Overall Equipment Effectiveness: Guide
Overall Equipment Effectiveness: Guide
Effectiveness
Guide
July 2010
OEE-When to use
Time Available
Plant Operating Time i.e. LMI Mex
10hrs
Planned Subtract
Plant Operating Time Shutdown
Lunch,Breaks,
Maintenace
Subtract
Down Time
Operating Time Loss
•Equipment failure
•Mat. Shortages,
•Changeover time
Speed Subtract
Net Operating Time Loss •Different material, machine wear,
operator inefficiency
Quality Subtract
Fully Productive Time Loss •Rework time
•Scrap
Studies indicate that most manufacturing plants are around 60% performance
in OEE. A world class is considered to be 85% or more.
OEE-Formulas