[29] Although
it can vary, it typically consists of five process areas, four phases plus control:

Lean project management[edit]


Main article: Lean project management
Lean project management uses the principles from lean manufacturing to focus on delivering
value with less waste and reduced time.

Phased approach[edit]
The phased (or staged) approach breaks down and manages the work through a series of
distinct steps to be completed, and is often referred to as "traditional" [28] or "waterfall".[29] Although
it can vary, it typically consists of five process areas, four phases plus control:

Lean project management[edit]


Main article: Lean project management
Lean project management uses the principles from lean manufacturing to focus on delivering
value with less waste and reduced time.

Phased approach[edit]
The phased (or staged) approach breaks down and manages the work through a series of
distinct steps to be completed, and is often referred to as "traditional" [28] or "waterfall".[29] Although
it can vary, it typically consists of five process areas, four phases plus control:

Lean project management[edit]

C2 General
Main article: Lean project management
Lean project management uses the principles from lean manufacturing to focus on delivering
value with less waste and reduced time.

Phased approach[edit]
The phased (or staged) approach breaks down and manages the work through a series of
distinct steps to be completed, and is often referred to as "traditional" [28] or "waterfall".[29] Although
it can vary, it typically consists of five process areas, four phases plus control:

Lean project management[edit]


Main article: Lean project management
Lean project management uses the principles from lean manufacturing to focus on delivering
value with less waste and reduced time.

Phased approach[edit]
The phased (or staged) approach breaks down and manages the work through a series of
distinct steps to be completed, and is often referred to as "traditional" [28] or "waterfall".[29] Although
it can vary, it typically consists of five process areas, four phases plus control:

Lean project management[edit]


Main article: Lean project management
Lean project management uses the principles from lean manufacturing to focus on delivering
value with less waste and reduced time.

Phased approach[edit]
The phased (or staged) approach breaks down and manages the work through a series of
distinct steps to be completed, and is often referred to as "traditional" [28] or "waterfall".[29] Although
it can vary, it typically consists of five process areas, four phases plus control:

Lean project management[edit]


Main article: Lean project management
Lean project management uses the principles from lean manufacturing to focus on delivering
value with less waste and reduced time.

Phased approach[edit]
The phased (or staged) approach breaks down and manages the work through a series of
distinct steps to be completed, and is often referred to as "traditional" [28] or "waterfall".[29] Although
it can vary, it typically consists of five process areas, four phases plus control:

Lean project management[edit]


Main article: Lean project management
Lean project management uses the principles from lean manufacturing to focus on delivering
value with less waste and reduced time.

Phased approach[edit]

C2 General
The phased (or staged) approach breaks down and manages the work through a series of
distinct steps to be completed, and is often referred to as "traditional" [28] or "waterfall".[29] Although
it can vary, it typically consists of five process areas, four phases plus control:

Lean project management[edit]


Main article: Lean project management
Lean project management uses the principles from lean manufacturing to focus on delivering
value with less waste and reduced time.

Phased approach[edit]
The phased (or staged) approach breaks down and manages the work through a series of
distinct steps to be completed, and is often referred to as "traditional" [28] or "waterfall".[29] Although
it can vary, it typically consists of five process areas, four phases plus control:

C2 General

You might also like