Vendor Quality Audit Guide
Vendor Quality Audit Guide
Theme Focus :
- Drive
Drive Quali
Quality
ty in all aspe
aspects
cts of
of busine
business
ss by revie
reviewin
wing
g rules,
rules, tra
traini
ining
ng
rules and adhering to defined rules
Quality System
3
Importance of Quality Systems
Quality Problems
System
Non
Adherence
70%
Importance of Quality Systems
Serious Quality Problem due to System Non Adherence
System failure
Adherence to Process :-
- Process Control standard (PCS)
- Maruti Inspection Standard (MIS-P)
Adherence to System:-
- Vendor Quality Assurance Manual (VQM)
Quality Systems Assessment by MSIL
Score Criteria
O (Circle) +3 System defined & Implemented
∆ (Traingle) 0 Minor deficiency either in system definition or implementation
X (Cross) -3 Major deficiency either in system definition or implementation
Green
19%
Red
Yellow 18%
63%
2 Regarding 1 Do you implement follow-up to Master Timing plan as per APQP matrix
management / control the schedule and progress Customer events (sample approval, trial
implementatio of production preparation items? dates, SOP at customer end) and
n by production vendor's events (sample submission,
preparation pilot lot submission, SOP)
plan / report Plan Vs Actual updation
(master plan) Micro timing plan matching with
MACRO plan (wrt timing)
Capturing delays in plan v/s actual in
timing plans.
3 Defect 2 Do you review and improve Procedure for FMEA with CFT
prevention on FMEA or Matrix diagrams when approach
the stage of any critical issue occurs after Rating of FMEA as per AIAG
process design SOP?
guidelines and having back up
by using
data for rating. Allocation of
FMEA/Matrix
diagram severity, occurrence & detection as
per AIAG manual
Cut off criteria for taking action as
per latest AIAG manual (actions to
be taken for top 3 RPN processes)
Review of FMEA as per decided
criteria and at decided frequency
•
FAILURE MODE AND EFFECTS ANALYSIS
What is It? (PROCESS FMEA)
•
Process Step n e Current Current
Objective or Purpose
o
i c n
/ Function Potential Potential y
t t Potential n o
i a e i
t
r c
i r Process Process c N
Failure Effect(s) e f
i Causes(s) r e P
v s u t R
Mode of Failure
e s of Failure c Controls Controls e
S l c
Date :
Initial flow period follow
C/M Follow up results
C/M Resp up result
№ Problem Point Reason Countermeasure Impl
Deadline Deptt Confirmatio Confirmatio Confirmatio Confirmatio
date
n : Month n result n : Month n result
6
Clause 1 – Production Preparation
S
Sub Clause S No Check Point Requirement
No
Regulation ② How do you define items required Special controls (increased
2 for special control during initial inspection, increased sample size etc.
initial production control? Do you set at all stages - incoming, in-process &
production stricter inspection methods than the final)
control ordinal inspection?
Scope:
Initial flow control is applicable for newly developed parts or
parts developed after engineering change or after process
change.
Clause 2 – Initial Production Control
Control period:
For newly developed parts – 3 months or 3000parts (whichever is
later)
For ECN/PCN parts – 1 month or 1000parts
(whichever is later)
ECN PCN
SOP SOP SOP
IMPORTANT!
Overall
Responsible
Equipment/
Quality Assurance Manufacturing & Delivery
Tools/Jigs
OK . NG
OK . NG
OK . NG
IMPORTANT!
OK . NG
It is necessary to deploy stringent
checks at respective inspection OK . NG
stages
OK . NG
Clause 2 – Initial Production Control
Exit targets and results:
S. Result
Control Item Target Judgment Remarks
No. Month 1 Month 2 Month 3
1 Customer complaints 0 OK . NG
Result of Initial Production Control OK . NG Initial control checks can be terminated YES . NO
If No, IPC period extended by _______ days, reason for extension ____________________________________________________________
___________________________________________________________________________________________________________________
(please use new sheet for extension period)
End of IPC (Termination)
ENGG PROD PUR PE HOD - QA
Countermeasure:
Checkpoint when any defect occurs
This means that the production can be resumed as per normal controls as specified in control plan.
Clause 3
(4M Change Management)
Clause 3 – Change Management
S S No
Sub Clause Check Point Requirement
No
3.1 Definition and 1 Do you define List of changes that can occur
implementatio unexpected change in process related to 4M.
n of changing (unusual) and planned Distribution of changes into
management change clearly? planned and unplanned
Major Observation:-
4M changes related to man, method and material not
identified clearly.
No clarity on planned and unplanned.
4M
Change
Unplanned
Changes
S S No
Sub Clause Check Point Requirement
No
Major Observation:-
In-house and
Brainstorming Past Defect
customer end
session History
standards
Training
4 M CHANGE CONDITIONS & ACTIONS
Process
Process : Injection Molding,
Molding, Ass embly
embly & Ultrasonic welding
Action Plan
Retroactive
Set up approval
S 4M Inspection
Change Change De t ail Cut off criteria in case of Abnormal Situations
No Category (checking of
(checking of parts
parts before &
after change)
after change)
1 . O p er a to r go i n g o n l ea ve wi th i n ti ma ti on -
Expected
2. Job rotation Yes -
(Planned)
3. New Operator
1 Ma n
Unexpected 1. Operator not abl e to work due to
to
Yes Yes -
(Unplanned) sickness or acci dent
dent
Expected 1. Removal
Removal & Addition of Poka Yoke's
Yoke's
Yes - -
(Planned) 2. Pr eventive
eventive maintenace
1 . Ma c h i n e b r ea k do wn Yes Yes -
Unexpected 1. Use of alternate source material from Not allowed & Customer approval required. All material to be
Yes Yes
(Unplanned) unapproved source* rejected.
3 Ma ter i a l
1.) Immedia tely check & get veri fy the sus pected or affected lot
BO P P a r ts Bi n/Tr o l l ey fa l l en d o wn Yes -
Abnormal by QA or demand for new ok lot.
Condition
Any customer
customer compla int received or Check & segregate the whol e lot lyi ng at BAPL for the concerned
Yes Yes
Warranty issue received issue
1. Modification of Jigs/fixtures*
2. Process Change*
Expected Customer approval
approval required & relevant documents to be
3. Proces Sequence Change* Yes -
(Planned) submitted as per MSIL requirements.
4. Sub Supplier Process Change *
5. Despatch Packing Change*
4 Meth od
Check & segregate the whol e lot lyi ng at BAPL for the concerned
Abnormal Any intermittent short shot or molding
Yes Yes issue & if shipped to assy line then check & inform to assy & Q
Condition defect
for concerned issue.
Abnormal
FG Bi n/Tr ol l ey fa l l en d o wn /d a ma ge Yes - Al l Pa r ts to b e c h ec ked whi c h a r e l yi n g i n th a t tr o l l ey/b i n
Condition
Clause 3 – Change
Change Management
S S No
Sub Clause Check Point Requirement
No
3.1 Definition and 3 Do you record
record product Inspection report
report of parts after
implementatio quality check results to change occurrence
n of changing ensure traceability? Records of batch code for
management traceability
4 Do you retroactively
retroactively Comparison of parts before
check about product and after breakdown
quality when unexpected
change occurs?
Major Observation:-
Observation:-
Report contains part checked and found ok.
Content of inspection is not available.
Parts produced before breakdown (Retroactive
(Retroactive parts) are not
checked.
Change item to be
recorded in
standard format
Clause 3 – Change Management
Clause 3 – Change Management
Clause 3 – Change Management
Abnormal conditions Criteria
Process Flow
Layout
Graph
Defect due to 4 M 50
change parts 600 parts 12000 Vehicles
X 1000X
Major Observation:-
4.1 Procedure to 1 Do you make process Prepare control Plan for all the
make process control standards for all part manufactured by your
control products which is company
standards(QA shipped to SMC / MSIL?
process
charts)
Clause 4 – Standard Management
S No Sub Clause S No Check Point Requirement
4.1 Procedure to 2 Do you mention defined Mention both process & product
make process both characteristics of characteristic on control plan?
control quality and production
standards(QA control on the process
process control standards?
charts)
Observation (4.1.2)
Gaps in Standard management
All process characteristics not mentioned in control plan
Clause 4 – Standard Management
S No Sub Clause S No Check Point Requirement
Observation (4.1.3)
Gaps in Standard management
Poka Yoke, Limit sample reference not available in PCS
Clause 4 – Standard Management
PART ASSY ( Write part number of the VENDOR Write your company's name
NAME INDL ( Write part number of the Process Control Standard Wri te seri al no of Wri te total no. of pages
(Write MUL, part number of Write A for and A and F for Functional parts
the assembly) MODEL
PART ASSY at the end of Part Number Write name (s) of mode (s) for
Page No.
(Write MUL, part number of which this part is s upplied
the assembly)
NUMBER INDL
Process Control Standard Control Inspectio Critical Control Sampling Recording
Process Description Machine Spec. n Method Characteri Incharge scheme/ Ye s/ N o
Reamrks
Paramter Spec.
Sl. No. stics
Write check
Write the name of process/ Write For each Write A triangle Write Write if the For critical
Write For each Control frequency e.g.
operation e.g. incoming inspection, result of parameters
type, process control specificati briefly the should be R 100%. N=5
sequence
number
casting, machinging, plating etc . make w rite parameter on must method of marked if Am c=0. Start up Triangle to
checks are
recorded or
write action to
be taken in
control the W (I.e. check 5
of the
For processes w hich are sub-
capacity
etc. of the parameter
w rite the
engineeri
be tighter
than the
checking
e.g. visual process P
pieces at the indicate Critical
not. It will be
better to also
case of
abnormally e.g.
process/ i me of
mention the seggregation,
operation
contracted and for bought out
parts, w rite "sub-contracted"
machine s of both
products
ng standard w ith Go- parameter
is critical
or
I
process
setting and
Process
wayof scrap rework
used e.g. specificati specificati No Go recording e.g. etc.
w ithing brackets below the Hydraulic (e.g. dia, on value on e.g. gauge, (See start if none is
defective).
Characteristics
name of report,
process name. Press 400 hardness measurin legends register, Z.R.
w ith 250 + 7C, N=3, c=0/Hr.
chart etc.
Ton. etc) as tolerance 1.5 + 0.4 g with on bottom (I.e. check 3
For process es related to and w ell as or limits kg/cm2 45 micromete left pieces every
Functional items, w rite or process corner) hour and
e.g. 250, 55 r as per
continue if
respectively at the end of process (e.g. + 10C, 1.5 IS ….. none is
name. funace + 0.5 Etc. defective).
temp. kg/cm2 40 N=10, c=0;
Include sketch of the product pressure LOT (I.e.
60 HRC check 10
at each stage before and after etc.) pieces in each
each process lot and
accept the lot
if none is
defected).
R- Patrol Inspection Write briefly the reson for Date Prepared By Approved By
revision and referevce
AM - Automatic
Measurement Vendor
Legend for W- Operator
control P- Process Approval
Incharge I- Inspector
Write Revision Dates
Clause 4 – Standard Management
S No Sub Clause S No Check Point Requirement
Observation (4.2.1)
Gaps in Standard management
Retention period is not mentioned in procedure
Clause 4 – Standard Management
62
Clause 4 – Standard Management
S No Sub Clause S No Check Point Requirement
Observation (4.2.2)
Gaps in Standard management
Different process/ product characteristics in PCS, WI etc.
Clause 4 (Standard Management)
S No Sub Clause S No Check Point Requirement
4.2 Procedure to 3 Do you make use of lists Do you have the system to control
control to control preparation the revision details of any
standards and revision of document.
standards and share the
・Process updated information?
control
standards
・Inspection
specifications
・Operation
instructions
Observation (4.2.2)
Gaps in Standard management
Revision history not maintained properly.
Revision not captured in document.
Clause 5
(Education & Training)
Clause 5 – Education & Training
Training Process
Skill Development
Contractual Employees
Clause 5 – Education & Training
S S No
Sub Clause Check Point Requirement
No
Work on
Station
Clause 5 – Education & Training
Judgement
Clause 5 – Education & Training
S S No
Sub Clause Check Point Requirement
No
Name of the
Category
Operator
No Instructions
Line No. Proces s Name
Problem Required
Checked b y Designation O X
Classificati Sub Item Plan
Item No. Check Point Remarks
on No. Actual
Coherence between s pecification mentioned in
1
Operation Operation Stand ards co ndition & actual condition.
A
Conditions Whether operator is immediately reading the "display
2
value" and recording them in the check sh eet or not?
Operation Is the operation being carried out as per decided
B 1
Sequence operation s equence or not?
are Quality checks b eing carried o ut an d th e finding are
1
Quality recorded in the ch eck sheet or not?
C
Checks Checks in of "InitialProduct" and "Proper display" for
2
Initial Production are b eing carried o ut or no t?
Equipment Checking of Machine and Equipments is being carried
D 1
Checks out an d check sh eets are duly filled or not?
W orkin g co nd itio n ch ecks are b ein g carried o ut in
regard to device in which Fool proofing are being
1
incorporated, entries are made accordingly in the check
sheets or not?
Equipment Working conditions checks are also being carried out
E 2
Testing for Dies and Jigs o r not?
S S No
Sub Clause Check Point Requirement
No
S S No
Sub Clause Check Point Requirement
No
S S No
Sub Clause Check Point Requirement
No
S S No
Sub Clause Check Point Requirement
No
S S No
Sub Clause Check Point Requirement
No
S S No
Sub Clause Check Point Requirement
No
S S No
Sub Clause Check Point Requirement
No
Observation:-
Gaps in Selection check sheet
S
Sub Clause S No Check Point Requirement
No
Observation (7.2.1)
Gaps in Audits
Audit not planned/ Conducted for all supplier
Observations are not captured in Supplier selection check sheet
No Action plan/ Follow up for open observations
Observation (7.2.2)
Gaps in Development
Inspection Standard not decided with Sub Supplier.
Explanation of Part criticality not evident
Clause 7 – Tier 2 Control
S
Sub Clause S No Check Point Requirement
No
7.2 Management, 3 For outsourced process, Procedure for Supplier Part
quality do you control the development
evaluation and progress of production Monitoring of Part
instruction for preparation and development schedule
suppliers confirmed issues ? ,Capture the delay reasons
and make action plan to meet
the timeline
Monitor the Trial results at
supplier and prepare the
action plan based on CFT
approach.
Observation (7.2.3)
Gaps in Development
APQP Time plan Vs Actual not evident for Sub Supplier parts. Only
inspection reports available.
PPAP Approval not done / delayed
Clause 7 – Tier 2 Control
S Sub Clause S No Check Point Requirement
No
7.2 Management, 4 Do you make suppliers to Procedure to instruct suppliers
quality conduct initial about Initial flow control and
evaluation and production control and its monitoring.
instruction for decide department in
suppliers charge of conduct? Implement Initial Supply
control at supplier end as per
Procedure for new parts/
Change parts/ PCN cases.
Observation (7.2.4)
Gaps in Tier Initial flow control
IFC procedure not evident for Tier 2 Suppliers
Supplier Audit check sheet doesn’t contain related to IFC.
Clause 7 – Tier 2 Control
S Sub Clause S No Check Point Requirement
No
7.2 Management, 5 Regarding the parts Procedure to control the
quality which are shipped outsourced process where
evaluation and directly to the customers Delivery is done directly by
instruction for from outsourced Supplier to customer?
suppliers suppliers, do you have Adherence of Product Quality
method to assure checks as per procedure
product quality
performance?
Observation (7.2.4)
Gaps in Outsourced process
No Gaps .
Clause 7 – Tier 2 Control
S Sub Clause S No Check Point Requirement
No
7.2 Management, 6 Do you make outsourced Procedure for Change
quality suppliers to conduct approval request from
evaluation and initial parts and 4M suppliers & after getting
instruction for changing management change information how do
suppliers and is it possible to you manage the activities at
trace? suppliers end?
Check whether Suppliers is
recording the change
situations & ensuring parts
traceability.
Observation (7.2.4)
Gaps in Change management
Guidelines for changes is not prepared for Sub Suppliers.
Procedure for Change approval request from Sub Suppliers not
available.
Clause 8
(Handling abnormality in
quality)
Clause 8 – Handling abnormality in quality
S S No
Sub Clause Check Point Requirement
No
Major Observation:-
S S No
Sub Clause Check Point Requirement
No
8.1 Handling 2 Do you clarify and Procedure for handing
when standardize the handling customer complaint, internal
abnormal rules/routes for customer rejection & incoming rejection.
situation claims, in process failure
occurs and supplier failure?
Major Observation:-
S S No
Sub Clause Check Point Requirement
No
8.1 Handling 3 Do you have criteria to System for suspected part
when estimate the scope of check.
abnormal suspected lot for abnormal Incase product is prepared by
situation situation? When abnormal multiple dies/molds etc how
occurs situation occurs, do you you narrow down suspected
trace suspected lot based range
upon the criteria?
Major Observation:-
S
S N
Sub Clause Check Point Requirement
No o
Major Observation:-
S
S N
Sub Clause Check Point Requirement
No o
Major Observation:-
S
S N
Sub Clause Check Point Requirement
No o
8.2 Prevention of 3 After corrective action are System for checking the
recurrence taken, do you conduct on- effectiveness of c/ms.
site checkup and evaluate
・Customer claims the effectiveness?
・In process failure
・Suppliers failure
Major Observation:-
S
S N
Sub Clause Check Point Requirement
No o
Major Observation:-
Observation (5.1.1)
Gaps in 5S
Observation (5.1.2)
Gaps in 5S
Identification tag not available.
Similar parts kept together
Parts kept on floor, open environment etc.
Clause 9 – 5S Management
S No Sub Clause S No Check Point Requirement
Observation (5.1.3)
Gaps in 5S
Unidentified material at inspection table, Near machine etc.
Clause 9 – 5S Management
Observation (5.1.4)
Gaps in 5S
Lux level not defined as per IS: 6665
Lux level not monitored in B, C shift
No defined frequency & records for Lux monitoring.
Clause 9 – 5S
5S Management
S No Sub Clause S No Check Point Requirement
Observation (5.2.1)
Gaps in 5S
Unclean machine, Air
Oil leakage from machine.
Clause 9 – 5S
5S Management
S No Sub Clause S No Check Point Requirement
Observation (5.2.2)
Gaps in 5S
Pin missing/ Damage on inspection fixture
Validation of fixture not done as per time
No defined frequency for Pin replacement
Clause 10
(Equipment/
(Equipment/ Inspection
equipment's
management )
Maintenance of Inspection Equipment
Observation (10.1.1)
Gaps in Daily check sheet
Availability of Daily/ Periodic check sheet for all machines, dies,
tools
Objective values are not captured in Daily check sheet.
Actual verification not done just putting √ on check sheet.
Clause 10 – Maintenance
S No Sub Clause S No Check Point Requirement
Observation (7.2.1)
Observation (10.1.1)
Gaps in replacement
Observation (10.1.1)
Gaps in Calibration
Calibration plan vs Actual not adhered
No judgement is taken based on calibration reports
Clause 10 – Maintenance
S No Sub Clause S No Check Point Requirement
Observation (10.1.1)
Gaps in boundary Samples
Boundary sample not stored adequately.
Clause 11
(Implementation of
Standards)
Clause 11 – Implementation of Standards
11.1 Production 1 Do you use easy All process & station should
equipment's expression (visualizer, have operation standard / work
management onomatopoeia ,etc.) for instructions available.
operation instructions? All work instructions should be
So that operator can well defined with pictorial
easily understand display of instructions and
process and critical check points.
points. It is preferrable to have work
instruction in local language so
that operators can easily
understand the content.
Observation (11.1.1)
Gaps in Implementation of Standards
Work instructions not available in English as well as regional
language.
Clause 11 – Implementation of Standards
Observation (11.1.2)
Gaps in Implementation of Standards
Clause 11 – Implementation of Standards
Observation (11.1.3)
Gaps in Implementation of Standards
Observation (11.1.4)
Gaps in Implementation of Standards
Operator
Operator not working as per PCS, WI .
Clause 11 (Implementation of Standards)
Standards)
S No Sub Clause S No Check Point Requirement
Observation (11.1.5)
Gaps in Implementation of Standards
S No
S No Sub Clause Check Point Requirement
Major Observations:-
Major Observations:-
Major Observations:-
Observation (13.1.1)
Gaps in Handling Management
Approved packaging standard not available for child parts.
Clause 13 – Handling Management
S No Sub Clause S No Check Point Requirement
13.1 Bins/ Trolley 2 Are the packaging style Check the bin / trolley and
Management & storage environment storage condition of work-in-
controlled with process, child parts and FG
consideration to parts. It should be able to
contamination control damage and
contamination to the parts.
Observation (13.1.2)
Gaps in Handling Management
Broken bins
Overloaded bins/ trolleys
Bins directly on shop floor
Clause 13 (Handling Management)
S No Sub Clause S No Check Point Requirement
13.1 Bins/ Trolley 3 Do you have system to System defined at supplier for
Management maintain Bins /Trolleys in identification and periodic
Good Condition. maintenance of damaged bins
/ trolleys.
Check if bins / trolleys are
cleaned before keeping FG
parts for despatch to customer.
Observation (13.1.3)
Gaps in Handling Management
Maintenance plan for Bins/ Trolleys
Adequate amount of bins as per production
Bins replacement time needs to be standardized.
Clause 13 (Handling Management)
13.1 Bins/ Trolley 4 Does the Packaging Check for the proper packing
Management method prevent condition of parts to avoid
Transportation damage damage during internal
movement and also during
dispatch to customer.
Observation (13.1.4)