Tubing String and Installation: Assoc. Prof. Issham Ismail
Tubing String and Installation: Assoc. Prof. Issham Ismail
Tubing String and Installation: Assoc. Prof. Issham Ismail
INSTALLATION
.
SINGLE COMPLETION
MULTIPLE COMPLETIONS
WHAT IS TUBING?
Is a steel pipe installed in an oilwell.
Each tubing is 28 - 32 ft long and available in
many sizes. The most commonly used is 3.5”.
Shorter than 28 ft…called pup joint.
Few hundreds to few thousands tubing are
required for a well, depending on the type of
completion.
Is hung to tubing head via a tubing hanger. Can
you figure out the equipment?
When many tubing are making up
together…called tubing string, may comprise
other subsurface equipment.
TYPES OF TUBING
Standard weight (SW) and heavy weight (HW).
HW is also called thick walled tubing and used in extreme condition.
SW is for normal well and shallow to moderate depth. Used widely in Malaysia.
One single size but has many weights. Refer to tubing table.
2.875” tubing, normally used 6.5#/ft.
with EUE connection!
ID: 2.441”.
Drift diameter: 2.347”.
Grade N-80.
3.5” tubing, normally used 9.2 #/ft.
with premium connection!
ID: 2.992”.
Drift diameter: 2.867”.
Grade N-80.
TUBING SIZE SELECTION
Optimum tubing size is important
undersized will restrict flow/well potential.
Oversized may not produce due to insufficient pressure.
Use IPR curve and TP curve in the same plot.
Use Vogel equation to plot IPR curve…assumptions used!
Use pressure traverse curves to plot TP curve.
Flowrate can be obtained from the intersection of IPR and TP
curves.
Plot many TP curves representing many tubing sizes…select the
highest yield but with region of instability away from IPR curve.
Oilfields in Malaysia use 3.5” tubing strings in 9.625” casing.
TUBING CONNECTION
Two types: Coupling and Integral.
Two types of thread: Standard API and Premium.
Standard API: i.e. EUE and NU. Tubing can be threaded easily.
Premium: Use special insert and higher cost. Has many advantages.
Use tubing hydraulic tong to make-up.
Has their respective torque values.
Standard API thread/connection
EUE is normally used especially for 2.875” tubing.
EUE for 3.5 is seldom…use special clearance type for dual completions.
Premium thread/connection
i.e. VAM, Hydril A-95, TKC 40/40, NK2SC, etc.
Flushed ID.
Commands some premium…more expensive than API thread.
Shoulder-to-shoulder seal. Very delicate.
Many advantages.
TUBING DESIGN
Similar to casing design. Must consider:
Collapse load.
Burst load.
Tension load.
Safety factor.
Tubing elongation
Expand in oil producer…tubing may buckle!
Contraction in water injector…tubing shorten! Equivalent to 30k pull.
May unseat a hydraulic-set packer!
Refer to Tubing Elongation table.
The tubing elongation can be calculated.
TUBING INSPECTION, HANDLING, AND
MAKE-UP
Prior to running the tubing into a well:
Arrange the required number of tubing.
Uncap both ends of each tubing.
Inspect the physical shape and thread at both ends (after cleaning).
Drift ID of every tubing.
Reject defect tubing.
Assign a number to each tubing.
Measure the length of each tubing. Write down the length beside its number.
Apply tubing dope at both ends. Recap both connections.
At the rig floor:
Uncap both ends of the tubing.
Inspect the condition of the thread and physical condition of the tubing.
Make-up tubing using a hydraulic tubing tong. Normally done by torque-turning crew.
The make-up torque is predetermined using computer.
Has output (hard copy) for verification.
Run the tubing into well slowly and carefully. Done by driller.
SUBSURFACE EQUIPMENT
WHAT IS SUBSURFACE EQUIPMENT?
A production/injection is equipped with many
surface and subsurface equipment.
• Safety Valves
SUBSURFACE SAFETY VALVE SYSTEMS
Primary Purpose
Emergency well flow control device
Prevents losses
– Personnel, environment,
reserves, image
Secondary Purpose
Downhole Flow Control
– Allows for wellhead problem
corrections
– Serves as a secondary barrier
SUBSURFACE SAFETY VALVE SYSTEMS
Regulations
API 14 A, Specification for SSSVs
Types of SSSVs
Surface Controlled
• Tubing retrievable
• Slickline retrievable
• Others, pump-in-place: coiled
tubing
Subsurface Controlled
• Velocity
• Injection
FLOW CONTROL EQUIPMENT
Flow couplings.
Blast joint.
Selective landing nipple
No-go landing nipple
Tubing plug
Seal units
FLOW CONTROL EQUIPMENT
(CONT’D)
Check valves - installed in the tubing
string to prevent the back flow of
injection well.
Bottomhole chokes/beans and regulators
- to reduce the wellhead flowing
pressure and prevent the freezing of
surface controls and lines by taking a
pressure drop down hole.
COMMUNICATION EQUIPMENT
Sliding sleeve
Side-pocket gas lift mandrel
AUXILIARY EQUIPMENT