0% found this document useful (0 votes)
24 views2 pages

Exam 130123

Exam Ordo

Uploaded by

Sou Tibon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views2 pages

Exam 130123

Exam Ordo

Uploaded by

Sou Tibon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Exam Sequencing and scheduling, 2P450,

January 23, 2013, 14:00-17:00

This test contains four questions on two pages, with 10 sub-items, for which a total of
50 points can be scored. Each good answer scores 5 points. The final grade is obtained
by dividing the amount of points by five. Questions may be answered in English and/or in
Dutch. Please explain your answers. You are NOT allowed to use the handouts distributed
in class/or on the web.

Question 1. Consider the problem 1|rj |Lmax of minimizing maximum lateness on a single
machine under release dates. In particular consider the instance given by

jobs j 1 2 3 4 5 6 7
pj 6 18 12 10 10 17 16
rj 0 0 0 14 25 25 50
dj 8 33 44 24 90 85 68

(a) Formulate and apply the preemptive EDD rule. Compute the optimal preemptive sched-
ule, and list the results in a table with the following entries:

jobs j 1 2 3 4 5 6 7
CjpEDD
dj 8 33 44 24 90 85 68
pEDD
Lj

(b) Prove optimality of your schedule by pointing out the correct critical job subset.

Question 2. Consider a problem with m uniform machines, with speeds s1 ≥ s2 ≥ . . . ≥


sm > 0. We have n tasks that may be preempted. The jobs have processing requirements pj
with p1 ≥ p2 ≥ . . . ≥ pn > 0, for j = 1, . . . , n. That means that if a machine i is to process
p
the whole job j, it will take sji time units. We are interested in minimizing the makespan.

(a) Argue that if, for instance I, a schedule of length ` exists, then, for any integer k,
0 < k < min{m, n}, there is also a schedule of length ` or less for the instance Ik ,
defined by considering only the k first machines, and the k first tasks. Use the result
OPT (I).
on Ik to express a lower bound LBk (I) on Cmax

(b) Argue that if a schedule of length ` exists, then


Pn
j=1 pj
` ≥ max{ Pm , max LBk }
i=1 si k

(c) For the following instance on 5 machines and 7 jobs compute the (highest) lower bound
and find a schedule of the corresponding length. Machine speeds are: s1 = 5, s2 = 4,
s3 = 3, s4 = 2 and s5 = 1; job requirements are p1 = 470, p2 = 390, p3 = 340, p4 = 160,
p5 = 60, p6 = 40 and p7 = 20.

1
Question 3. Consider the problem (P ): O5||Cmax of minimizing maximum completion time
on a set of five identical machines. In particular consider the instance I on 6 jobs where
process requirements are given by

jobs j 1 2 3 4 5 6
p1j 1 0 1 0 1 2
p2j 1 1 2 0 2 0
p3j 2 1 1 1 1 0
p4j 1 2 1 2 0 0
p5j 1 1 0 1 0 2

We further consider the problem (Q): O5|pmtn|Cmax of minimizing maximum completion


time on a set of five identical machines, where we allow operations to be preempted.
Let P (I 0 ) and Q(I 0 ) denote the optimal solution values of the two problems, defined on
the same instance I 0 .

(a) How do the values P (I 0 ) and Q(I 0 ) relate, for general instances I 0 ? Justify your claim.

(b) For the general case I 0 , and for the particular instance I defined above, give a non-trivial
lower bound on the solution values Q(I 0 ) and Q(I).

(c) Does there exist a solution of Q with a matching value? If so, compute such a schedule.

(d) If we would consider instances I” of the open shop problem defined on TWO machines,
for example on the instance given by

jobs j 1 2 3 4 5 6
p1j 4 1 3 1 3 2
p2j 2 4 2 3 1 2

what is then the relation between P (I”) and Q(I”), where P and Q refer to the non-
preemptive and the preemptive version, respectively? Substantiate your answer.

Question 4.
Consider the use of the LPT-rule for solving the problem of minimizing makespan on m
parallel identical machines processing n jobs. We observe the following

LEMMA: for any instance I of P ||Cmax : if there exists an optimal schedule with at most
two operations per machine, then LPT when applied on I yields a schedule that has optimal
length.

You do not have to prove this lemma!! Give the worst case ratio between the makespans
LPT (I)
Cmax OPT (I) in terms of m and prove that ratio making use of the above Lemma.
and Cmax