Building Development Application BDA01201910

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

WATER AND SEWERAGE AUTHORITY

OF TRINIDAD AND TOBAGO


INFRASTRUCTURE & COMPLIANCE DEPARTMENT

BUILDING DEVELOPMENT APPLICATION


All fields are to be filled in BLOCK LETTERS

Section 1 - PROPERTY & OWNER INFORMATION

1.1 Name of Development

1.2 Address of Development

1.3 Name of Property Owner


Surname First Name Other

1.4 Address of Owner

1.5 Owner Contact Telephone: Email:

1.6 Name of Applicant


Surname First Name Other

1.7 Address of Applicant

1.8 Applicant Contact. Telephone: Email:

Section 2 - DEVELOPMENT INFORMATION

2.1 Type of Development

Residential Industrial Commercial Other: Specify

Total Land Area: (m2) (ha)

Number of Lots Number of Occupants

TCPD Ref. No TCPD Approval Date

Phased Development: Yes No If Yes, how many phases? How many lots per phase?

Was an application for the development submitted before? Yes No

If yes, what was the previous application number

Is there a Plumbing application file for the said development? Yes No

2.2 Proposed Wastewater Disposal

Public Sewer System On-Site Treatment (Septic Tank) Soakaway Sand Filter Trench

Absorption Trench Packaged Wastewater Wastewater Treatment Plant


Treatment Plant

2.3 For Permanent water supply, please provide the following :

Water demand estimated

Water Usage Domestic Fire Industrial Processing

BDA01201910
WATER AND SEWERAGE AUTHORITY OF TRINIDAD AND TOBAGO
INFRASTRUCTURE & COMPLIANCE DEPARTMENT
BUILDING DEVELOPMENT APPLICATION
Section 3 - APPLICATION ATTACHMENTS/ENCLOSURES

The following enclosures must be submitted with this application form:


1. Town & Country Planning Outline Approval
2. Location Plan
3. Plan of Area showing contour line at 1.5m intervals
4. Cadastral
5. Lotification plan- identifying all proposed subdivisions
6. Copy of Owners Identification
7. Copy of Applicant identification
8. Evidence of ownership- Deed etc

Section 4 - APPLICANT DECLARATION

I the undersigned, as applicant, on this application form declare as follows:


1) The information provided on this application form is true and correct.
2) I will not solicit or engage the services of any employee of the Water and Sewerage Authority in furtherance of this
application.
3) I have read the following requirements and understand same:

Requirements for Building Development Approval


1. Application with Required attachments and fees ($2500.00) – refer to application form.
2. Upon receipt of Outline Approval the applicant must obtain Design Approval before installation of water and wastewater
infrastructure. As such applicant must submit to the Infrastructure & Compliance Department of the Authority:
9 Detailed design drawings of the water reticulation system (Four (4) copies on A1 size sheets)
9 Preliminary Fire Services Approval from the Trinidad and Tobago Fire Services.
9 Design data and detailed design calculations and drawings of the wastewater disposal system along with required
setbacks. (Four (4) copies on A1 size sheets.
9 Water reticulation details (Four (4) copies on A1 size sheets).
9 Manufacturer’s equipment specifications, where applicable.
9 Design Review Fee as applicable.
Note: where designs do not meet the requirements of the Authority, applicant must make the necessary corrections and
resubmit. A resubmission fee applies.
3. Upon receipt of Design Approval applicant must:
9 Submit a schedule of works
9 Written request for inspection
9 Pay inspection fees
Note where repeat visits are required re-inspection fees will apply
4. Upon successful inspection of the water infrastructure, applicant must undertake pressure testing of the water infrastructure.
Upon notification of Pressure Testing, applicant must prepare infrastructure on date of testing, by bringing the pressure on
the water infrastructure to 150PSI for 24hrs.
Note: the Authority will install a pressure logger on the infrastructure to pressure test same. The installation fee for the logger
is $1200.00.
5. Upon successful pressure testing the Authority Applicant must install meters for each lot. The Authority will then inspect the
meter installation and collect data required for billing.
6. The Authority will then issue an invoice for interconnection, the cost of which represents the estimated cost to be incurred by
the Authority in conducting the installation. When applicant pays the cost of interconnection a Completion Certificate will be
issued.
7. Interconnection will then be scheduled and when completed an account will be created for each lot.

Signature Of Owner ID/DP/PASSPORT No. Date

Signature Of Applicant ID/DP/PASSPORT No. Date

For Official Use Only

Application attachments present Application Fee paid Reference #

WASA Customer Service Representative Date


BDA01201910

You might also like