0% found this document useful (0 votes)
225 views3 pages

Int 2016

This document is a transmittal from Chengda Engineering Co. Ltd. to Khair Inorganic Chemical Industries regarding the Inochem Soda Ash & Calcium Chloride Project. It lists 47 recipients from Inochem and Worley involved in the project and indicates whether a response is required from each. Graham Watson from Worley is listed as requiring a response. The transmittal is from Fang Pan as project manager regarding an unspecified document.

Uploaded by

Vija
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
225 views3 pages

Int 2016

This document is a transmittal from Chengda Engineering Co. Ltd. to Khair Inorganic Chemical Industries regarding the Inochem Soda Ash & Calcium Chloride Project. It lists 47 recipients from Inochem and Worley involved in the project and indicates whether a response is required from each. Graham Watson from Worley is listed as requiring a response. The transmittal is from Fang Pan as project manager regarding an unspecified document.

Uploaded by

Vija
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

中国四川省成都市天府大道中段 279 号

No.279.Middle Section,Tianfu Avenue Chengdu,Sichuan 610041,China


Fax: +86-28-65530000 65530001 Tel: +86-28-65530002
E-mail: [email protected] Website: http://www.chengda.com

DOCUMENT TRANSMITTAL
Project
Inochem Soda Ash & Calcium Chloride Project Project Code E19016
Name

TO Khair Inorganic Chemical Industries Co.JSC (c) Fax No.

ATTN Ahmed.Algahtani/Project Director Page of

From CHINA CHENGDA ENGINEERING CO.LTD DATE 11/16/2020

Signed Fang Pan/Project Manager DOC.No INT-2016

CC: Dou Qizhi/ Engineering Manager Our-Email Fang [email protected]

Response
Recipients Name Title Company Email
Required
1 Ryan gabion DC InoChem NO [email protected]
2 min Fu DC Worley NO [email protected]
Sr Mechanical-
3 Xiaoming Cheng
Rotating Engineer Worley NO [email protected]

4 Chunqiao Li Sr Piping Engineer Worley NO [email protected]


5 Venkata. Pilla Electrical engineer Worley NO [email protected]
Sr Instrument
6 Weihua Zhou
Engineer Worley NO [email protected]

7 Chen Hong Sr Project Engineer Worley NO [email protected]


8 Jun Liu DC Worley NO [email protected]
9 Graham Watson Quality Manager Worley YES [email protected]
Sr. Telecom
10 Yaxin Zhang
Engineer Worley NO [email protected]

11 Jia Hao Sr HVAC Engineer Worley NO [email protected]


12 Noor A Sandiman Project Manager Worley NO [email protected]

13 Abdul hameed HSE Manager Worley NO [email protected]

Lead Process
14 Jun Ye
Engineer Worley NO [email protected]

Sr Civil-Structural
15 Fujun Li
Engineer Worley NO [email protected]

Sr Architect
16 Yanzhong Cui
Engineer Worley NO [email protected]

Sr Mechanical-
17 Hongbo Wang
Static Engineer Worley NO [email protected]

plumbing and fire


18 Zhang. Xuejun
fighting engineer Worley NO [email protected]

Procurement &
Contracts Manager Worley
19 Mark Williams NO [email protected]

Engineering
20 Jane Zhu
Manager Worley NO [email protected]

21 Cherry Yin DC Worley NO [email protected]


22 Dave Harris Construction Lead Worley NO [email protected]
23 Khaled Osman OSBL Manager Worley NO [email protected]
Project Manager
24 Fahad .alharbi
(I&E) inochem NO [email protected]
25 Reem .alajmi DC inochem NO [email protected]
Sr. Process
26 Vika M. Gandhi
Engineer inochem NO [email protected]

27 AlRayan m. Bajba Project Engineer inochem NO [email protected]


28 Fahad S. Al-Sahli E&I Team Leader inochem NO [email protected]
Project Engineer -
29 Salem A. AlHajri
I&Systems inochem NO [email protected]

Project Engineer -
30 Faisal Al-Ghamdi
Electrical inochem NO [email protected]

Senior Process
31 Jawad N. Butt
Engineer inochem NO [email protected]

Senior Process
32 Ali S. Hassan
Engineer inochem NO [email protected]

33 Moamen M. Ali Process Engineer inochem NO [email protected]


Infras Building &
34 Tuais F. Al-Shammari Facilities (IBF) inochem NO [email protected]
Director
35 Ali A. Alramel Project Manager inochem NO [email protected]
Oprtion Readiness
& Start-Up’ Director inochem
36 Mohmmed A. Alghamdi NO [email protected]

Senior Process
37 Vikas M. Gandhi
Engineer inochem NO [email protected]

Sr. Project control


38 Abdulatif S. Alatawi
engineer inochem NO [email protected]

39 Roel M. Baron Civil Engineer inochem NO [email protected]


Contracts &
40 Hatoon S. Alghamdi
Purchasing Buyer inochem NO [email protected]

Mechanical
41 Muteb .Alshammari
Engineer inochem NO [email protected]

42 Mark Miranda DC inochem YES [email protected]


43 Khalid .lawama Engineering Director inochem NO [email protected]
Director, Acting
44 Ahmed .algahtan Plant Process and inochem NO [email protected]
Utilities, C&M

Project Engineer -
45 Ahmed Al-Harbi
Mechanical inochem NO [email protected]

InoChem
46 Mohammed Al Khaibari
Construction Lead inochem NO [email protected]

47 Majed AlShammari Civil Engineer inochem NO [email protected]


Capital Contracting
48 Abdullah. Asiri & Procurement inochem NO [email protected]
Manager
49 Sarah Al-Sahli Reporter inochem NO [email protected]
50 Araj Khan Reporting Analyst inochem NO [email protected]
51 Moamen M. Tarakhan Project Engineer inochem NO [email protected]

Subject Inspection and Test Plan for Steel Structure Installation Work (1A), PWTM-CS&IC-CM-0016

Doc. Comments Comments


seq. Doc.No. Rev. Doc.Title sheet Issued for
Class status Date
QA-04-0000-62-ITP-006 Inspection and Test Plan for Steel
1 1A
1A
Structure Installation Work_Rev.1A
11 2 Review
NOTES

Signatures
InoChem PMC
(Signature/Name/Date) (Signature/Name/Date)

You might also like