This project proposal is for the construction of a G+3 mixed-use building in Sarbo Town, Jimma Zone, Oromia Regional State by Mr. Mohammed Nazif Aba Mecha. The 11 million birr project will include rental rooms for commercial and residential use. It is expected to provide employment for 23 people permanently and 80 people casually. The building will help meet market demand for rental space and generate income. The project is considered technically, financially, and socially viable with an expected payback period of 10 years.

Uploaded by

Redwan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
93% found this document useful (15 votes)
24K views42 pages

Project Proposal On Building Construction

This project proposal is for the construction of a G+3 mixed-use building in Sarbo Town, Jimma Zone, Oromia Regional State by Mr. Mohammed Nazif Aba Mecha. The 11 million birr project will include rental rooms for commercial and residential use. It is expected to provide employment for 23 people permanently and 80 people casually. The building will help meet market demand for rental space and generate income. The project is considered technically, financially, and socially viable with an expected payback period of 10 years.

Uploaded by

Redwan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 42

Project Proposal for the construction of

Mixed use Building

Project is to be implemented in Oromia


Regional State ,Jimma Zone,Kersa
District ,Sarbo Town

Promoter:- Mr.MohammedNazif Aba


Mecha

August, 2021
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

Contents pages
1. Executive Summary ........................................................................................................ 5
2. Introduction ..................................................................................................................... 6
2.1. General Background .................................................................................................... 6
2.2. Objective of the project ................................................................................................ 7
2.3. Project description ....................................................................................................... 8
2.4. Project Rationale .......................................................................................................... 9
2.5. The significance of the project ................................................................................... 10
2.6. Project Location ......................................................................................................... 11
3. The market Study .......................................................................................................... 11
3.1. Market Analysis ......................................................................................................... 11
3.2. The Demand-Supply Gap .......................................................................................... 12
3.3. Current supply of mixed use building ........................................................................ 13
3.4. Future market or Demand of commercial Building rental ......................................... 14
3.5. Target customers ........................................................................................................ 15
3.6. Marketing promotion and strategy ............................................................................. 15
3.7. Competition................................................................................................................ 16
3.8. The project facilities and Services plan ..................................................................... 16
4. Technical Study ............................................................................................................ 18
4.1. Description of the project Service/ Product mix ........................................................ 18
4.2. Construction work and Technology ........................................................................... 19
4.3. Utilities....................................................................................................................... 23
5. Engineering and civil works ......................................................................................... 23
5.1. Land, Building and Civil Works ................................................................................ 23
5.2.Man Power .................................................................................................................. 25
5.3. Project implementation .............................................................................................. 26
5.4.Organizational Structure ............................................................................................. 27
5.4.1. Organization and management ............................................................................... 27
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

5.5. Financial Requirement and Analysis ......................................................................... 30


6. Financial analysis and Statements ................................................................................ 35
6.2. Financial Statement .................................................................................................... 39
6.2.1. Income loss/statement ............................................................................................. 39
6.3. Financial analysis ....................................................................................................... 41
7. Environmental impact of the project............................................................................. 41
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

List of table

Table 1.Office Space Demand Forecast ............................................................................ 14


Table 2.The plan is that the ground will be partitioned in to different rooms: ................. 17
Table 3. Land utilization Plan ........................................................................................... 18
Table 4.List of Building and Civil Works and Their Costs .............................................. 24
Table 5.Manpower Requirement and Annual Labor Cost ................................................ 25
Table 6. project Implementation schedule ........................................................................ 26
Table 7. Land, Building & Construction .......................................................................... 31
Table 8. Building Machineries and Equipments ............................................................... 31
Table 9.office equipment .................................................................................................. 32
Table 10.Operating Expenses ........................................................................................... 33
Table 11 Pre-service Expenses ......................................................................................... 34
Table 12.Summary of Total initial investment cost .......................................................... 35
Table 13.Loan repayment schedule .................................................................................. 37
Table 14.Depreciation schedule ........................................................................................ 38
Table 15.Mixed use Building profit/Loss Statement ........................................................ 39
Table 16.Cash Flow statement .......................................................................................... 40

List of Figures

Figure 1.organization structure of the Building ................................................................ 28


Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

1. Executive Summary
Key information highlights

Project owner Mr.MohammedNazif Aba Mecha

Project title Mixed use building

Land requirement 400 m2

Project area Sarbo town

Production capacity G +3

Products to be manufactured
Rental rooms

Market Domestic and international

Cost of the project 11,000,083.05 etb

Source of fund 30% or 3300024.915 etb from owner equity and the
rest 70% from bank loan.

Number of working days 365 days

Employment opportunity: 23 individuals on permanent 80 on casual basis

Social and economic benefit: Provide better building service, employment opportunities,
generation of income and benefits for the local people

Pbp ( pay back period) 10 yrs

Analysis result

The project is technically feasible, financially and commercially viable as well as socially and economically
acceptable. Hence, the project is worth implementing.
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

2. Introduction

2.1. General Background


The growth of investment in the property market over the last five years in consistent with
the global experience suggesting that investment in the residential and commercial property
(real estate) is greatly influenced by the performance of the macroeconomic conditions. In
general, a stable macroeconomic condition leads to economic and business growth and
develops investors’ confidence. This certainly spurs large demand in the property market
for office space, shopping malls, catering services, apartment and residential houses.
Following growing demand trends, and with the expectation of high return on their
investment capital, large number of land developers pooled their financial resources and
invested in the property market.

Sarbo town is one of more economically stable town in Jimma zone popular in Chat,Cereal
Crop,Fruits and Vegetatn Coffee and livestock market. Mixed use building will be owned
and operated by Mr Mohammed Nezif Aba Mecha, whom are resident for long time in the
district planned to construct mixed use building in Sarbo town Thus,This project feasibility
study is undertaken to check the market, technical and financial feasibility of this project.
The business will be operated as a Private ownership and will offer supermarkets, Beauty
salon, shops, offices Computer and mobile Center, Cafeterias, restaurant, boutiques, textile
fashion, baby clothe, assembly hall, guest house and other activities, pharmaceutical, as
well as novelty items. Recently Sarbo town is becoming convenience for such investment
and the growing demand of better economic service. To realize this mixed use building
plays a crucial role to promote the growth of the town in one hand and to reduce the
growing demand of commercial house. The socio-economic environment of the town

The promoter is very ambitious and committed to realize the project. Hence, they expects
to get the necessary support from the city administration to make the project to be
operational.
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

Looking at the past trends and permits issues by the Government to the
construction of real estate properties including the mixed use building in the
major urban areas of the country specially in Addis Ababa one can easily conclude that the
momentum is more likely to continue.

Besides, the government polices and incentives for the private sector investment are very
promising that motivates the promoter to engaged in mixed use building business.

2.2. Objective of the project


The major goal of this project is to contribute towards the growth of the trade sector in
Sarbo town.

Its specific objectives include the following.

 The primary objective of this project is to gives quality and convenient services to the
customer on their demand and to facilitate Urbanization of towns, targeting in
government policies.
 Provide restaurant and hotels service to serve growing market demand and to address
the needs of the community;
 create an economically viable development that will contributes to the national
economy through creating job opportunities to unemployment, generating tax revenue
to bodies of the government and facilitating supply and service availability in the
market.

 To construct and develop modern shops, offices, and restaurant, bedroom & cafeteria
facilities that enable to provide standard services to visitors.

 To undertake trading and other refuted business activities that enable to generate a
reasonable to the invested capital.
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

 To develop modern business centre that would provide product and services to meet
the market demand with efficient and quality to attract foreign visitors and thereby
contribute towards the generation of hard currency for the country.

 To create employment opportunities for the population in the town and

 Contribute towards the development of the town through the construction of modern
building infrastructure and facilities.

2.3. Project description


The popularity of convenience building and mixed market center continues as people
become more economically grow and demand for better product and service by creating
less time for household purchases. Chat and Crop is the major cash crop in Kersa woreda
and surrounding woreda. In Sarbo town thies is shortage of mixed use building that
promote efficient marketing. The closest activity is only in Jimma which is far away by 20
km from Sarbo town. Mixed use building will carry a wide range of goods and services in
its shop, allowing customers to satisfy more needs quickly in one location without having
to drive to other market center. In Ethiopia there are some convenience mixed building and
market center, more established each year in the suburbs and concentrated city areas.
However, there is a shortage of such activity in Sarbo town beside its being a center of
market for nearby woreda like Tiro Afeta,Omo Nada \ and surrounding Kersa woreda rural
areas traveler from Addis Ababa to Jimma will shop commodities from the town, the
population demand for product and service increase and the merchant have no favorable
shop to satisfy their costomer demand. Major Road from Addis to Jimma pass through
Sarbo town and offers a significant secondary target market for Mixed use building from
the travelers going to Jimma or Addis needing, food,goods or other services. The limited
number of mixed use building along the highway, giving them a large potential share of
the market. Growth potential of the community for product and service is promising. The
rapid increasing of population has increased consistently over the past ten years and the
number of businesses in the city has risen during this time period. The owner plans the
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

project to render banking and insurance, shopping facility, and cafeteria services to create
high quality class to satisfy the interest of customers in the town. Based on environmental
and other considerations, the entrepreneur has determined the type and size of the building
which is already determined by the site; conceptual planning and preliminary analysis have
been carried out by analysts.

2.4. Project Rationale


One of the biggest problems which are often occurring in the current urbanization
development in least developed countries is in convenience of market and lack of modern
market center. Therefore it is important to offer economic integration of demand and
supply.MohammedNazif Aba Mecha mixed commercial building is reliable business
center renovating G+3 story building for mixed use in Sarbo town. Therefore, The
Promoter will complete the building as per requirements and specification provided by the
client.

The Economic growth and rapid urbanization in the country is promising investment
opportunities, the demands of product and service needs along with relatively sound
investment support made by the government in such kinds of feasible projects, compelled
the project promoter to initiate the multipurpose oriented business project to be established.
Despite the promising business opportunities of the town, the trend on such kinds of
investment found to not enough. The mismatch between the demand for and supply of such
kind of services in easily observed in the town.

Therefore, the existing shortage or absence in the supply of these services, along with its
commercial and administrative access, better location and infrastructure access, escalating
trend of urbanization and business activities, thus it is with such reason that this project is
identified and proposed and assumed to be more profitable.

In general, the country’s privatized and free market economy; good governance creates a
favorable environment for the development of investment for private investors.
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

2.5. The significance of the project


The envisaged project deemed to add to the economic development of the nation in general
and zone and town in specific with following ways:

A. Source of Revenue

As public policy of any nation, the government collects different forms of taxes from
different business organizations and individuals. Among the different forms of taxes,
business income taxes, payroll income tax and VAT are collected from undertaking
business activities. Therefore, the building will serve as sources of revenue for the town as
well as for the region.

B. Employment opportunity

One of the problems that our country faced is unemployment. Therefore, the current
objective of the government is working on tackling the problem of unemployment and
fostering the development process either through creating self employment or employment
in other organization. Hence, this project will hire 23 individuals and more than eighty
individual during construction.

C. Sources of social service

In addition to serving as a source of employment and income for the region, the project
renders social services for different group of people. Hence, it is also provide the following
services;

 Serve as a source of mental satisfaction for the different users,

 Since, the center encompasses different recreational areas; it will divert the attention of
the users from different evil deeds.

 It deemed to minimize the demand for shops and other bundles of services in the area.
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

Furthermore, it serves as the pilot experience and ground for other investor to enter in to
such kinds of urban development. It also contributes on the efforts made on as a character
given building for physical development pattern of the townscape.

2.6. Project Location


Kersa district extends between 70 5-80 00 north latitudes and 360 46-370 14 east longitudes.
It is bordered with limmu ossa and district north Trio A feta district in northeast Omo
Nada district in south east, with Dedo district in south, Manna district in west and seka
chokersa district in south nest It is situated in the central of the zone. Because of
geographical location lie near to the largest market centers like Jimma towns) the district
has great advantage for accessing the local products to the market and creates ideal
condition for provision of the demanded commodities to the local communities.

Sarbo town is a have its own administrative unit (municipal) under Kersa woreda in Jimma
zone of the Oromia regional state.Sarbo town is the Capital town of Kersa district and a
center of socio-economic activity The town is surrounded by rural kebele of Kersa woreda
as it is being the administrative center of Kersa woreda.

The envisioned project is intended to be located in Sarbo town at about 335 km from Addis
Ababa to the south west. The town is selected because of strategic economic hub for
different cash crop like Chat,coffee, and also Fruits and vegetation and livestock. The town
have access to basic social service like 24 hr electric service, telecom, post office, and clean
water. The town’s economic catchment extends beyond the Kersa woreda attracting
investor from Tiro Afeta district and Jimma town as well.

3. The market Study

3.1. Market Analysis


Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

The rapid growth of population along with urbanization, Increasing income and modernity
of town dweller and surrounding population residents are currently purchasing “specialty”
items in Jimma town that will be replaced provided by this project in Sarbo town. Recently
the increase in the price of Chat,Fruit and vegetable,Livestock and coffee has increased the
power of population for market. Town residents and surrounding area population presently
purchase everyday “necessity” items from small scale shop ‘Kiosk’ kebele house which
does not allow satisfactory commercial activity and poor in construction. On the other hand
it’s not convenient to get goods and service in one location which will waste time and price
as well. People who purchase goods from such small shop express dissatisfaction with
availability and price. People travel to Jimma town to fulfill their market demand, and the
same is true for businessman to get convenient rental shop they leave the town.

There are three major customer groups: (1) Local entrepreneurs (2) Diaspora looking for
essential business shop (2) surrounding town businessmen and entrepreneur (3) Whole sale
and distributer of good and service from big city, who look for convenience yet are
relatively price sensitive.

3.2. The Demand-Supply Gap


Sarbo town is situated in very centre of Chat,Coffee Arabica, Crops,fruit and Vegetablex
and fat livestock producing area. The town is a cash crop hub which is highly known for
its Fruit and vegetable,Cereal crop ,Chat and Livestock. Local business man, town resident
and surrounding population reside on income generated from the above product. Recently
the growing demand of Chat,Cereal crop,Fruits and vegetation is increasing from local
market to international market. So the income level of the society is increasing due to the
incrassating price of those products. On the other hand Sarbo town is also a major business
center and commercial route that attracts thousands of business travelers. These are also
the most important groups of potential customers that include both the local and foreign
tourists, commuters and the modern business community who choose services that range
from economic to high class standards.These groups would also choose a healthy
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

comfortable climate that combines a more traditional type with that of modern shops,
offices, bedrooms restaurants and cafeterias. Even though the town is older town in the
region Sarbo town seems to have no developed mixed use building, the existing supply is
far behind the growing demand for standard service. Hence, the project will solve the
serous demand problem in the town.

Over the last decade, there has been a significant growth in the number of local and
international trades across the country. Merchant from Jimma town from central market
and foreign trader starts to come to the town. This increase is mainly associated with the
stimulation of economic activist and partly due to an increase in the flow of international
and local traders in to the town. Since Sarbo town is an important commercial center in
addition there is a significant increase in business activates and hence increasing the
number of traders to the town. Even though there is a lack of quantitative estimates that
number of traders to the town. Even though there is a lack of quantitative estimates that
depict the actual demand and also the annual growth rate Hotel facilities and urban
commercial facilities are scarce in the city. So far in the town there is no development of
such kind standard building and it is the first of its kind in the town and will promote other
investors from the town and the surrounding areas. They are mostly villa type premises
modified as show rooms and sailing posits. As a result there is a large gap between the
developed and that of the supply for modern bed rooms; Bank and cafeteria
accommodation hence this project would not face any problem of demand scarcity for it
business centre and it would provide good service to customers.

3.3. Current supply of mixed use building


Commercial building/office sector has shown a dynamic change in the past few years. The
reason for this could be rapid economic growth and a supporting public infrastructural
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

development. Other factors relevant in the specific case of commercial buildings are the
large increases in national and international businesses, particularly firms in the services
sector.

The business of multipurpose buildings in Sarbo Town in booming highly due to the recent
rapid growth experienced in Ethiopia. As a result, a good number of local and international
organizational are coming in place. Government offices which used to operate in limited
spaces all over the city are also concentrating on leasing new and modern buildings.
Increasing numbers of international organization and NGOs which in the past had typically
converted residences into office space are now moving towards renting whole floors or
even multiple floors in modern city-center commercial buildings.

3.4. Future market or Demand of commercial Building rental


The demand for office space is a derived demand because firms rent space as an input to
the production of services or goods they provide to businesses and households in the local
regional or national economy.

Following our survey of office space users in Sarbo town are mainly firms providing
banking, cafeteria and restaurants, bed room, supermarkets service, computer Center
Crevice. The different customers for commercial buildings also include shops and offices
that are currently renting out to provide their goods and services.

Future demand for office space is actually driven from growth in number of offices in the
city which in turn is influenced by the macro-economic growth in the country. Following
the government five year growth and transformation plan (GTP), the Ethiopian economy
is expected to increase by 11% for base case scenario and 14% under the optimistic case
scenario. Assuming that demand for office space is directly related to the growth in the
economy, the forecast for office space demand is shown in the following table;

Table 1.Office Space Demand Forecast


Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

Office space demand under Office space demand under high

base case economic case economic

Years Growth Growth

2010/2011 9,916,543 11,304,859

2011/2012 11,007,363 12,057,416

2012/2013 12,218,173 12,953,878

2013/2014 13,562,173 13,963,577

2014/2015 15,054,011 14,554,534

2015/2016 16,709,952 14,987,431

Source: estimation based on GTP’s forecasted Ethiopian Economic Growth

3.5. Target customers


The target customers of this envisaged project include:-

1. business Community

2. Nearby business organization

3. Bank and financial institution

4. the government bureau

5. small accounts(SOHO) SME

6. Nongovernmental organizations

3.6. Marketing promotion and strategy


Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

In order to penetrate and gain considerable market share, one of the major marketing
strategies for the project is consistently rendering quality service to its tenants. Due
emphasis must be placed on improving quality of service and facilities. The major
marketing strategies to promote the project and gain considerable market share include:

 Advertising through different means focusing on the existing service and facilities
using FM radio ,Social Media and newspaper.

 Promote in association to the key location and nearby business

 Using advertising means like Banner, Business card, internet channel and pages.

 Working on public relations to reach and influence key personas and organization
with a capacity of making decision.

 Keeping the quality of its service/ facilities and consistently improving with
changing situations.

 Seasonal discount pricing different others customer centric marketing strategies


will be used by the company.

3.7. Competition
There are different forms of competition that may face the envisaged mixed use building.
These are price and non price based competition.Moreover, there are different competitors
that will compete with the project either directly or indirectly. Mixed Use commercial
building desires to set a precedent in Sarbo town as a full service convenience shop, store
and service rendering with an economical image, offering a wide range of competitively
priced products and services in one location. Need of residents and surrounding population
combined with the consistent popularity of convenience market predict a favorable
business climate for MohammedNazif Aba Mecha Mixed use building.

3.8. The project facilities and Services plan


Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

In order to provide mixed use business center building services of a high standard, it has
been planned to construct and develop the infrastructure and facilities that would viable to
meet the requirements of an international standard business center. Accordingly, various
buildings and facilities will be constructed phase by phase starting with the most needed
ones that are essential to commence the operation of its business activities. With the
completion of construction, the building will provide a combined service such as shops,
bedroom, restaurant and café service as well as modern business center that primarily serve
its guests and major clients.

Table 2.The plan is that the ground will be partitioned in to different rooms:

Building Description UOM Unit price in


Birr

Ground Supermarket, Pharmacy, Banking & Insurance M2 200

1st floor Beauty salon, shop, Computer Center, Cafeteria & M2 200
Restaurant

2nd floor Different governmental, NGO & other offices M2 200

3rd floor Bedrooms service M2 200

Parking Service Car 5/per hour

Total

Since the project will be engaged in mixed building the main sources of its annual revenue
would be from the rental of building spaces such as shops, offices, and banking, café &
restaurant bedrooms. Therefore, the sources of revenue have been classified in to one
category namely the rental of banking & supermarket, offices, shops, bedrooms restaurant
and café based on these classifications. Based on the market price of similar mixed use
building in the area, the envisioned buildings set the following fair price (Before VAT) for
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

its service, hence when the building construction fully get operational it is assumed to
generate a yearly income of ETB 971,662.12.

4. Technical Study

4.1. Description of the project Service/ Product mix


The envisioned mixed purpose building will provide different rental services to the
different customer groups for different purpose. The building will have basement, ground
and eight floors. The purpose of the building explained as follows;

 the ground floor, first floor and second floor designed for different business centers
like banks, supermarket, beauty salon(man and women), Computer center,
pharmacy, internet café, boutiques, different shops and other business activities,

 The third floor designed for bed room services.

Besides, the buildings will have enough parking facility for its customers and green area in
its compound.

4.1.1. Land Use Plan

The total land required for the envisioned project is estimated to be 400 m2 . the total area
for the construction of the building will be 200 m2, as revealed below.

Table 3. Land utilization Plan

SN Description Land M2
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

Ground 1st floor 2nd 3rd


floor Floor

1 Building (G+3)

1.2 Ground 200

1.3 First floor 200

1.4 Second Floor 200

1.5 Third Floor 200

Parking & Green area 200

Total 400

4.2. Construction work and Technology


4.2.1. Construction schedule

The construction project is proposed to be started on February to march 2022, and is


expected to be finished on may 2022. as seen in the abbreviated construction schedule
above, a majority of the schedule’s time is made up of five major activities; Concrete,
building Enclosure, masonry, mechanical & HVAC and Electrical installation. Concrete
activities include processes such as placing foundations and slab on deck.

The Building Enclosure Phase includes erecting the scaffolding that will allow for exterior
sheathing installation and bricklaying.

Mechanical and Electrical install coincide with each other due to the need for coordination
between the two divisions. There are several periods of construction during the schedule
in which there are multiple construction activities occurring at the same time.
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

The construction site must be organized accordingly as these processes take place. As with
any construction project, the goal of the schedule was to complete all construction activities
before the required Date of completion.

This date of completion is practical based on the time of year in which the building will be
completed. The team allowed a two week contingency for any setbacks. Typically, winter
construction tends to cause unforeseen delays that negatively impact a construction project.
These conditions can and will almost undoubtedly impact the project schedule by causing
unforeseen delays and project inefficiency.

4.2.2. Architectural Design & Layout

Although functional spaces for the project were laid out in significant detail, the rest of the
building had designated spaces but n set layouts. It was at the discretion of the project
promoter to devise typical layouts for the non-detailed commercial and office spaces.

To make sure that the building’s layouts were practical, the project owner researched
typical architectural layouts for laboratory and executive office spaces. The walls and
partitions throughout the floor were congruent with the structural frame and column
locations.

4.2.3. Structural design

One of principle deliverables of our project is the structural design of the building. The
structural bays were coordinated with the layout of the building adjustments were made to
the bays if specific layouts are necessary. The frame was made up of a grid with repeating
standard structural bays. Included in the structural system are bay sizes, shape and size of
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

structural members, floor compositions and curtain walls. These elements were established
to resist gravity ad lateral loads as appropriate.

The gravity load design was completed for two frames; one of structural steel and one of
reinforced concrete. The structural steel frame was chosen for further design based on cost
per square foot, local availability of material and constructability considerations, such as
erection and fabrication. The steel system was then designed for lateral loading with
necessary adjustment being made to framing.

4.2.4. Reinforced concrete

The project group prepared hand structural design calculations for a typical bay of a
reinforced concrete frame. In all reinforced concrete bay designs, a superimposed dead
load of 7.5 pounds per square foot was assumed for mechanical equipment, floor coverings
and ceilings.

Similarly, the design of the typical bay accounted for the use of different commercial space,
in which a live load of 125 pounds per square was assumed. Loads were calculated based
on the requirements of the minimum Design loads for Buildings and other Structures.

4.2.5. Foundation Design

The design of a superstructure may be accurate, have considered all possibilities and still
fail because the substructure is incapable of distributing the applied loads to the supporting
soil.

Foundation design takes more into consideration than merely the loading from the columns.
While the main part of the project focused on the structural frame and its alternate designs,
a preliminary foundation plan was designed based upon maximum load carried from the
superstructure through the columns. The foundation design conducted by the project team
consisted of the selection of foundation type, determination of the bearing capacity and the
design for typical interior and exterior spread footings.
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

4.2.6. Construction Plan and process

The project team developed a coordinated project schedule and construction plans that
would reflect the expectations for an actual construction project. The project schedule was
developed using the preliminary designs given to the project team.

Additionally, the group considered typical construction activities and durations taken from
similar construction projects as well as realistic constraints on building development. For
instance, it is necessary for the structural frame to be completed before concrete can be
placed for the slab on deck. Hand drawn construction plans detailing site entrances and
storage areas were coordinated with the project schedule to give the reader visualizations
of the construction site set up through various periods of the construction process.

The construction process for this project is normally a disjointed three mages development
by which the conceptualized need of the promoter of this project is translated into a
functional facility that will meet their needs in terms of time, cost and quality.

Based on a general program of the project owners the consultant who is going to be hired
makes site studies, develops structural designs, prepares drawings and specifications,
determines quantities involved and estimated the resultants costs. All these activities will
be done in the first phase of the project which is the design stage after the document are
produced by the designers have been received, and the works secured the project is
supposed to enter the tendering stage. At this stage contractors study the project document
analyze and subsequently determine the construction methods, built up their unit rates and
submit their bids for the works. The promoter of this project intends to compare the bids
and award the contract for the lowest responsible bidder. This, is of course, presupposes
that the favorable proposal does not exceed the allocated budget.

After the award is made and the contract signed between this project owner and the
contractor, the project constructor is expected to prepare and submits a detailed
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

construction program which includes material schedule, manpower requirement and cash
flow forecast.

After the award is made and the contract signed between this project owner and the
contractor, the project constructor is expected to prepare and submits a detailed
construction program which includes material schedule, manpower requirement and cash
flow forecast.

4.3. Utilities
A number of utilities world be put in place in order to ensure smooth functioning of the
project. These utilities include:

 Water Supply,

 Supplementary Electricity supply.

 Telephone line Internet Broadband

 Fuel, Oil and lubricant

 Drainage Facility

5. Engineering and civil works

5.1. Land, Building and Civil Works


The Mixed use building has a total site area of 400 m2. The building floor area has covered
200 m2 and the remaining 200 m2 is left for greenery and parking. The type of buildings
and its corresponding civil construction cost is given on Table 4.
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

Table 4.List of Building and Civil Works and Their Costs


No Description Total price

A. SUB-
STRACTURE
1 excavation and earth
works 110,324.12

2 concrete work 1,346,000

Sub total 1,456,324.12

B. SUPER
STRACTURE
1 Concrete work 1,100,358.45

2 Block work 252,534.40

3 Roofing 110,193.00

4 Carpentry and joinery 98,760.00

5 Metal works 600,665.00

6 Finishing 1,051,379.44

7 Painting 108,398.88

8 Electrical installation 400,532.00

9 Sanitary installation 750,057.00

Subtotal 4,411,868.17

A+B 5,868,192.29

Vat (15%) 88,231.05

Grand total 6,850,000

As shown on Table 5, the total cost of building and civil work is estimated at Birr 6,850,000
and out of which the proponent has worked more than birr 5.86 million.
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

5.2. Man Power


The total manpower required for the building will be 23 persons. The manpower list and
the corresponding labor cost are shown in part five of this document.

5.2.1. Man Power Requirement

The list of manpower and the annual cost of labor is indicated in Table 5.

Table 5.Manpower Requirement and Annual Labor Cost

SN Position No Qualification Monthly Annual


salary in salary in
Birr Birr

1 General manager 1 BA in management 3000 36,000

2 Building admin 1 BA in Acct/Mgt 2500 30,000

2 Secretary 1 10+2 in secretariat 2000 24,000


science

3 HRM Officer 1 10+2 in 2000 24,000


HRM/Management

6 Finance head 1 BA in Accounting 4500 30,000

4 Technical and 1 Diploma in building 1500 18,000


maintenance maintenance
manager

5 Marketer 1 Diploma in marketing 2000 24,000

6 Accountant 1 Diploma in accounting 2000 24,000

7 Guards/Security 4 Basic 1000 12,000

8 General Service head 1 Diploma in 1500 18,000


Management
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

9 Electrician 1 10+2 in general 1500 18,000


electricity

10 Casher 2 10+1 in bookkeeping 1000 12,000

11 Cleaner 5 Unskilled 750 9,000

12 Maintenance officer 1 10+2 in General 1000 12,000


mechanic

13 Driver 1 10 completed 2000 24,000

Total 23 315,000

Benefit (20%) 63,000

Grand Total 378,000

5.2.1. Labor Availability

Workers for this type of plant are available throughout the year. No foreseeable problems
are expected as most of the work requires no previous skills.

5.3. Project implementation


The project’s implementation is expected to take 24 months. The major activities include
Bank loan processing construction of the building, cleaning the area around the building,
Procurement of equipments and start rendering services. The time schedule for the above
matured major activities is presented below:

Table 6. project Implementation schedule

SN Activities Date
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

1 Land request processing September 2021

2 Land approval October 2021

3 Bank loan processing Novem-dec 2021

4 Site Development January 2022

5 Building and construction work February-March 2022

6 Preparation for service April, -2022

7 Service execution May-June 2022

5.4.Organizational Structure

5.4.1. Organization and management


The organizational structure should be in a way that the company able to achieve its
objectives as well as the satisfaction of standard requirement. In addition to this, the
structure should fit the dynamics of all customers in the building ranging from small
business to large tenants.

Organizational Structure

The organizational structure of the project is designed by including all the necessary
personnel under the right division. At the top of the organizational structure, there will be
manager with the responsibility of supervising the overall activity of the building.
Depending up on the nature of the center and the amount of work to be performs; there
exist auxiliary units under the general manager.
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

Employees under each unit will be supervised by the department head that is accountable
for the general manager. General Manager is appointed by owner.

Owner

General
Manager

Building Admin Marketing Technical and


maintenance
manager

HRM and Promotion


finance IT, Electricity
and plumper

Cashier Purcha
ser

Figure 1.organization structure of the Building


As clearly shown in the organizational structure, the center organization has one general
manager and three main sections. Under the general manager there are the, marketing
Department, maintenance and building administration department.

Under building admin dept there exist two sections i.e., HRM & finance and general
service. Further sub sections are also organized under technical and maintenance manager.
The following section deals with the duties and responsibilities of each department.
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

A. The General Manager’s Duties and Responsibilities

 He/she will plan, organize, direct and control the overall activities of the building.

 He/she will devise policies and strategies that will enable the center to be profitable.

 He/she will incorporate modern technological innovation that will facilitate the service
delivery of the building to increase customer’s satisfaction.

 He/she will plan, organize, direct and control the human and non-human resources of
the building so as to achieve the short and long run objectives of the organization.

B. Building Administration Department

The building Administration Department of the multipurpose building has two main
sections (HRM and Finance and General Service section). It has responsible for
undertaking the following activities;

 Manage the human resources and control employee’s activity

 Well non human resources of the project, which include; effective handling of the
different resources of the building, and devise strategies of controlling against fraud
and damage.

 Will provide the right material or inventory to the center with right price at the right
time.

 Will plan, organize direct and control the financial transaction of the building by
using all the necessary documents.

 Accountant and casher that will collect money from the customers.

 Will develop sound financial control system by developing modern financial


control systems.
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

 Will prepare the annual financial statements and prepare condensed reports for both
the General Manager and other concerned government body.

 Follow the overall status of the business and provide maintenance and repair
services

C. The marketing Department

 Will handle the overall marketing activities of the organization which include
planning, organizing, directing, and controlling.

 Will develop the marketing strategies for future multipurpose building


development

 Will develop effective customer handling strategies.

 Execute the promotion methods.

D. Technical and maintenance manager

 Will handle the overall physical maintenance and related issues

 Will make sure electricity and back up is organized.

 Follow up security issues and educate tenants

 Works in collaboration with general service to make sure tenants are well served

5.5. Financial Requirement and Analysis


The financial resource is a prime resource for undertaking any activities. Hence for
implementing this mixed use building a total of 11,000,083.05 ETB is required. From this
30% (3,300,024.915) birr will be covered by the promoter of the project while the rest 70%
(7,700,058.135) will be covered through loan from bank at the prevailing interest rate.
Therefore the said amount of finance is needed for undertaking the following.
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

5.5.1. Fixed Investment

A. Land, Building & Construction

Table 7. Land, Building & Construction

S.N Description of works Total Cost in birr

1 Building construction 6,850,000.00

2 Site Development 50,000.00

3 Design and supervision 120,000.00

4 1st Year land lease & (10%) 40,396.50


down payment

Total 7,060,396.50

B. Building Machineries and Equipments

Table 8. Building Machineries and Equipments

SN Description Measurement Qty Unit cost in Total cost in


Birr Birr.

1 Generator Unit 1 200,000.00 200,000.00

2 Carpentry tool box Set 1 30,000.00 30,000.00


Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

3 Electrician tools Set 1 18,500.00 25,500.00


box

4 Plumber tools kit Set 1 12,300.00 19,300.00

5 Fire extinguisher Unit 10 6,000.00 80,000.00

(Security Unit 1 40,000.00 40,000.00


Equipment)

6 Total 394,800.00

C. Vehicle

SN Description UOM Qty Unit Cost in Total cost in Remark


Fr. Birr

1 medium Unit 1 1,500,000.00 1,500,000.00 Duty


Truck(FSR) Free

Total 1,500,000.00

D. Office Equipments

Table 9.office equipment

SN Description Measurement Qty Unit cost Total cost


in birr in Birr

1 Managerial tables Unit 5 3,600.00 18,000.00


Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

2 Managerial chairs Unit 5 2,000.00 10,000.00

3 Office table with Unit 7 3,000.00 21,000.00


chair

4 Secretarial table Unit 1 2,500.00 2,500.00


with chairs

5 Computer with Unit 3 28,000.00 84,000.00


chairs

6 Shelf Unit 4,500.00 0.00

7 Filing cabinets Unit 1 3,500.00 3,500.00

8 Guest chairs Unit 1 2000 2,000.00

9 Fax & Telephone Unit 5 2,500.00 12,500.00


machine

10 Carpet and Curtain LS 1 33000 33,000.00

Total 186,500.00

5.5.2..Working Capital

Operating Expense at full Capacity2

Table 10.Operating Expenses


Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

SN List of Items Annual cost List of Items Annual cost in Assumptions Used
in birr birr

1 Audit and legal SN Audit and legal 24,000.00 2000 br/per ,month
fee fee

2 Stationery 1 Stationery 6,000.00 500 br/month


supplies supplies

3 Promotional Cost 2 Promotional Cost 40,000.00 Lump sum annual


cost

4 Property 3 Property 84,009.00 1% of the building


Insurance Insurance

5 Cleaning Supplies 4 Cleaning Supplies 10,800.00 900 br. Per month

6 Uniforms 5 Uniforms 1,670.00 180 per pes for 16


people

7 Water 6 Water 12,600.00 4000m3 by 3.15 br


consumption consumption

8 Electric 7 Electric 12,000.00 20000KWH By


consumption consumption Br.0.4736

9 Fuel 8 Fuel 63,000.00 3000 lit per year by


Br. 21

10 Oil & Iubricants 9 Oil & Iubricants 6,300.00 10% of fuel cost

11 Telephone & fax 10 Telephone & fax 18,000.00 1500 per month

12 Repair expense 11 Repair expense 132,000.00 2% of building cost

13 Miscellaneous 12 Miscellaneous 20,000.00 3000 per month


costs costs

Total 13 Total 430,379.00

Table 11 Pre-service Expenses


SN Description Cost in birr

1 Project proposal & EIA 50,000.00


Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

2 Licensing fee and others

Total 50,000.00

Table 12.Summary of Total initial investment cost


SN Description Cost in Birr

1 Land, building & construction 7,060,396.50

2 machines & Equipments 394,800.00

3 Vehicle 1,500,000.00

4 Office Equipment 186,500.00

Total fixed investment cost 9,141,696.50

6 Salary expense 378,000.00

7 Operation Expense 430,379.00

8 Pre service Expense 50,000.00

Total Working capital 858,379.00

Sub total 10,000,075.50

11 Contingency (10%) 1,000,007.55

Total initial invest. capital 11,000,083.05

6. Financial analysis and Statements


Underlying Assumption
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

The financial analysis of the mixed use building is based on the data provided in the
preceding sections and the following assumptions.

A. construction and finance

construction period 2 Years

source of finance 30% equity and 70 loan

Bank interest rate 10%

B. depreciation

Building 10%

Building machinery and equipment 10%

Office Equipments 10%

6.3.2. Sources of Fund

The source of fund to finance the project is planned to be from two sources. These are
promoter’s equity and bank loan. The loan is expected to be obtained from one of the local
lending institutions. Since the project is expected to take some times to repay all its debts,
the bank loan is assumed to obtain on long term credit basis. Taking the financial position
of the promoters into account, equity contribution and bank loan to finance the total
investment outlays of the project are assumed to be 30% and 70% respectively.
Accordingly, the total financial requirement from the two sources will be;

Table 13.Source of fund.

Owners equity 30% 33,000,24.915


Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

Bank loan 70% 7,700,058.135

Total 100% 11,000,083.05

6.3.3. Bank loan Repayment Schedule

Table 14.Loan repayment schedule

Total
yea Principal Interest rate annual year ending
r payment (8.5%) Payment in balance
ETB

0 7700058.135

1424510.75
1 770005.8135 654504.9415 6930052.322
5

1362140.26
2 773085.8135 589054.4473 6156966.508
1

1296427.96
3 773085.8135 523342.1532 5383880.695
7

1230715.67
4 773085.8135 457629.859 4610794.881
3

1165003.37
5 773085.8135 391917.5649 3837709.068
8

1099291.08
6 773085.8135 326205.2707 3064623.254
4

7 773085.8135 260492.9766 1033578.79 2291537.441

967866.495
8 773085.8135 194780.6824 1518451.627
9
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

902154.201
9 773085.8135 129068.3883 745365.8135
8

10 63356.09415 0

Assumtion

Total loan= 7700058.135

Repayment rate 10year

Annual interest rate 8.50%

6.3.4. Depreciation Schedule

Table 15.Depreciation schedule

SN Description Original Value Depreciation Depreciation per


in Birr rate in % year in Birr

1 Construction and 10 706,039.65


Building 7,060,396.50

2 Bldg. machines & 394,800.00 10 39,480.00


Equipments

3 Vehicle 1,500,000.00 5 75,000.00

4 Office Equipment 186,500.00 10 18,650.00

Total 9,141,696.50 839,169.65


Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

6.2. Financial Statement


6.2.1. Income loss/statement
Project revenue and production costs are listed and compared to see whether the project
generate profits or not. Starting from first year of the project operation, the project will
generate a reasonable amount of net profit for the owners throughout its life period. Profit
and loss statement shows that the project will generate net profit of ETB 133,849.56 in the
first year and increase to ETB 971,662.12 starting from the third year of the project life
and hence it is found to be profitable.

Table 16.Mixed use Building profit/Loss Statement

Revenue Year 1 Year 2 Year 3 year 4 and


after

Rental Income 2,500,000.00 2,600,000.00 3,000,000.00 3,500,000.00

Expenses

Salary Expense 378,000.00 378,000.00 378,000.00 378,000.00

Operating Expenses 430,379.00 430,379.00 430,379.00 430,379.00

Deprecation Bld. Machineries 839,169.65 839,169.65 839,169.65 839,169.65


,Equiq & vehicle

Interest Expense3 654,504.94 589,054.45 523,342.15 457,629.86

Lease payment4 6,732.75 6,732.75 6,732.75 6,732.75

Total Expense 2,308,786.34 2,243,335.85 2,177,623.55 2,111,911.26


Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

Profit before Tax 191,213.66 356,664.15 822,376.45 1,388,088.74

Tax (30%) 57,364.10 106,999.25 246,712.93 416426.6223

Net profit 133,849.56 249,664.91 575,663.51 971,662.12

6.4.2. Cash flow Statement

Table 17.Cash Flow statement

Year Year 0 Year 1 Year 2 Year 3 year 4

Equity Capital 3300024.915

Loan principal 7700058.135

Net sale 0 2,500,000.00 2,600,000.00 3,000,000.00 3,500,000.00

Total Cash in 11,000,083 2,500,000.00 2,600,000.00 3,000,000.00 4,338,400.00


flow

Cash payment

Salary Expense 0 378,000.00 378,000.00 378,000.00 378,000.00

Investment 9,141,697 0 0 0 0

Pre operating 50,000 0 0 0 0


Expense

Operating Cost 0 430,379.00 430,379.00 430,379.00 430,379.00

Loan repayment 0 1,424,510.75 1,362,140.26 1,296,427.97 1,230,715.67

Lease payment 0 6,732.75 6,732.75 6,732.75 6,732.75

Tax payment 0 57,364.10 106,999.25 246,712.93 416,426.62

Total payment 9,191,696.50 1,918,986.60 1,906,251.26 1,980,252.65 2,084,254.04

Cash surplus/ 1,808,386.55 581,013.40 693,748.74 1,019,747.35 2,254,145.96


deficit
Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

Cumulative cash 1,491,638.37 581,013.40 693,748.74 1,019,747.35 2,254,145.96


flow

6.3. Financial analysis


i. Profitability

According to the projected income statement, the building will start generating profit in the
2nd year of operation. Important ration such as profit to total sales, net profit to equity
(Return on equity) and net profit plus interest on total investment (return on total
investment) show as increasing trend during the lifetime of the project. The income
statement and the other indicators of profitability show that the project is viable.

7. Environmental impact of the project


The EIA of the project activities was determined by identifying the environmental aspects
and then undertaking an environmental risk assessment to determine the significant
environmental aspects. The environmental impact assessment has included all phases of
the project namely construction phase and operational phase.

The building has both positive and negative impact

Positive impact of the project

The positive impact of the project is:-

 Generation of employment opportunity

 Source income for the government through business income tax

 Income generation for the promoter


Project Proposal for Mr.MohammedNazif Aba Mecha G+3 Mixed
use Building construction

 Being exemplary for other investors who want to engage in the same business line.

Negative impact of the project

The project has the following negative impacts:

1. noise and Dust emission during Construction

There are some noises during the construction due to the construction operation and
the company will use construct the construction during the day time. Again there is
the emission of dust which will be mitigated by sprinkling water on the service.

2. problem on workers on construction

During construction there are some problems that will materialize on workers. These are:
damage on operation by using machines, construction materials and others. To mitigate
such impact the company will provide safety insurance and safety equipments.

3. sewages during operation

During operation there are some wastes emitting from the mixed use building. These are
wastes from the latrine and will be mitigated by using modern waste treatment technology.