Activated Sludge Design Calculations Date: Project: Units: Engineer: Act. Sludge Process: Design Conditions & Parameters
Activated Sludge Design Calculations Date: Project: Units: Engineer: Act. Sludge Process: Design Conditions & Parameters
Project: City of Las Cruces, New Mexico - Regional Plant Date: 28-Mar-05
Engineer: CDM Units: English
Act. Sludge Process: SEQUOX
Influent Effluent
Flow, MGD 1.000 Retention Time, hours 24.0
BOD5, mg/l 250 10.0 Aeration Tank Volume, Mgal 1.000
BOD5, lbs/day 2,085 83.4 Sludge Age, days 18.0
BODL, mg/l 366 Mixed Liquor Temp., Degrees C 10
TSS, mg/l 250 15.0
TSS, lbs/day 2,085 125.1
Ammonia-N, mg/l 25 1.0
Ammonia-N, lbs/day 209 8.3 Aerobic Digester
Nitrates - N, mg/l 8.0 Volume, % of Aeration Tank 20.0
Nitrates - N, lbs/day 66.7 Maximum MLSS, mg/l 15,000
Maximum MLSS, % 1.50%
Project: City of Las Cruces, New Mexico - Regional Plant Date: 28-Mar-05
Engineer: CDM Units: English
Aeration Type Used: Stainless Steel Coarse Bubble Diffusers
AERATION BASIN
Oxygen Required for BOD Reduction [MGD * mg/l * 8.34 * 1.2], lbs O2/day 2,502
Oxygen Required for BOD Reduction, lbs O2/hr 104.3
Oxygen Req'd for NH3-N Reduction [MGD * mg/l * 4.6 * 8.34], lbs O2/day 959
Oxygen Required for Ammonia Reduction, lbs O2/hr 40.0
Oxygen Density (Amount of Oxygen per ft3 of Air), lbs O2/ft3 0.017480
Transfer Efficiency for Selected Diffusers per Foot of Submergence, % 0.80%
Diffuser Depth Below Water Surface 12.50
AIR REQUIREMENTS
Aeration Pressure, Inches of water 170
psi std 6.1
Assumed air temperature, F 100
Assumed elevation 4,200
Minimum Air Required for Mixing 2,042
SCFM ICFM
Aeration Basin 2,850 3,516
Aerobic Digester Tank 535 535
Selector Tank 40 40
Clarifier 112 112
Total Air Required 3,537 4,203
Total Air Supplied 4,204
HORSEPOWER REQUIREMENTS
Project: City of Las Cruces, New Mexico - Regional Plant Date: 28-Mar-05
Engineer: CDM Units: English
Clarifier Type Used: Split-ClarAtor
FLOW CONDITIONS
RETENTION TIME
Peak Flow, MGD Hourly 2.500 Vol. of In-Basin Surge Storage, gal 38,082
Max. Flow Through Clarifier, MGD 2.240 Vol. of additional Surge Storage
Vol. of Peak Flow entering plant, gal 104,167 required, gal -27,248
Vol. of Flow exiting plant, gal 93,333 Capacity of Surge Storage, hrs 3.5
Excess Peak Flow, gpm 181
AERO-MOD, Inc.
TANKAGE DESIGN CALCULATIONS
Project: City of Las Cruces, New Mexico - Regional Plant Date: 28-Mar-05
Engineer: CDM Units: English
Tank Construction: Cast-in-Place Concrete
SELECTOR TANK
Stage 1 Stage 2
Number of Tanks 2 Number of Tanks 2
Tank Length, ft 75.00 Tank Length, ft 116.3
Tank Width, ft 33.13 Tank Width, ft 20.00
Area of Each Tank, sf 2,484 Area of Each Tank, sf 2,325
Total Volume, gallons 520,328 Total Volume, gallons 486,948
CLARIFIER TANK