Project Proposal On Building Construction
Project Proposal On Building Construction
August, 2021
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction
Contents pages
1. Executive Summary ........................................................................................................ 5
2. Introduction ..................................................................................................................... 6
2.1. General Background .................................................................................................... 6
2.2. Objective of the project ................................................................................................ 7
2.3. Project description ....................................................................................................... 8
2.4. Project Rationale .......................................................................................................... 9
2.5. The significance of the project ................................................................................... 10
2.6. Project Location ......................................................................................................... 11
3. The market Study .......................................................................................................... 11
3.1. Market Analysis ......................................................................................................... 11
3.2. The Demand-Supply Gap .......................................................................................... 12
3.3. Current supply of mixed use building ........................................................................ 13
3.4. Future market or Demand of commercial Building rental ......................................... 14
3.5. Target customers ........................................................................................................ 15
3.6. Marketing promotion and strategy ............................................................................. 15
3.7. Competition................................................................................................................ 16
3.8. The project facilities and Services plan ..................................................................... 16
4. Technical Study ............................................................................................................ 18
4.1. Description of the project Service/ Product mix ........................................................ 18
4.2. Construction work and Technology ........................................................................... 19
4.3. Utilities....................................................................................................................... 23
5. Engineering and civil works ......................................................................................... 23
5.1. Land, Building and Civil Works ................................................................................ 23
5.2.Man Power .................................................................................................................. 25
5.3. Project implementation .............................................................................................. 26
5.4.Organizational Structure ............................................................................................. 27
5.4.1. Organization and management ............................................................................... 27
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction
List of table
List of Figures
1. Executive Summary
Key information highlights
Production capacity G +3
Products to be manufactured
Rental rooms
Source of fund 30% or 3300024.915 etb from owner equity and the
rest 70% from bank loan.
Social and economic benefit: Provide better building service, employment opportunities,
generation of income and benefits for the local people
Analysis result
The project is technically feasible, financially and commercially viable as well as socially and economically
acceptable. Hence, the project is worth implementing.
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction
2. Introduction
Sarbo town is one of more economically stable town in Jimma zone popular in Chat,Cereal
Crop,Fruits and Vegetatn Coffee and livestock market. Mixed use building will be owned
and operated by Mr Mohammed Nezif Aba Mecha, whom are resident for long time in the
district planned to construct mixed use building in Sarbo town Thus,This project feasibility
study is undertaken to check the market, technical and financial feasibility of this project.
The business will be operated as a Private ownership and will offer supermarkets, Beauty
salon, shops, offices Computer and mobile Center, Cafeterias, restaurant, boutiques, textile
fashion, baby clothe, assembly hall, guest house and other activities, pharmaceutical, as
well as novelty items. Recently Sarbo town is becoming convenience for such investment
and the growing demand of better economic service. To realize this mixed use building
plays a crucial role to promote the growth of the town in one hand and to reduce the
growing demand of commercial house. The socio-economic environment of the town
The promoter is very ambitious and committed to realize the project. Hence, they expects
to get the necessary support from the city administration to make the project to be
operational.
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction
Looking at the past trends and permits issues by the Government to the
construction of real estate properties including the mixed use building in the
major urban areas of the country specially in Addis Ababa one can easily conclude that the
momentum is more likely to continue.
Besides, the government polices and incentives for the private sector investment are very
promising that motivates the promoter to engaged in mixed use building business.
The primary objective of this project is to gives quality and convenient services to the
customer on their demand and to facilitate Urbanization of towns, targeting in
government policies.
Provide restaurant and hotels service to serve growing market demand and to address
the needs of the community;
create an economically viable development that will contributes to the national
economy through creating job opportunities to unemployment, generating tax revenue
to bodies of the government and facilitating supply and service availability in the
market.
To construct and develop modern shops, offices, and restaurant, bedroom & cafeteria
facilities that enable to provide standard services to visitors.
To undertake trading and other refuted business activities that enable to generate a
reasonable to the invested capital.
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction
To develop modern business centre that would provide product and services to meet
the market demand with efficient and quality to attract foreign visitors and thereby
contribute towards the generation of hard currency for the country.
Contribute towards the development of the town through the construction of modern
building infrastructure and facilities.
project to render banking and insurance, shopping facility, and cafeteria services to create
high quality class to satisfy the interest of customers in the town. Based on environmental
and other considerations, the entrepreneur has determined the type and size of the building
which is already determined by the site; conceptual planning and preliminary analysis have
been carried out by analysts.
The Economic growth and rapid urbanization in the country is promising investment
opportunities, the demands of product and service needs along with relatively sound
investment support made by the government in such kinds of feasible projects, compelled
the project promoter to initiate the multipurpose oriented business project to be established.
Despite the promising business opportunities of the town, the trend on such kinds of
investment found to not enough. The mismatch between the demand for and supply of such
kind of services in easily observed in the town.
Therefore, the existing shortage or absence in the supply of these services, along with its
commercial and administrative access, better location and infrastructure access, escalating
trend of urbanization and business activities, thus it is with such reason that this project is
identified and proposed and assumed to be more profitable.
In general, the country’s privatized and free market economy; good governance creates a
favorable environment for the development of investment for private investors.
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction
A. Source of Revenue
As public policy of any nation, the government collects different forms of taxes from
different business organizations and individuals. Among the different forms of taxes,
business income taxes, payroll income tax and VAT are collected from undertaking
business activities. Therefore, the building will serve as sources of revenue for the town as
well as for the region.
B. Employment opportunity
One of the problems that our country faced is unemployment. Therefore, the current
objective of the government is working on tackling the problem of unemployment and
fostering the development process either through creating self employment or employment
in other organization. Hence, this project will hire 23 individuals and more than eighty
individual during construction.
In addition to serving as a source of employment and income for the region, the project
renders social services for different group of people. Hence, it is also provide the following
services;
Since, the center encompasses different recreational areas; it will divert the attention of
the users from different evil deeds.
It deemed to minimize the demand for shops and other bundles of services in the area.
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction
Furthermore, it serves as the pilot experience and ground for other investor to enter in to
such kinds of urban development. It also contributes on the efforts made on as a character
given building for physical development pattern of the townscape.
Sarbo town is a have its own administrative unit (municipal) under Kersa woreda in Jimma
zone of the Oromia regional state.Sarbo town is the Capital town of Kersa district and a
center of socio-economic activity The town is surrounded by rural kebele of Kersa woreda
as it is being the administrative center of Kersa woreda.
The envisioned project is intended to be located in Sarbo town at about 335 km from Addis
Ababa to the south west. The town is selected because of strategic economic hub for
different cash crop like Chat,coffee, and also Fruits and vegetation and livestock. The town
have access to basic social service like 24 hr electric service, telecom, post office, and clean
water. The town’s economic catchment extends beyond the Kersa woreda attracting
investor from Tiro Afeta district and Jimma town as well.
The rapid growth of population along with urbanization, Increasing income and modernity
of town dweller and surrounding population residents are currently purchasing “specialty”
items in Jimma town that will be replaced provided by this project in Sarbo town. Recently
the increase in the price of Chat,Fruit and vegetable,Livestock and coffee has increased the
power of population for market. Town residents and surrounding area population presently
purchase everyday “necessity” items from small scale shop ‘Kiosk’ kebele house which
does not allow satisfactory commercial activity and poor in construction. On the other hand
it’s not convenient to get goods and service in one location which will waste time and price
as well. People who purchase goods from such small shop express dissatisfaction with
availability and price. People travel to Jimma town to fulfill their market demand, and the
same is true for businessman to get convenient rental shop they leave the town.
There are three major customer groups: (1) Local entrepreneurs (2) Diaspora looking for
essential business shop (2) surrounding town businessmen and entrepreneur (3) Whole sale
and distributer of good and service from big city, who look for convenience yet are
relatively price sensitive.
comfortable climate that combines a more traditional type with that of modern shops,
offices, bedrooms restaurants and cafeterias. Even though the town is older town in the
region Sarbo town seems to have no developed mixed use building, the existing supply is
far behind the growing demand for standard service. Hence, the project will solve the
serous demand problem in the town.
Over the last decade, there has been a significant growth in the number of local and
international trades across the country. Merchant from Jimma town from central market
and foreign trader starts to come to the town. This increase is mainly associated with the
stimulation of economic activist and partly due to an increase in the flow of international
and local traders in to the town. Since Sarbo town is an important commercial center in
addition there is a significant increase in business activates and hence increasing the
number of traders to the town. Even though there is a lack of quantitative estimates that
number of traders to the town. Even though there is a lack of quantitative estimates that
depict the actual demand and also the annual growth rate Hotel facilities and urban
commercial facilities are scarce in the city. So far in the town there is no development of
such kind standard building and it is the first of its kind in the town and will promote other
investors from the town and the surrounding areas. They are mostly villa type premises
modified as show rooms and sailing posits. As a result there is a large gap between the
developed and that of the supply for modern bed rooms; Bank and cafeteria
accommodation hence this project would not face any problem of demand scarcity for it
business centre and it would provide good service to customers.
development. Other factors relevant in the specific case of commercial buildings are the
large increases in national and international businesses, particularly firms in the services
sector.
The business of multipurpose buildings in Sarbo Town in booming highly due to the recent
rapid growth experienced in Ethiopia. As a result, a good number of local and international
organizational are coming in place. Government offices which used to operate in limited
spaces all over the city are also concentrating on leasing new and modern buildings.
Increasing numbers of international organization and NGOs which in the past had typically
converted residences into office space are now moving towards renting whole floors or
even multiple floors in modern city-center commercial buildings.
Following our survey of office space users in Sarbo town are mainly firms providing
banking, cafeteria and restaurants, bed room, supermarkets service, computer Center
Crevice. The different customers for commercial buildings also include shops and offices
that are currently renting out to provide their goods and services.
Future demand for office space is actually driven from growth in number of offices in the
city which in turn is influenced by the macro-economic growth in the country. Following
the government five year growth and transformation plan (GTP), the Ethiopian economy
is expected to increase by 11% for base case scenario and 14% under the optimistic case
scenario. Assuming that demand for office space is directly related to the growth in the
economy, the forecast for office space demand is shown in the following table;
1. business Community
6. Nongovernmental organizations
In order to penetrate and gain considerable market share, one of the major marketing
strategies for the project is consistently rendering quality service to its tenants. Due
emphasis must be placed on improving quality of service and facilities. The major
marketing strategies to promote the project and gain considerable market share include:
Advertising through different means focusing on the existing service and facilities
using FM radio ,Social Media and newspaper.
Using advertising means like Banner, Business card, internet channel and pages.
Working on public relations to reach and influence key personas and organization
with a capacity of making decision.
Keeping the quality of its service/ facilities and consistently improving with
changing situations.
3.7. Competition
There are different forms of competition that may face the envisaged mixed use building.
These are price and non price based competition.Moreover, there are different competitors
that will compete with the project either directly or indirectly. Mixed Use commercial
building desires to set a precedent in Sarbo town as a full service convenience shop, store
and service rendering with an economical image, offering a wide range of competitively
priced products and services in one location. Need of residents and surrounding population
combined with the consistent popularity of convenience market predict a favorable
business climate for MohammedNazif Aba Mecha Mixed use building.
In order to provide mixed use business center building services of a high standard, it has
been planned to construct and develop the infrastructure and facilities that would viable to
meet the requirements of an international standard business center. Accordingly, various
buildings and facilities will be constructed phase by phase starting with the most needed
ones that are essential to commence the operation of its business activities. With the
completion of construction, the building will provide a combined service such as shops,
bedroom, restaurant and café service as well as modern business center that primarily serve
its guests and major clients.
Table 2.The plan is that the ground will be partitioned in to different rooms:
1st floor Beauty salon, shop, Computer Center, Cafeteria & M2 200
Restaurant
Total
Since the project will be engaged in mixed building the main sources of its annual revenue
would be from the rental of building spaces such as shops, offices, and banking, café &
restaurant bedrooms. Therefore, the sources of revenue have been classified in to one
category namely the rental of banking & supermarket, offices, shops, bedrooms restaurant
and café based on these classifications. Based on the market price of similar mixed use
building in the area, the envisioned buildings set the following fair price (Before VAT) for
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction
its service, hence when the building construction fully get operational it is assumed to
generate a yearly income of ETB 971,662.12.
4. Technical Study
the ground floor, first floor and second floor designed for different business centers
like banks, supermarket, beauty salon(man and women), Computer center,
pharmacy, internet café, boutiques, different shops and other business activities,
Besides, the buildings will have enough parking facility for its customers and green area in
its compound.
The total land required for the envisioned project is estimated to be 400 m2 . the total area
for the construction of the building will be 200 m2, as revealed below.
SN Description Land M2
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction
1 Building (G+3)
Total 400
The Building Enclosure Phase includes erecting the scaffolding that will allow for exterior
sheathing installation and bricklaying.
Mechanical and Electrical install coincide with each other due to the need for coordination
between the two divisions. There are several periods of construction during the schedule
in which there are multiple construction activities occurring at the same time.
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction
The construction site must be organized accordingly as these processes take place. As with
any construction project, the goal of the schedule was to complete all construction activities
before the required Date of completion.
This date of completion is practical based on the time of year in which the building will be
completed. The team allowed a two week contingency for any setbacks. Typically, winter
construction tends to cause unforeseen delays that negatively impact a construction project.
These conditions can and will almost undoubtedly impact the project schedule by causing
unforeseen delays and project inefficiency.
Although functional spaces for the project were laid out in significant detail, the rest of the
building had designated spaces but n set layouts. It was at the discretion of the project
promoter to devise typical layouts for the non-detailed commercial and office spaces.
To make sure that the building’s layouts were practical, the project owner researched
typical architectural layouts for laboratory and executive office spaces. The walls and
partitions throughout the floor were congruent with the structural frame and column
locations.
One of principle deliverables of our project is the structural design of the building. The
structural bays were coordinated with the layout of the building adjustments were made to
the bays if specific layouts are necessary. The frame was made up of a grid with repeating
standard structural bays. Included in the structural system are bay sizes, shape and size of
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction
structural members, floor compositions and curtain walls. These elements were established
to resist gravity ad lateral loads as appropriate.
The gravity load design was completed for two frames; one of structural steel and one of
reinforced concrete. The structural steel frame was chosen for further design based on cost
per square foot, local availability of material and constructability considerations, such as
erection and fabrication. The steel system was then designed for lateral loading with
necessary adjustment being made to framing.
The project group prepared hand structural design calculations for a typical bay of a
reinforced concrete frame. In all reinforced concrete bay designs, a superimposed dead
load of 7.5 pounds per square foot was assumed for mechanical equipment, floor coverings
and ceilings.
Similarly, the design of the typical bay accounted for the use of different commercial space,
in which a live load of 125 pounds per square was assumed. Loads were calculated based
on the requirements of the minimum Design loads for Buildings and other Structures.
The design of a superstructure may be accurate, have considered all possibilities and still
fail because the substructure is incapable of distributing the applied loads to the supporting
soil.
Foundation design takes more into consideration than merely the loading from the columns.
While the main part of the project focused on the structural frame and its alternate designs,
a preliminary foundation plan was designed based upon maximum load carried from the
superstructure through the columns. The foundation design conducted by the project team
consisted of the selection of foundation type, determination of the bearing capacity and the
design for typical interior and exterior spread footings.
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction
The project team developed a coordinated project schedule and construction plans that
would reflect the expectations for an actual construction project. The project schedule was
developed using the preliminary designs given to the project team.
Additionally, the group considered typical construction activities and durations taken from
similar construction projects as well as realistic constraints on building development. For
instance, it is necessary for the structural frame to be completed before concrete can be
placed for the slab on deck. Hand drawn construction plans detailing site entrances and
storage areas were coordinated with the project schedule to give the reader visualizations
of the construction site set up through various periods of the construction process.
The construction process for this project is normally a disjointed three mages development
by which the conceptualized need of the promoter of this project is translated into a
functional facility that will meet their needs in terms of time, cost and quality.
Based on a general program of the project owners the consultant who is going to be hired
makes site studies, develops structural designs, prepares drawings and specifications,
determines quantities involved and estimated the resultants costs. All these activities will
be done in the first phase of the project which is the design stage after the document are
produced by the designers have been received, and the works secured the project is
supposed to enter the tendering stage. At this stage contractors study the project document
analyze and subsequently determine the construction methods, built up their unit rates and
submit their bids for the works. The promoter of this project intends to compare the bids
and award the contract for the lowest responsible bidder. This, is of course, presupposes
that the favorable proposal does not exceed the allocated budget.
After the award is made and the contract signed between this project owner and the
contractor, the project constructor is expected to prepare and submits a detailed
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction
construction program which includes material schedule, manpower requirement and cash
flow forecast.
After the award is made and the contract signed between this project owner and the
contractor, the project constructor is expected to prepare and submits a detailed
construction program which includes material schedule, manpower requirement and cash
flow forecast.
4.3. Utilities
A number of utilities world be put in place in order to ensure smooth functioning of the
project. These utilities include:
Water Supply,
Drainage Facility
A. SUB-
STRACTURE
1 excavation and earth
works 110,324.12
B. SUPER
STRACTURE
1 Concrete work 1,100,358.45
3 Roofing 110,193.00
6 Finishing 1,051,379.44
7 Painting 108,398.88
Subtotal 4,411,868.17
A+B 5,868,192.29
As shown on Table 5, the total cost of building and civil work is estimated at Birr 6,850,000
and out of which the proponent has worked more than birr 5.86 million.
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction
The list of manpower and the annual cost of labor is indicated in Table 5.
Total 23 315,000
Workers for this type of plant are available throughout the year. No foreseeable problems
are expected as most of the work requires no previous skills.
SN Activities Date
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction
5.4.Organizational Structure
Organizational Structure
The organizational structure of the project is designed by including all the necessary
personnel under the right division. At the top of the organizational structure, there will be
manager with the responsibility of supervising the overall activity of the building.
Depending up on the nature of the center and the amount of work to be performs; there
exist auxiliary units under the general manager.
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction
Employees under each unit will be supervised by the department head that is accountable
for the general manager. General Manager is appointed by owner.
Owner
General
Manager
Cashier Purcha
ser
Under building admin dept there exist two sections i.e., HRM & finance and general
service. Further sub sections are also organized under technical and maintenance manager.
The following section deals with the duties and responsibilities of each department.
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction
He/she will plan, organize, direct and control the overall activities of the building.
He/she will devise policies and strategies that will enable the center to be profitable.
He/she will incorporate modern technological innovation that will facilitate the service
delivery of the building to increase customer’s satisfaction.
He/she will plan, organize, direct and control the human and non-human resources of
the building so as to achieve the short and long run objectives of the organization.
The building Administration Department of the multipurpose building has two main
sections (HRM and Finance and General Service section). It has responsible for
undertaking the following activities;
Well non human resources of the project, which include; effective handling of the
different resources of the building, and devise strategies of controlling against fraud
and damage.
Will provide the right material or inventory to the center with right price at the right
time.
Will plan, organize direct and control the financial transaction of the building by
using all the necessary documents.
Accountant and casher that will collect money from the customers.
Will prepare the annual financial statements and prepare condensed reports for both
the General Manager and other concerned government body.
Follow the overall status of the business and provide maintenance and repair
services
Will handle the overall marketing activities of the organization which include
planning, organizing, directing, and controlling.
Works in collaboration with general service to make sure tenants are well served
Total 7,060,396.50
6 Total 394,800.00
C. Vehicle
Total 1,500,000.00
D. Office Equipments
Total 186,500.00
5.5.2..Working Capital
SN List of Items Annual cost List of Items Annual cost in Assumptions Used
in birr birr
1 Audit and legal SN Audit and legal 24,000.00 2000 br/per ,month
fee fee
10 Oil & Iubricants 9 Oil & Iubricants 6,300.00 10% of fuel cost
11 Telephone & fax 10 Telephone & fax 18,000.00 1500 per month
Total 50,000.00
3 Vehicle 1,500,000.00
The financial analysis of the mixed use building is based on the data provided in the
preceding sections and the following assumptions.
B. depreciation
Building 10%
The source of fund to finance the project is planned to be from two sources. These are
promoter’s equity and bank loan. The loan is expected to be obtained from one of the local
lending institutions. Since the project is expected to take some times to repay all its debts,
the bank loan is assumed to obtain on long term credit basis. Taking the financial position
of the promoters into account, equity contribution and bank loan to finance the total
investment outlays of the project are assumed to be 30% and 70% respectively.
Accordingly, the total financial requirement from the two sources will be;
Total
yea Principal Interest rate annual year ending
r payment (8.5%) Payment in balance
ETB
0 7700058.135
1424510.75
1 770005.8135 654504.9415 6930052.322
5
1362140.26
2 773085.8135 589054.4473 6156966.508
1
1296427.96
3 773085.8135 523342.1532 5383880.695
7
1230715.67
4 773085.8135 457629.859 4610794.881
3
1165003.37
5 773085.8135 391917.5649 3837709.068
8
1099291.08
6 773085.8135 326205.2707 3064623.254
4
967866.495
8 773085.8135 194780.6824 1518451.627
9
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction
902154.201
9 773085.8135 129068.3883 745365.8135
8
10 63356.09415 0
Assumtion
Expenses
Cash payment
Investment 9,141,697 0 0 0 0
According to the projected income statement, the building will start generating profit in the
2nd year of operation. Important ration such as profit to total sales, net profit to equity
(Return on equity) and net profit plus interest on total investment (return on total
investment) show as increasing trend during the lifetime of the project. The income
statement and the other indicators of profitability show that the project is viable.
Being exemplary for other investors who want to engage in the same business line.
There are some noises during the construction due to the construction operation and
the company will use construct the construction during the day time. Again there is
the emission of dust which will be mitigated by sprinkling water on the service.
During construction there are some problems that will materialize on workers. These are:
damage on operation by using machines, construction materials and others. To mitigate
such impact the company will provide safety insurance and safety equipments.
During operation there are some wastes emitting from the mixed use building. These are
wastes from the latrine and will be mitigated by using modern waste treatment technology.