Concrete Quantity of Box Culvert 2x3x3 Reinforcement Calculation For BC 2X3X3

The document provides a summary of the concrete quantities and reinforcement details for a box culvert with dimensions of 2m x 3m x 3m. It includes 11 items describing the various parts of the culvert with their dimensions, volumes, and reinforcement requirements. The total concrete quantity is 116.0225 cubic meters and the total reinforcement is 8504.86 kg consisting of 4006.4 kg of 12mm bars, 4411.52 kg of 16mm bars, and 86.94 kg of 20mm bars.

Uploaded by

Vorn Ra Vuth
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
88 views3 pages

Concrete Quantity of Box Culvert 2x3x3 Reinforcement Calculation For BC 2X3X3

The document provides a summary of the concrete quantities and reinforcement details for a box culvert with dimensions of 2m x 3m x 3m. It includes 11 items describing the various parts of the culvert with their dimensions, volumes, and reinforcement requirements. The total concrete quantity is 116.0225 cubic meters and the total reinforcement is 8504.86 kg consisting of 4006.4 kg of 12mm bars, 4411.52 kg of 16mm bars, and 86.94 kg of 20mm bars.

Uploaded by

Vorn Ra Vuth
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Concrete Quantity of Box Culvert 2x3x3

No. Description B (m) H(m) L(m) V(m3) Description No.


1 Body 6.043 1 10 60.43 1
2 Top Cut off 0.115 2 6.75 1.5525 BODY 2
3 Bottom Cut off 0.145 2 6.75 1.9575 3
4 Base Slab 63.736 2 0.15 19.1208 4
Apron
5 Cut Off 0.17 2 12.43 4.2262 5
6 Foundation 8.34 4 0.4 13.344 6
Wing Wall
7 Wing Wall 11.625 4 0.331 15.3915 7
TOTAL 116.0225 8
22 Aproch 9
10
rete Quantity of Apron slab 1 Cell 232.045 243.64725 11
No. 12
1 13
2 Description B (m) H(m) L(m) V(m3) Description 14
3 Base Slab 5.059 1 0.2 1.0118 15
4 Cut Off 0.3 3.7 0.2 0.222 16
TOTALHead Wall 1.675 1 0.2 0.335 17
Wing Wall 2.388 0.2 2 0.9552 18
2.524 192 kg 19
20
Base Slab 0.274 21
22
5.3004 23

11602.25
7654.374
19256.624

69.2
156

11.26
3.8 0.52569
1.51 11.78569
1.98 5.2569 12.3749745
REINFORCEMENT CALCULATION FOR BC 2X3X3
Description Dia (mm) U.W (kg/m) L (m) Qty Num. T.L (m)
BODY -C1 16 1.58 5.2 41 2 426.40
BODY -C2 16 1.58 3.66 41 4 600.24
BODY -C3 16 1.58 6.86 41 2 562.52
BODY -C4A 16 1.58 7.24 41 1 296.84
BODY -C4B 16 1.58 9.1 41 1 373.10
BODY -C5 16 1.58 5.1 41 2 418.20
BODY -C6 12 0.89 10 188 1 1880.00
BODY -C7 12 0.89 6.6 7 2 92.40
BODY -C8 12 0.89 1.43 68 2 194.48
BODY -C9 16 1.58 1.4 41 2 114.80
BODY -C10 12 0.89 6.91 5 2 69.10
BODY -C11 12 0.89 1.515 23 2 69.69
Apron Slab - A2 12 0.89 12.43 5 2 124.30
Apron Slab - A3 12 0.89 5.3 17 2 180.20
Apron Slab - A4 12 0.89 3.7 22 2 162.80
Apron Slab - A5 12 0.89 6.9 20 2 276.00
Foundation - W1,2,3 12 0.89 6.2 6 2 74.40
Foundation - W5 12 0.89 1.24 28 2 69.44
Cut Off - A1 12 0.89 12.43 6 2 149.16
Cut Off - A6 12 0.89 2.6 63 2 327.60
Wing Wall Vertical 12 0.89 3 25 8 600
Wing Wall Horizontal 12 0.89 2.9 10 8 232
Dowel 20 2.47 0.8 11 4 35.20
Total

5% Pcs BC
DB 12: 4006.4 4206.72 395.00 2 790
DB 16: 4411.52 4632.096 245.00 2 490
DB 20: 86.94 91.287 4.00 2 8

DB 12: 150 157.5 15.00 1 15


DB 16: 234 245.7 13.00 1 13

144
360

340.2 3.906
T.W (kg)
673.71
948.38
888.78
469.01
589.5
660.76
BODY
1673.2
82.24
173.09
181.38
61.5
62.02
110.63
160.38
Apron Slab
144.89
245.64
66.22
61.8 Foundation
132.75
291.56
534
206.48
86.94
8504.86