0% found this document useful (0 votes)
332 views127 pages

MS-08Method Statement For Construction of Elevated Rectangular Open Canal

The document provides a method statement for constructing an elevated rectangular open canal as part of the Mahaweli Water Security Investment Program in Sri Lanka. Key points include: 1. The canal will be constructed over existing roads and structures from 5+250km to 22+300km. 2. The method statement details the construction process including forming, reinforcement, and concrete placement. 3. Responsibilities are assigned and safety and environmental measures are outlined. 4. Resources including personnel, equipment, and a construction schedule are allocated for building the elevated canal sections.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
332 views127 pages

MS-08Method Statement For Construction of Elevated Rectangular Open Canal

The document provides a method statement for constructing an elevated rectangular open canal as part of the Mahaweli Water Security Investment Program in Sri Lanka. Key points include: 1. The canal will be constructed over existing roads and structures from 5+250km to 22+300km. 2. The method statement details the construction process including forming, reinforcement, and concrete placement. 3. Responsibilities are assigned and safety and environmental measures are outlined. 4. Resources including personnel, equipment, and a construction schedule are allocated for building the elevated canal sections.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 127

MAHAWEL!

WATER SECURITY INVESTMENT PROGRAM (MWSIP)

CONSTRUCTION OF NORTH WESTERN PROVINCE CANAL PROJECT (NWPCP)


CONSTRUCTION OF MAIN CANAL FROM NEBADAGAHAWATTA TO MAHAKITHULA RESERVOIR
INLET TUNNEL (FROM 5+250 KM TO 22+3OO KM)- NWPCP - ICB-2
APPROVAL SHEET FOR DOCUMENTS PREPARED BY THE CONTRACTOR
Contract No.: MMD E/MWS I P/AD B/NWP CP llCB-2| 3267-3268-S R l/l C B/20 1 7/003
Name of Contractor: China State Construction Enqineering Corporation Ltd.
Approval sheet for the "Method Statement for Construction of Elevated Rectangular
Title of the Document:
Canal"
Method Statement for
Drawing / Document No.: Construction of Elevated Revision: A
Rectangular Canal, M5-008
Received by Letter Ref.: CSC EC-IC82-PMDSC-1 46-2019 Dated: 2019t03t21
Previous Approval Status: Appr. Sheet No.
Present Approval Status: AN Appr. Sheet No. CSCEC-1 46-201 9(Tech, I l)

A= Approved
AN= Approved except as Noted
RR= Return for Correction and Resubmissron

Since the design has been changed for the elevated rectangular canal further comments for the
above submission are as follows.

1. NW-102-C-MS-08 Plan view shows design for previous EADs. Please update for revisions.
2. How to maintain formwork alignments, slope changes specially at the wing walls.
3. How to support wall formwork with base.

(*Note that you can submit only the amended sheets)

The approval of drawings and documents shall not relieve the Contractor of any of his duties, obligations or responsibilities
under the Contract.
Checked by PMDSC

2tto?/r:l?
Date
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)

Construction of Main Canal from Nebadagahawatta


To Mahakithula Reservoir Inlet Tunnel
(From 5+250km to 22+300km).

Method statement for construction of elevated rectangular open canal

MS-008
Rev.A

Contractor: China State Construction Engineering Corp.

No Date Prepared Checked Approved Remark

Rev.A 2019.03.19 Jack Lee Li Jianshuang Hou Jie

Ref.Letter
No :

1
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)

Contents
1. Introduction ..................................................................................................................................3

2. Relevant documents and standards ................................................................................................3

3. Responsibilities for activity describe within this method statement ..................................................3

4. Detailed method of carrying out method statement activity .............................................................4

4.1 Resource allocation ..................................................................................................................4

4.3 Construction method ................................................................................................................5

4.3.1 Construction flow chart ......................................................................................................5

4.3.2 Construction sequence ........................................................................................................6

4.3.3 Construction of formwork and false work ...........................................................................6

4.3.4 Reinforcement work ...........................................................................................................8

4.3.5 Placing and curing of concrete ............................................................................................9

5. Formwork removal ......................................................................................................................11

6. Expansion joint treatment ............................................................................................................12

7. Backfilling works .........................................................................................................................12

8. Quality control measures..............................................................................................................12

9. Safety control measures................................................................................................................13

10. Environmental safeguard measures ..........................................................................................13

2
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)

1. Introduction
The proposed irrigation canal line is going over existing roads and some essential structures
which cannot be removed due to proposed canal. Elevated canal sections are constructing in
those areas to allow required provisions for such kind of structures or roads. The locations of
the elevated canal sections are tabulated below for easy reference.

Location (km+m) Canal structure type Located structures below to canal

17+160 Elevated rectangular open canal Spill approach of Galapitawewa

17+431 Elevated rectangular open canal PS road

The elevated rectangular open canal is mainly consist of few structure parts as specified below

1. Pier foundations
2. Piers
3. Wing wall foundations
4. Wing walls
5. Open rectangular canal bottom slab
6. Open rectangular canal walls

This method statement is explained and confirmed the construction procedure, materials, resource
allocation and relevant documents/ standards used to construct the elevated rectangular open canal

2. Relevant documents and standards


1. The contract signed between CSCEC and ministry of mahaweli development &
environment.
2. The employer’s requirements-drawings
3. The employer’s requirements-specifications

3. Responsibilities for activity describe within this method statement


Construction manager, section manager, section engineer and other relevant personnel within
whose scope of works shall be responsible for referred construction activities in related to
construction of structure works. As well as this work activity shall be carried out according to
the employer’s requirement, approved design drawings, method stipulated in this statement
unless otherwise changed by the Engineer.

3
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)

4. Detailed method of carrying out method statement activity


This method statement is describes the construction methodology of the elevated open
rectangular canal with approved material and equipment. The structure construction works
mainly divided into three parts such as formworks, reinforcement works and Concrete works.
These three major items are again divided into sub items considering construction sequence
and explanation convenience.
4.1 Resource allocation
Resource allocation for construction works shall be included the personnel, equipment and
machinery used during construction. Skilled workers shall be assigned for construction works
to ensure quality of works and to achieve the expected progress of the works. Those structures
are located in section-03. The resources (personnel) allocation for section 03 is as follows.

Table 4.1: Personnel allocation plan for structure construction works.


Section Number Chainage Category Numbers Remarks
Site engineer 01 Chinese
Skilled workers 06 Chinese
Section-03 14+247 to 18+216
TO (tech. officer) 02
Local Labour 36

Table 4.2 Equipment and machinery plan for elevated rectangular open canal construction works.
Equipment Numbers Remarks
Concrete batching plant with relevant 01
machinery and equipments
Concrete pump car 01
Crane 01
Mobile concrete pump stationary concrete 01
pump
Vibrating roller ≥ 10𝑇 02
Hand propelled vibration roller 02
Poker vibrators 06
Generator 15kW 02
Crawler excavator , 150kW 02
Crawler excavator , 65kW 02
Reinforcement bending machine 02
Water bowser 02

4
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)

4.3 Construction method

4.3.1 Construction flow chart


The construction procedure of structures are shown below in flow chart for easy reference.

Figure 01: Construction flow chart

However if any parallel works are required among above work activities as per actual site
conditions, then it shall be followed as per engineer’s instructions and concern.

5
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)

4.3.2 Construction sequence


Mainly six segments are available in the elevated rectangular open canal as listed below.
1. Pier foundations
2. Piers
3. Wing wall foundation
4. Wing walls
5. Open rectangular canal bottom slab
6. Open rectangular canal walls
The construction sequence shall be as shown in following sketches.

Figure 02: Main segments and construction sequence of elevated open rectangular canal

4.3.3 Construction of formwork and false work


The formworks are designed and constructed with allowing easily dismantle and removal from the
casted concrete without shock, disturbance and damages. The formworks are timber or steel.
Timber forms are approved quality, well-seasoned, uniform thickness, sound, free from warps,
loose knots, twists, wavy edges, saps and shakes or other defects affecting the strength of the
formwork and appearance of the finished surface of the structure.
Steel formworks are consisted by panels made up of steel sheet on light steel angle framing in sizes
that can be easily handled.
The false work systems are consisted by scaffolding frames with join pin, GI Pipes, clamps, props
(U-jack, Acrow jack, etc.) or any other material approved by the engineer
The surface finish to be achieved on formed concrete surface shall be defined as shown on the

6
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)

drawings or directed by the Engineer. The selection of material for the formwork, the design of the
formwork and its fixing shall be such as to achieve the required surface finish without any
subsequent remedial work. For the purpose of formwork and false-work design, a value of
25kN/m3 for the density of concrete shall be used.
Formwork and false work shall be true to the required shape and size, shall conform to the
established alignment and grade. As well as formworks and false works shall be constructed with
sufficient strength and rigidity such that they will support the loads imposed on them by the fresh
concrete together with all additional loads imposed by placing and vibrating equipment and by
construction traffic while maintaining their position and shape.
Formwork shall be so designed that it may be easily removed from the work without damage to
the faces of the concrete. It shall also incorporate provisions for making minor adjustments in
position. The formwork of the new lift shall overlap the hardened concrete by not less than 100mm
to prevent abrupt irregularities.

Release agents used for de-moulding shall not stain the concrete or affect its properties in any way.
Before any reinforcement is placed into position within erected formwork and before formwork is
erected adjacent to any fixed reinforcement, the formwork will be thoroughly cleaned and applied
a release agent.
Before concrete placing commences, all wedges and other adjusting devices shall be secured
against movement during concrete placing and the contractor shall maintain careful observation on
the formwork during the concrete pouring to ensure that no movement occurs. The formwork type
basically divided into few different parts considering the construction sequence as shown below

Figure 03: Formwork classifications in elevated open rectangular canal


7
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)

The relevant annex numbers for design calculations are tabulated below for easy reference.
Table 4.3: Reference documents for formwork calculation

Annex Description
number
Annex-01 Design calculations of timber formwork for basement of piers
Annex-02 Design calculations of steel formwork for basement of piers
Annex-03 Design calculations of timber formwork for piers
Annex-04 Design calculations of steel formwork for piers
Annex-05 Design calculations of timber formwork for basement of wing walls
Annex-06 Design calculations of steel formwork for basement of wing walls
Annex-07 Design calculations of timber formwork for wing walls
Annex-08 Design calculations of steel formwork for wing walls
Annex-09 Design calculations of timber formwork for soffit of bottom slab of open
rectangular canal
Annex-10 Design calculations of steel formwork for soffit of bottom slab of open
rectangular canal
Annex-11 Design calculations of timber formwork for side of bottom slab of rectangular
open canal
Annex-12 Design calculations of steel formwork for side of bottom slab of rectangular
open canal
Annex-13 Design calculations of timber formwork for walls of open rectangular canal
Annex-14 Design calculations of steel formwork for walls of open rectangular canal

As well as it is expected to use system formwork in later for structure construction works as per
site requirements to achieve the acceptable progress of the works. However that detail will be
submitted later to the engineer.
4.3.4 Reinforcement work
Reinforcement used in this project will be purchased from qualified supplier. The reinforcement
shall be stored on site separated into the various sizes either in racks or on a hard impermeable
base in such a manner that it remains straight and free from contamination. Reinforcement supplied
by different manufacturers shall be stored separately. Any reinforcement which is likely to remain
in storage for a long period shall be protected from the weather so as to avoid corrosion and pitting.

All the test report and other quality certificate of the reinforcement will be submitted to the
Engineer for checking and approval before using in the permanent works. The reinforcement shall
be cut accurately to length and bend to the shape shown on the approved bar bending schedules
within the acceptable dimensional tolerances. After bending, reinforcement will be thoroughly
cleared, and all dirty, scale, loose rust, oil and other contaminants removed before it is placed in

8
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)

the permanent works, and bars will be securely tied together in bundles or groups and legibly
labeled for easy identification.
Binding with wire will be the main connection patterns, the lap length will conform to the standards
as approved by the Engineer. Reinforcement will be fixed rigidly so that no movement can occur
during concrete placing. The reinforcement bars shall be positioned in right position within a
dimensional tolerance of ±20mm in any direction parallel to a concrete face and within a tolerance
of ±5mm perpendicular to a face, provided that the cover is not thereby decreased below the
minimum shown on the drawings

Spacer blocks shall be used for ensuring that the correct cover is maintained on the reinforcement.
The block shall be as small as practicable and of a shape agreed by the Engineer. As well as
reinforcement bars should be cleaned prior to start the concrete pouring works. All reinforcement
shall be inspected in place and approved by the Engineer before placing the concrete.

In addition to above specifications, the pier foundations should be anchored to the rock by 12mm
diameter anchor road. The anchoring depth shall be 300mm and chemical anchoring method shall
be used as specified in design drawings. The material specifications of anchoring chemical shall
be submitted later to the engineer’s review and approval.

Figure 04: Anchoring connection between pier foundation and rock specified in design drawings
4.3.5 Placing and curing of concrete

No concrete shall be placed at the construction site until all formwork, installation of embedded
parts, reinforcing steel, and surfaces against which concrete is to be cast have been inspected and
a written approval given by the Engineer.
As well as construction joints are formed in structures due to construction sequences which were
explained in above chapters. Those construction joint should be treated to ensure the proper
interface bond with the subsequent concrete lift. Therefore, green cutting shall be carried out for

9
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)

first concrete lift (construction joint) using a high pressure air-water jet. As well as a bonding agent
or starter concrete layer shall be laid over construction joint just before to lay new concrete. The
starter concrete layer shall be prepared by mixing additional 50kg of cement per 1m3 of concrete.
The thickness of starter concrete layer shall be 50mm.

The concrete shall be transported by truck mixers from batching plant to site. The time elapsing
between mixing and placing a batch of concrete shall be as short as practicable. In any case no
longer as will permit completion of placing and compaction before the onset of initial set. If the
placing of any batch of concrete is delayed beyond this period, the concrete shall not be placed in
the permanent works. Concrete left in the trucks, cars or skips has to be completely wasted before
a new concrete batch is loaded.
The mobile concrete pump car, mobile concrete pump stationary concrete pump or crane shall be
used for concrete pumping. The vibrators for use and as standby shall be ample for the requirements
during the placement. Unless otherwise agreed by the Engineer concrete shall not be allowed to
fall freely through a height greater than 1.2 m.

Each layer of concrete shall be compacted by vibration while and after being placed in position to
form a dense, homogeneous material free from voids. The concrete shall be worked up hard against
adjoining surfaces. Each concrete layer shall be vibrated completely before another layer of
concrete is placed upon it. In generally the concrete shall be placed in layers not exceeding 500mm
(R/F concrete) in depth after compaction. As well as any case the thickness of any layer of
concrete shall not be less than four times of the maximum nominal size of aggregate. However if
the layer thickness of concretes are unable to maintain within the above limitation due to any
special case, then contractor shall be obtained engineer’s instruction.

Immersion vibrators shall penetrate the full depth of the layer and shall enter the underlying layer
so as to ensure proper integration of successive layers. They shall be inserted in a near-vertical
position at sufficiently close regular intervals, which shall be within the distance over which
vibration is visibly effective and in any case shall not exceed 600 mm, for long enough time to
ensure proper compaction, and shall be withdrawn slowly to prevent the formation of voids. The
concrete shall be vibrated until it presents a compact reflecting surface and the bubbles of entrapped
air have ceased to escape. Over-vibration causing to segregation, surface laitance, or leakage of
grout through formwork.

10
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)

Figure 05: Placing of immersion vibrators

The maximum permitted temperature rises and the temperature distribution in concrete after
placement will be determined by the Engineer based on the laboratory test performed prior to
start of concrete work using the actual cement, concrete mix proportions, and diffusivity for the
concrete under consideration, and/or by actual field monitoring.

Concrete shall be protected during the first stage of hardening from loss of moisture and from the
development of temperature differentials within the concrete sufficient to cause cracking. The
methods used for curing shall not cause damage of any kind to the concrete.

The curing shall be carried out using approved curing agent and water curing. Curing shall be
continued for as long as may be necessary to achieve the above objectives. All concrete shall be
cured for a period of not less than 14 consecutive days or until the concrete is covered by later
construction, whichever is the shorter period.

5. Formwork removal
It is the contractor’s sole responsibility to avoid damages to concrete surfaces during the form work
ejecting process. Since several type of basic structural elements are available in elevated
rectangular open canal structures and the formwork & false work periods are different from
structure to structure. The time for formwork removal specified in specification (Clause 3.2.2.6) is
as follows. But these periods are subjected to engineer’s prior approval. As well as all the defect
and other required repairs should be carried out using approved repair materials.

Table 5.1: Time for the formwork removal


Position of Formwork Minimum Minimum strength
time (days) to be attained
Vertical or near vertical faces of reinforced walls , beams 2 0.40 fc
and columns
Underside of arches, beams and slabs (formwork only) 9 0.75 fc
Supports (props) to underside of arches, beams and slabs 14 0.90 fc

11
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)

6. Expansion joint treatment


There are two expansion joints at two ends of elevated canal section to achieve the safety of the
structure due to differential settlement and/or thermal expansion of the concrete. Those joint
locations are clearly shown in design drawings and approved water stops should be installed during
concreting works. The specifications of water stops were submitted to the engineer through
CSCEC-CMS-006. The joint type –“1A” shall be adopted for expansion joint as shown below.

Figure 06: Specification of expansion joint type “1A”

7. Backfilling works
After completion of the structure, tie holes, defects and repairing works shall be finished and should
be obtained the engineer’s concern. Prior to start the backfill, the excavated area shall be dewatered
until filled bed exposes. The debris and other unsuitable materials within the excavation area
should be removed before to start backfilling work. The back filling works shall be carried out
layer by layer and the compaction shall be checked timely as per engineer’s requirements. The
light compaction machines and equipment are used to compact the back fill soil adjacent to the
structure. The backfilling work is carried out both sides simultaneously. The backfilling area and
soil type shall be as specified in design drawings.

8. Quality control measures

1. The construction must be implemented strictly according to the approved drawings and
specifications.
2. Material shall be strictly in compliance mentioned herein the method statement and design
drawings.
3. Reinforcements are only from approved suppliers, brands, and in an acceptable conditions,

12
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)

free from dirt, corrosion, grease and oil.


4. Cube samples will be collected 3 per each 10 m3 and for each new pouring.
5. Slump of the concrete before pouring shall comply with the mix design requirements
6. After reinforcement fabrication completed, Engineer’s inspection will be called upon to
check the reinforcement fabrication in accordance with the design drawing.
7. During the concrete pouring, internal vibrators are used adequately.
8. The concrete pouring work will be carried out in approved manner, the layer thickness
and time duration between two pouring will be strictly controlled.
9. The structure back filling will be strictly according to the approved drawing

9. Safety control measures


1. Site staffs are allowed to enter the construction site only with all necessary PPE (Personal
Protective Equipment).
2. All the tools, equipment and machinery shall be maintained regularly.
3. Safety measures must be taken during the excavation close to buildings, facilities’
foundations, electricity posts and scaffolds.
4. The speed and safety distance in between two vehicle should be maintain in acceptable
level at the site. Also the lighter vehicles should give way to heavier vehicles when passing
each other;

5. It is forbidden to stand within the operating area of a running machine. All the operations
of machines shall strictly conform to the regulated process of safety operation.

6. If the soil structure is unstable, collapse happens, water level rises suddenly or any other
dangers occur, then all the site staffs should immediately stop the work and be evacuated
to safe places. They can go back and resume the construction only after the site is
confirmed to be safe.
7. Separate departments will be assigned to maintain the safety regulations at construction
area and they will care and executive all the safety requirements of workers as well as
public.

10. Environmental safeguard measures


The environment safeguard measures to be implemented during elevated open rectangular canal
constructions works are attached in annex for easy reference

13
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)

Annexures

14
Annex 01

TITLE: DESIGN CALCULATIONS OF TIMBER FORMWORK FOR


BASEMENT OF PIERS

1 Calculation of Max Concrete Pressure……………………………………………………………….. 1

2 Calculation of Capacity of Plywood Sheet………………………………………………………….. 2

3 Calculation of Horizontal 100x50mm C14 Timber…………………………………………………….. 3

4 Calculation of Vertical 48mm Dia GI Pipe…………………………………………………….. 4

5 Calculation of Vertical 48mm Dia GI Pipe……………………………………………………….. 5


CCHMET_HZ

PROJECT: North Western Province Canal Project (NWPC/ICB-2)


TITLE: Design of Timber Formwork for Pier Basement
FEATURE: Calculation of Max Concrete Pressure
PREPARED BY : W.A.Indunil
DATE : 18/03/2019

Reference Description Symbol Value Unit


Vertical Formwork Height: H 1.000 m

Vertical Pour Height: h 1.000 m

Weight Density of Concrete: D 25.00 kN/m3

Concrete Temperature at Placing: T 30.00 ℃

Shape of Formwork: Base

Coefficient of Formwork: C1 1.0

Constituent Materials of the Concrete: Type 1

Table 1, CIRIA Coefficient of the Concrete: C2 0.30


Report 108 Placing Speed of Concrete: 18.0 m3/h

Avg Width of base: w 7.30 m

Avg Breadth of base: b 2.90 m

Bottom Area of base A = w b: A 21.17 m2

Rate at Which Concrete Rises Vertically up the Form: R 0.850 m/h

Temperature Coefficient = (36/(T+16))^2: K 0.612

Dh= Dh 25.0 kN/m2


Or, D*(C1*SQRT(R)+C2*K*SQRT((H-C1*SQRT(*R))) = Pmax 24.3 kN/m2

Design Concrete Pressure, Pmax or Dh, which smaller: 24.3 kN/m2

Partial Load Factors for Live Load: - 1.6 kN/m2

Design Pressure [Unfactored]: - 24.3 kN/m2

Design Pressure [Factored]: - 38.9 kN/m2


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Timber Formwork for Pier Basement
FEATURE: Calculation of Plywood Shutter Board
PREPARED BY : W.A.Indunil
DATE : 18/03/2019

Reference Description Symbol Value Unit

For Loading Width: - 1.000 m

Span: L 0.3 m

Plywood Class 1 and 2

Design Pressure [Factored]: - 38.9 kN/m2


Design Loading: q 38.9 kN/m

BS8110-Table 3.12 Max Design Moment = 0.086FL: Mmax 0.30 kNm

Check Shear Stress:


Table 45, BS5268 Shear Capacity of Plywood τv 4.43 N/mm2
Width of Timber: 1000 mm

1000mm Timber Net Section Area: A 15000 mm2


Actual Shear Force = 0.5*q*L: Qmax 5.83 kN

Maximum Shear = Qmax/A: τmax 0.39 N/mm2

Check Shear Stress: τmax < Tv Ok

Check Bending Stress:


Table 45, BS5268 Permissible Bending Stress: σw 17.8 N/mm2

Relevant Axis Section Modulus: W 37500 mm3


Applied Bending Stress = Mmax/W: fb 8.02 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Table 45, BS5268 Young's Modulus of plywood: E 4,750 N/mm2
Net-sectional Moment of Inertia: I 28.13 cm4
Permissible Deflection = L/400: δp 0.75 mm

Actual Deflection = (q*L^4)/(384*E*I): δ 0.61 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Timber Formwork for Pier Basement
FEATURE: Calculation of Vertical 100x50mm C14 Timber
PREPARED BY : W.A.Indunil
DATE : 18/03/2019

Reference Description Symbol Value Unit

For Loading Width: - 0.3 m

Span: L 0.45 m

Strength Class of Timber: C14

Design Pressure [Factored]: - 38.9 kN/m2


Design Loading: q 11.7 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.30 kNm

Check Shear Stress:


Table 7,BS 5268 Shear Capacity of Timber: τv 0.60 N/mm2
Width of Timber: 100.0 mm

100mm Timber Net Section Area: A 5000 mm2


Actual Shear Force = 0.5*q*L: Qmax 2.62 kN

Maximum Shear = Qmax/A: τmax 0.52 N/mm2

Check Shear Stress: Tmax < Tv Ok

Check Bending Stress:


Table 7,BS 5268 Permissible Bending Stress: σw 4.1 N/mm2

Relevant Axis Section Modulus: W 83333 mm3


Applied Bending Stress = Mmax/W: fb 3.54 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Table 7,BS 5268 Young's Modulus of Timber: E 6,800 N/mm2
Net-sectional Moment of Inertia: I 416.67 cm4
Permissible Deflection = L/400: δp 1.13 mm

Actual Deflection = (5*q*L^4)/(384*E*I): δ 0.22 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Timber Formwork for Pier Basement
FEATURE: Calculation of Horizontal 48mm Dia,3.5mm Thick GI Pipe×2
PREPARED BY : W.A.Indunil
DATE : 18/03/2019

Reference Description Symbol Value Unit


For Loading Width: - 0.450 m

Span: L 0.80 m

Design Pressure [Factored]: - 38.9 kN/m2

Design Loading: q(two) 17.50 kN/m

Design Loading: q 8.75 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.70 kNm

Check Shear Stress:


Clause 3.1.1, BS5950/1 Design Strength: Py 235 N/mm2
Diameter of Pipe: 48.0 mm

48mm Diameter Pipe Net Section Area: A 489 mm2


Shear Area = 0.6*A: Av 293 mm2
Clause 4.2.3, BS5950/1 Shear Capacity = 0.6*Py*Av: Pv 41.37 kN

Actual Shear Force = 0.5*q*L: Qmax 3.50 kN

Check Shear Stress: Qmax < Pv Ok

Check Bending Stress:


Permissible Bending Stress: σw 145 N/mm2

Relevant Axis Section Modulus: W 4890 mm3


Applied Bending Stress = Mmax/W: fb 143.12 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 2.67 mm

Actual Deflection = (0.677*q*L^4)/(100*E*I): δ 0.97 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Timber Formwork for Pier Basement
FEATURE: Calculation of Vertical 48mm Dia,3.5mm Thick GI Pipe×2
PREPARED BY : W.A.Indunil
DATE : 18/03/2019

Reference Description Symbol Value Unit


For Loading Width: - 0.800 m

Span: L 0.450 m

Design Pressure [Factored]: - 38.9 kN/m2

Design Loading: q(two) 31.10 kN/m

Design Loading: q 15.55 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.39 kNm

Check Shear Stress:


Clause 3.1.1, BS5950/1 Design Strength: Py 235 N/mm2

Diameter of Pipe: 48.0 mm

48mm Diameter Pipe Net Section Area: A 489 mm2

Shear Area = 0.6*A: Av 293 mm2

Clause 4.2.3, BS5950/1 Shear Capacity = 0.6*Py*Av: Pv 41.37 kN

Actual Shear Force = 0.5*q*L: Qmax 3.50 kN

Check Shear Stress: Qmax < Pv Ok

Check Bending Stress:


Permissible Bending Stress: σw 145 N/mm2

Relevant Axis Section Modulus: W 4890 mm3


Applied Bending Stress = Mmax/W: fb 80.50 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.50 mm

Actual Deflection = (0.677*q*L^4)/(100*E*I): δ 0.17 mm

Check Actual Deflection: δ < δp Ok


Annex 02

TITLE: DESIGN CALCULATIONS OF STEEL FORMWORK FOR


BASEMENT OF PIERS

1 Calculation of Max Concrete Pressure……………………………………………………………….. 1

2 Calculation of Vertical 48mm Dia GI Pipe…………………………………………………….. 2

3 Calculation of Horizontal 48mm Dia GI Pipe……………………………………………………….. 3


CCHMET_HZ

PROJECT: North Western Province Canal Project (NWPC/ICB-2)


TITLE: Design of Formwork (Steel) for Basement of Piers
FEATURE: Calculation of Max Concrete Pressure
PREPARED BY : W.A.Indunil
DATE : 18/03/2019

Reference Description Symbol Value Unit


Vertical Formwork Height: H 1.000 m

Vertical Pour Height: h 1.000 m

Weight Density of Concrete: D 25.00 kN/m3

Concrete Temperature at Placing: T 30.00 ℃

Shape of Formwork: Base

Coefficient of Formwork: C1 1.0

Constituent Materials of the Concrete: Type 1

Table 1, CIRIA Coefficient of the Concrete: C2 0.30


Report 108 Placing Speed of Concrete: 18.0 m3/h

Avg Width of base: w 2.90 m

Avg Breadth of base: b 7.30 m

Bottom Area of base A = w b: A 21.17 m2

Rate at Which Concrete Rises Vertically up the Form: R 0.850 m/h

Temperature Coefficient = (36/(T+16))^2: K 0.612

Dh= Dh 25.0 kN/m2


Or, D*(C1*SQRT(R)+C2*K*SQRT((H-C1*SQRT(*R))) = Pmax 24.3 kN/m2

Design Concrete Pressure, Pmax or Dh, which smaller: 24.3 kN/m2

Partial Load Factors for Live Load: - 1.6 kN/m2

Design Pressure [Unfactored]: - 24.3 kN/m2

Design Pressure [Factored]: - 38.9 kN/m2


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Formwork (Steel) for Basement of Piers
FEATURE: Calculation of Vertical 48mm Dia,3.5mm Thick GI Pipe×2
PREPARED BY : W.A.Indunil
DATE : 18/03/2019

Reference Description Symbol Value Unit


For Loading Width: - 0.750 m

Span: L 0.600 m

Design Pressure [Factored]: - 38.9 kN/m2

Design Loading: q(two) 29.16 kN/m

Design Loading: q 14.58 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.66 kNm

Check Shear Stress:


Clause 3.1.1, BS5950/1 Design Strength: Py 235 N/mm2

Diameter of Pipe: 48.0 mm

48mm Diameter Pipe Net Section Area: A 489 mm2

Shear Area = 0.6*A: Av 293 mm2

Clause 4.2.3, BS5950/1 Shear Capacity of Channel = 0.6*Py*Av: Pv 41.37 kN

Actual Shear Force = 0.5*q*L: Qmax 4.37 kN

Check Shear Stress: Qmax < Pv Ok

Check Bending Stress:


Permissible Bending Stress: σw 145 N/mm2

Relevant Axis Section Modulus: W 4890 mm3


Applied Bending Stress = Mmax/W: fb 134.17 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 2.00 mm

Actual Deflection = (0.677*q*L^4)/(100*E*I): δ 0.51 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Formwork (Steel) for Basement of Piers
FEATURE: Calculation of Horizontal 48mm Dia,3.5mm Thick GI Pipe×2
PREPARED BY : W.A.Indunil
DATE : 18/03/2019

Reference Description Symbol Value Unit


For Loading Width: - 0.450 m

Span: L 0.750 m

Design Pressure [Factored]: - 38.9 kN/m2

Design Loading: q(two) 17.50 kN/m

Design Loading: q 8.75 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.62 kNm

Check Shear Stress:


Clause 3.1.1, BS5950/1 Design Strength: Py 235 N/mm2
Diameter of Pipe: 48.0 mm

48mm Diameter Pipe Net Section Area: A 489 mm2


Shear Area = 0.6*A: Av 293 mm2
Clause 4.2.3, BS5950/1 Shear Capacity of Channel = 0.6*Py*Av: Pv 41.37 kN

Actual Shear Force = 0.5*q*L: Qmax 3.28 kN

Check Shear Stress: Qmax < Pv Ok

Check Bending Stress:


Permissible Bending Stress: σw 145 N/mm2

Relevant Axis Section Modulus: W 4890 mm3


Applied Bending Stress = Mmax/W: fb 125.79 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 2.50 mm

Actual Deflection = (0.677*q*L^4)/(100*E*I): δ 0.75 mm

Check Actual Deflection: δ < δp Ok


Annex 03

TITLE: DESIGN CALCULATIONS OF TIMBER FORMWORK FOR PIERS

1 Calculation of Max Concrete Pressure……………………………………………………………….. 1

2 Calculation of Capacity of Plywood Sheet………………………………………………………….. 2

3 Calculation of Vertical 100x50mm C14 Timber…………………………………………………….. 3

4 Calculation of Vertical 48mm Dia GI Pipe…………………………………………………….. 4

5 Calculation of Horizontal 48mm Dia GI Pipe……………………………………………………….. 5

6 Calculation of 12mm Dia Tie bars…………………………………………………………………. 6


CCHMET_HZ

PROJECT: North Western Province Canal Project (NWPC/ICB-2)


TITLE: Design of timber formwork for Piers
FEATURE: Calculation of Max Concrete Pressure
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit


Vertical Formwork Height: H 2.500 m

Vertical Pour Height: h 2.500 m

Weight Density of Concrete: D 25.00 kN/m3

Concrete Temperature at Placing: T 30.00 ℃

Shape of Formwork: wall

Coefficient of Formwork: C1 1.0

Constituent Materials of the Concrete: Type 1

Table 1, CIRIA Coefficient of the Concrete: C2 0.30


Report 108 Placing Speed of Concrete: 18.0 m3/h

Avg Width of wall: w 0.900 m

Avg Breadth of wall: b 5.10 m

Bottom Area of wall (bottom) A = w b: A 4.59 m2

Rate at Which Concrete Rises Vertically up the Form: R 3.922 m/h

Temperature Coefficient = (36/(T+16))^2: K 0.612

Dh= Dh 62.5 kN/m2


Or, D*(C1*SQRT(R)+C2*K*SQRT((H-C1*SQRT(*R))) = Pmax 52.8 kN/m2

Design Concrete Pressure, Pmax or Dh, which smaller: 52.8 kN/m2

Table 2, Clause Partial Load Factors for Live Load: - 1.6


2.4, BS 5950 Design Pressure [Unfactored]: - 52.8 kN/m2

Design Pressure [Factored]: - 84.5 kN/m2


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of timber formwork for Piers
FEATURE: Calculation of Plywood Shutter Board
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit

For Loading Width: - 1.000 m

Span: L 0.300 m

Plywood Class 1 and 2

Design Pressure [Factored]: - 84.5 kN/m2

Design Loading: q 84.5 kN/m

BS8110-Table 3.12 Max Design Moment = 0.086FL: Mmax 0.65 kNm

Check Shear Stress:


Table 45, BS5268 Shear Capacity of Plywood τv 4.43 N/mm2
Width of Timber: 1000 mm

1000mm Timber Net Section Area: A 15000 mm2


Actual Shear Force = 0.5*q*L: Qmax 12.67 kN

Maximum Shear = Qmax/A: τmax 0.84 N/mm2

Check Shear Stress: τmax < Tv Ok

Check Bending Stress:


Table 45, BS5268 Permissible Bending Stress: σw 17.8 N/mm2

Relevant Axis Section Modulus: W 37500 mm3


Applied Bending Stress = Mmax/W: fb 17.44 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Table 45, BS5268 Young's Modulus of plywood: E 4,750 N/mm2

Net-sectional Moment of Inertia: I 28.13 cm4

Permissible Deflection = L/400: δp 0.75 mm

Actual Deflection = (q*L^4)/(384*E*I): δ 0.63 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of timber formwork for Piers
FEATURE: Calculation of Horizontal 100x50mm C14 Timber
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit

For Loading Width: - 0.25 m

Span: L 0.275 m

Strength Class of Timber: C14

Design Pressure [Factored]: - 84.5 kN/m2

Design Loading: q 21.1 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.20 kNm

Check Shear Stress:


Table 7,BS 5268 Shear Capacity of Timber: τv 0.60 N/mm2
Width of Timber: 100.0 mm

100mm Timber Net Section Area: A 5000 mm2


Actual Shear Force = 0.5*q*L: Qmax 2.90 kN

Maximum Shear = Qmax/A: τmax 0.58 N/mm2

Check Shear Stress: Tmax < Tv Ok

Check Bending Stress:


Table 7,BS 5268 Permissible Bending Stress: σw 4.1 N/mm2

Relevant Axis Section Modulus: W 83333 mm3


Applied Bending Stress = Mmax/W: fb 2.40 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Table 7,BS 5268 Young's Modulus of Timber: E 6,800 N/mm2

Net-sectional Moment of Inertia: I 416.67 cm4

Permissible Deflection = L/400: δp 0.69 mm

Actual Deflection = (5*q*L^4)/(384*E*I): δ 0.06 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of timber formwork for Piers
FEATURE: Calculation of Vertical 48mm Dia,3.5mm Thick GI Pipe×2
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit


For Loading Width: - 0.275 m

Span: L 0.600 m

Design Pressure [Factored]: - 84.5 kN/m2

Design Loading: q(two) 20.91 kN/m

Design Loading: q 10.45 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.47 kNm

Check Shear Stress:


Clause 3.1.1, BS5950/1 Design Strength: Py 235 N/mm2
Diameter of Pipe: 48.0 mm

48mm Diameter Pipe Net Section Area: A 489 mm2


Shear Area = 0.6*A: Av 293 mm2
Clause 4.2.3, BS5950/1 Shear Capacity of Channel = 0.6*Py*Av: Pv 41.37 kN

Actual Shear Force = 0.5*q*L: Qmax 3.14 kN

Check Shear Stress: Qmax < Pv Ok

Check Bending Stress:


Permissible Bending Stress: σw 145 N/mm2

Relevant Axis Section Modulus: W 4890 mm3


Applied Bending Stress = Mmax/W: fb 96.21 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 2.00 mm

Actual Deflection = (0.677*q*L^4)/(100*E*I): δ 0.37 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of timber formwork for Piers
FEATURE: Calculation of Horizontal 48mm Dia,3.5mm Thick GI Pipe×2
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit


For Loading Width: - 0.600 m

Span: L 0.450 m

Design Pressure [Factored]: - 84.5 kN/m2

Design Loading: q(two) 50.69 kN/m

Design Loading: q 25.34 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.64 kNm

Check Shear Stress:


Clause 3.1.1, BS5950/1 Design Strength: Py 235 N/mm2

Diameter of Pipe: 48.0 mm

48mm Diameter Pipe Net Section Area: A 489 mm2

Shear Area = 0.6*A: Av 293 mm2

Clause 4.2.3, BS5950/1 Shear Capacity of Channel = 0.6*Py*Av: Pv 41.37 kN

Actual Shear Force = 0.5*q*L: Qmax 5.70 kN

Check Shear Stress: Qmax < Pv Ok

Check Bending Stress:


Permissible Bending Stress: σw 145 N/mm2

Relevant Axis Section Modulus: W 4890 mm3


Applied Bending Stress = Mmax/W: fb 131.19 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.50 mm

Actual Deflection = (0.677*q*L^4)/(100*E*I): δ 0.28 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of timber formwork for Piers
FEATURE: Calculation of 12mm Tie Rods (Tie bars)
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit


Effective Diameter of Bar 12mm tread bars D 10.00 mm
Loaded with (Spacing) a 0.275 m
Loaded Height b 0.600 m
Loaded Area a*b 0.17 m2
Cross-Sectional Area of a tie bar: A 78.5 mm2
Designed Pressure - 84.5 kN/m2
Total Force on a Tie bar F 13.94 kN
Stress on a Tie Bar f 177.5 N/mm2
Strength of tie rod steel σ w 275 N/mm2
Check the Tie Bar adequacy f < σw Ok

Check For Shear Load:


Weight of plywood sheet w1 0.32 kN
Weignt of 100x50 Timber Battens Per one Plywood
w2 0.64 kN
sheet
GI Pipe Weight (Vertical) w3 0.8 kN
GI Pipe Weight (Horizontal) w4 1.2 kN
Total weight with 1.6 safety factor w 4.7 kN
if one board has 6 Tie bars. These 6 bars bear load
S 0.8 kN
of one panel boards. Thus shear stress on a trie rod

Clause 4.2.3, Shear Strength of Tie rod (Pv=0.6pyA),


Pv 12.96 kN
BS5950 where py=275N/mm2
Check the Tie Bar adequacy S<Pv Ok
Annex 04

TITLE: DESIGN CALCULATIONS OF STEEL FORMWORK FOR PIERS

1 Calculation of Max Concrete Pressure……………………………………………………………….. 1

4 Calculation of Vertical 48mm Dia GI Pipe…………………………………………………….. 2

5 Calculation of Horizontal 48mm Dia GI Pipe……………………………………………………….. 3

6 Calculation of 12mm Dia Tie bars…………………………………………………………………. 4


CCHMET_HZ

PROJECT: North Western Province Canal Project (NWPC/ICB-2)


TITLE: Design of Steel Formwork for Piers
FEATURE: Calculation of Max Concrete Pressure
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit


Vertical Formwork Height: H 2.500 m

Vertical Pour Height: h 2.500 m

Weight Density of Concrete: D 25.00 kN/m3

Concrete Temperature at Placing: T 30.00 ℃

Shape of Formwork: wall

Coefficient of Formwork: C1 1.0

Constituent Materials of the Concrete: Type 1

Table 1, CIRIA Coefficient of the Concrete: C2 0.30


Report 108 Placing Speed of Concrete: 18.0 m3/h

Avg Width of wall: w 0.900 m

Avg Breadth of wall: b 5.10 m

Bottom Area of wall (bottom) A = w b: A 4.59 m2

Rate at Which Concrete Rises Vertically up the Form: R 3.922 m/h

Temperature Coefficient = (36/(T+16))^2: K 0.612

Dh= Dh 62.5 kN/m2


Or, D*(C1*SQRT(R)+C2*K*SQRT((H-C1*SQRT(*R))) = Pmax 52.8 kN/m2

Design Concrete Pressure, Pmax or Dh, which smaller: 52.8 kN/m2

Table 2, Clause Partial Load Factors for Live Load: - 1.6


2.4, BS 5950 Design Pressure [Unfactored]: - 52.8 kN/m2

Design Pressure [Factored]: - 84.5 kN/m2


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Steel Formwork for Piers
FEATURE: Calculation of Vertical 48mm Dia,3.5mm Thick GI Pipe×2
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit


For Loading Width: - 0.375 m

Span: L 0.600 m

Design Pressure [Factored]: - 84.5 kN/m2

Design Loading: q(two) 28.51 kN/m

Design Loading: q 14.26 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.64 kNm

Check Shear Stress:


Clause 3.1.1, BS5950/1 Design Strength: Py 235 N/mm2
Diameter of Pipe: 48.0 mm

48mm Diameter Pipe Net Section Area: A 489 mm2


Shear Area = 0.6*A: Av 293 mm2
Clause 4.2.3, BS5950/1 Shear Capacity = 0.6*Py*Av: Pv 41.37 kN

Actual Shear Force = 0.5*q*L: Qmax 4.28 kN

Check Shear Stress: Qmax < Pv Ok

Check Bending Stress:


Permissible Bending Stress: σw 145 N/mm2

Relevant Axis Section Modulus: W 4890 mm3


Applied Bending Stress = Mmax/W: fb 131.19 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 2.00 mm

Actual Deflection = (0.677*q*L^4)/(100*E*I): δ 0.50 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Steel Formwork for Piers
FEATURE: Calculation of Horizontal 48mm Dia,3.5mm Thick GI Pipe×2
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit


For Loading Width: - 0.600 m

Span: L 0.450 m

Design Pressure [Factored]: - 84.5 kN/m2

Design Loading: q(two) 50.69 kN/m

Design Loading: q 25.34 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.64 kNm

Check Shear Stress:


Clause 3.1.1, BS5950/1 Design Strength: Py 235 N/mm2

Diameter of Pipe: 48.0 mm

48mm Diameter Pipe Net Section Area: A 489 mm2

Shear Area = 0.6*A: Av 293 mm2

Clause 4.2.3, BS5950/1 Shear Capacity = 0.6*Py*Av: Pv 41.37 kN

Actual Shear Force = 0.5*q*L: Qmax 5.70 kN

Check Shear Stress: Qmax < Pv Ok

Check Bending Stress:


Permissible Bending Stress: σw 145 N/mm2

Relevant Axis Section Modulus: W 4890 mm3


Applied Bending Stress = Mmax/W: fb 131.19 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.50 mm

Actual Deflection = (0.677*q*L^4)/(100*E*I): δ 0.28 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Steel Formwork for Piers
FEATURE: Calculation of 12mm Tie Rods (Tie bars)
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit


Effective Diameter of Bar 12mm tread bars D 10.00 mm
Loaded with (Spacing) a 0.3 m
Loaded Height b 0.600 m
Loaded Area a*b 0.18 m2
Cross-Sectional Area of a tie bar: A 78.5 mm2
Designed Pressure - 84.5 kN/m2
Total Force on a Tie bar F 15.21 kN
Stress on a Tie Bar f 193.6 N/mm2
Strength of tie rod steel σ w 275 N/mm2
Check the Tie Bar adequacy f < σw Ok

Check For Shear Load:


Weight of steel panal w1 1.77 kN
Weignt of 100x50 Timber Battens Per one Plywood
w2 - kN
sheet
GI Pipe Weight (Vertical) w3 0.8 kN
GI Pipe Weight (Horizontal) w4 1.2 kN
Total weight with 1.6 safety factor w 6.0 kN
if one board has 6 Tie bars. These 6 bars bear load
S 1.0 kN
of one panel boards. Thus shear stress on a trie rod

Clause 4.2.3, Shear Strength of Tie rod (Pv=0.6pyA),


Pv 12.96 kN
BS5950 where py=275N/mm2
Check the Tie Bar adequacy S<Pv Ok
Annex 05

TITLE: DESIGN CALCULATIONS OF TIMBER FORMWORK FOR


BASEMENT OF WING WALLS

1 Calculation of Max Concrete Pressure……………………………………………………………….. 1

2 Calculation of Capacity of Plywood Sheet………………………………………………………….. 2

3 Calculation of Horizontal 100x50mm C14 Timber…………………………………………………….. 3

4 Calculation of Vertical 48mm Dia GI Pipe…………………………………………………….. 4

5 Calculation of Vertical 48mm Dia GI Pipe……………………………………………………….. 5


CCHMET_HZ

PROJECT: North Western Province Canal Project (NWPC/ICB-2)


TITLE: Design of Timber Formwork for Basement of wing walls
FEATURE: Calculation of Max Concrete Pressure
PREPARED BY : W.A.Indunil
DATE : 18/03/2019

Reference Description Symbol Value Unit


Vertical Formwork Height: H 0.400 m

Vertical Pour Height: h 0.400 m

Weight Density of Concrete: D 25.00 kN/m3

Concrete Temperature at Placing: T 30.00 ℃

Shape of Formwork: Base

Coefficient of Formwork: C1 1.0

Constituent Materials of the Concrete: Type 1

Table 1, CIRIA Coefficient of the Concrete: C2 0.30


Report 108 Placing Speed of Concrete: 18.0 m3/h

Avg Width of base: w 2.65 m

Avg Breadth of base: b 4.00 m

Bottom Area of base A = w b: A 10.60 m2

Rate at Which Concrete Rises Vertically up the Form: R 1.698 m/h

Temperature Coefficient = (36/(T+16))^2: K 0.612

Dh= Dh 10.0 kN/m2


Or, D*(C1*SQRT(R)+C2*K*SQRT((H-C1*SQRT(*R))) = Pmax #NUM! kN/m2

Design Concrete Pressure, Pmax or Dh, which smaller: 10.0 kN/m2

Partial Load Factors for Live Load: - 1.6 kN/m2

Design Pressure [Unfactored]: - 10.0 kN/m2

Design Pressure [Factored]: - 16.0 kN/m2


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Timber Formwork for Basement of wing walls
FEATURE: Calculation of Plywood Shutter Board
PREPARED BY : W.A.Indunil
DATE : 18/03/2019

Reference Description Symbol Value Unit

For Loading Width: - 1.000 m

Span: L 0.4 m

Plywood Class 1 and 2

Design Pressure [Factored]: - 16.0 kN/m2


Design Loading: q 16.0 kN/m

BS8110-Table 3.12 Max Design Moment = 0.086FL: Mmax 0.22 kNm

Check Shear Stress:


Table 45, BS5268 Shear Capacity of Plywood τv 4.43 N/mm2
Width of Timber: 1000 mm

1000mm Timber Net Section Area: A 15000 mm2


Actual Shear Force = 0.5*q*L: Qmax 3.20 kN

Maximum Shear = Qmax/A: τmax 0.21 N/mm2

Check Shear Stress: τmax < Tv Ok

Check Bending Stress:


Table 45, BS5268 Permissible Bending Stress: σw 17.8 N/mm2

Relevant Axis Section Modulus: W 37500 mm3


Applied Bending Stress = Mmax/W: fb 5.87 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Table 45, BS5268 Young's Modulus of plywood: E 4,750 N/mm2
Net-sectional Moment of Inertia: I 28.13 cm4
Permissible Deflection = L/400: δp 1.00 mm

Actual Deflection = (q*L^4)/(384*E*I): δ 0.80 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Timber Formwork for Basement of wing walls
FEATURE: Calculation of Vertical 100x50mm C14 Timber
PREPARED BY : W.A.Indunil
DATE : 18/03/2019

Reference Description Symbol Value Unit

For Loading Width: - 0.813 m

Span: L 0.4 m

Strength Class of Timber: C14

Design Pressure [Factored]: - 16.0 kN/m2


Design Loading: q 13.0 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.26 kNm

Check Shear Stress:


Table 7,BS 5268 Shear Capacity of Timber: τv 0.60 N/mm2
Width of Timber: 100.0 mm

100mm Timber Net Section Area: A 5000 mm2


Actual Shear Force = 0.5*q*L: Qmax 2.60 kN

Maximum Shear = Qmax/A: τmax 0.52 N/mm2

Check Shear Stress: Tmax < Tv Ok

Check Bending Stress:


Table 7,BS 5268 Permissible Bending Stress: σw 4.1 N/mm2

Relevant Axis Section Modulus: W 83333 mm3


Applied Bending Stress = Mmax/W: fb 3.12 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Table 7,BS 5268 Young's Modulus of Timber: E 6,800 N/mm2
Net-sectional Moment of Inertia: I 416.67 cm4
Permissible Deflection = L/400: δp 1.00 mm

Actual Deflection = (5*q*L^4)/(384*E*I): δ 0.15 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Timber Formwork for Basement of wing walls
FEATURE: Calculation of Horizontal 48mm Dia,3.5mm Thick GI Pipe×2
PREPARED BY : W.A.Indunil
DATE : 18/03/2019

Reference Description Symbol Value Unit


For Loading Width: - 0.400 m

Span: L 0.81 m

Design Pressure [Factored]: - 16.0 kN/m2

Design Loading: q(two) 6.40 kN/m

Design Loading: q 3.20 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.26 kNm

Check Shear Stress:


Clause 3.1.1, BS5950/1 Design Strength: Py 235 N/mm2
Diameter of Pipe: 48.0 mm

48mm Diameter Pipe Net Section Area: A 489 mm2


Shear Area = 0.6*A: Av 293 mm2
Clause 4.2.3, BS5950/1 Shear Capacity = 0.6*Py*Av: Pv 41.37 kN

Actual Shear Force = 0.5*q*L: Qmax 1.30 kN

Check Shear Stress: Qmax < Pv Ok

Check Bending Stress:


Permissible Bending Stress: σw 145 N/mm2

Relevant Axis Section Modulus: W 4890 mm3


Applied Bending Stress = Mmax/W: fb 54.07 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 2.71 mm

Actual Deflection = (0.677*q*L^4)/(100*E*I): δ 0.38 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Timber Formwork for Basement of wing walls
FEATURE: Calculation of Vertical 48mm Dia,3.5mm Thick GI Pipe×2
PREPARED BY : W.A.Indunil
DATE : 18/03/2019

Reference Description Symbol Value Unit


For Loading Width: - 0.813 m

Span: L 0.400 m

Design Pressure [Factored]: - 16.0 kN/m2

Design Loading: q(two) 13.01 kN/m

Design Loading: q 6.50 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.13 kNm

Check Shear Stress:


Clause 3.1.1, BS5950/1 Design Strength: Py 235 N/mm2

Diameter of Pipe: 48.0 mm

48mm Diameter Pipe Net Section Area: A 489 mm2

Shear Area = 0.6*A: Av 293 mm2

Clause 4.2.3, BS5950/1 Shear Capacity = 0.6*Py*Av: Pv 41.37 kN

Actual Shear Force = 0.5*q*L: Qmax 1.30 kN

Check Shear Stress: Qmax < Pv Ok

Check Bending Stress:


Permissible Bending Stress: σw 145 N/mm2

Relevant Axis Section Modulus: W 4890 mm3


Applied Bending Stress = Mmax/W: fb 26.60 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.33 mm

Actual Deflection = (0.677*q*L^4)/(100*E*I): δ 0.04 mm

Check Actual Deflection: δ < δp Ok


Annex 06

TITLE: DESIGN CALCULATIONS OF STEEL FORMWORK FOR


BASEMENT OF WING WALLS

1 Calculation of Max Concrete Pressure……………………………………………………………….. 1

2 Calculation of Vertical 48mm Dia GI Pipe…………………………………………………….. 2

3 Calculation of Horizontal 48mm Dia GI Pipe……………………………………………………….. 3


CCHMET_HZ

PROJECT: North Western Province Canal Project (NWPC/ICB-2)


TITLE: Design of Formwork (Steel) for Basement
FEATURE: Calculation of Max Concrete Pressure
PREPARED BY : W.A.Indunil
DATE : 18/03/2019

Reference Description Symbol Value Unit


Vertical Formwork Height: H 0.400 m

Vertical Pour Height: h 0.400 m

Weight Density of Concrete: D 25.00 kN/m3

Concrete Temperature at Placing: T 30.00 ℃

Shape of Formwork: Base

Coefficient of Formwork: C1 1.0

Constituent Materials of the Concrete: Type 1

Table 1, CIRIA Coefficient of the Concrete: C2 0.30


Report 108 Placing Speed of Concrete: 18.0 m3/h

Avg Width of base: w 2.65 m

Avg Breadth of base: b 4.00 m

Bottom Area of base A = w b: A 10.60 m2

Rate at Which Concrete Rises Vertically up the Form: R 1.698 m/h

Temperature Coefficient = (36/(T+16))^2: K 0.612

Dh= Dh 10.0 kN/m2


Or, D*(C1*SQRT(R)+C2*K*SQRT((H-C1*SQRT(*R))) = Pmax #NUM! kN/m2

Design Concrete Pressure, Pmax or Dh, which smaller: 10.0 kN/m2

Partial Load Factors for Live Load: - 1.6 kN/m2

Design Pressure [Unfactored]: - 10.0 kN/m2

Design Pressure [Factored]: - 16.0 kN/m2


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Formwork (Steel) for Basement
FEATURE: Calculation of Vertical 48mm Dia,3.5mm Thick GI Pipe×2
PREPARED BY : W.A.Indunil
DATE : 18/03/2019

Reference Description Symbol Value Unit


For Loading Width: - 0.750 m

Span: L 0.400 m

Design Pressure [Factored]: - 16.0 kN/m2

Design Loading: q(two) 12.00 kN/m

Design Loading: q 6.00 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.12 kNm

Check Shear Stress:


Clause 3.1.1, BS5950/1 Design Strength: Py 235 N/mm2

Diameter of Pipe: 48.0 mm

48mm Diameter Pipe Net Section Area: A 489 mm2

Shear Area = 0.6*A: Av 293 mm2

Clause 4.2.3, BS5950/1 Shear Capacity of Channel = 0.6*Py*Av: Pv 41.37 kN

Actual Shear Force = 0.5*q*L: Qmax 1.20 kN

Check Shear Stress: Qmax < Pv Ok

Check Bending Stress:


Permissible Bending Stress: σw 145 N/mm2

Relevant Axis Section Modulus: W 4890 mm3


Applied Bending Stress = Mmax/W: fb 24.54 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.33 mm

Actual Deflection = (0.677*q*L^4)/(100*E*I): δ 0.04 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Formwork (Steel) for Basement
FEATURE: Calculation of Horizontal 48mm Dia,3.5mm Thick GI Pipe×2
PREPARED BY : W.A.Indunil
DATE : 18/03/2019

Reference Description Symbol Value Unit


For Loading Width: - 0.400 m

Span: L 0.750 m

Design Pressure [Factored]: - 16.0 kN/m2

Design Loading: q(two) 6.40 kN/m

Design Loading: q 3.20 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.23 kNm

Check Shear Stress:


Clause 3.1.1, BS5950/1 Design Strength: Py 235 N/mm2
Diameter of Pipe: 48.0 mm

48mm Diameter Pipe Net Section Area: A 489 mm2


Shear Area = 0.6*A: Av 293 mm2
Clause 4.2.3, BS5950/1 Shear Capacity of Channel = 0.6*Py*Av: Pv 41.37 kN

Actual Shear Force = 0.5*q*L: Qmax 1.20 kN

Check Shear Stress: Qmax < Pv Ok

Check Bending Stress:


Permissible Bending Stress: σw 145 N/mm2

Relevant Axis Section Modulus: W 4890 mm3


Applied Bending Stress = Mmax/W: fb 46.01 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 2.50 mm

Actual Deflection = (0.677*q*L^4)/(100*E*I): δ 0.27 mm

Check Actual Deflection: δ < δp Ok


Annex 07

TITLE: DESIGN CALCULATIONS OF TIMBER FORMWORK FOR WING


WALLS

1 Calculation of Max Concrete Pressure……………………………………………………………….. 1

2 Calculation of Capacity of Plywood Sheet………………………………………………………….. 2

3 Calculation of Vertical 100x50mm C14 Timber…………………………………………………….. 3

4 Calculation of Vertical 48mm Dia GI Pipe…………………………………………………….. 4

5 Calculation of Horizontal 48mm Dia GI Pipe……………………………………………………….. 5

6 Calculation of 12mm Dia Tie bars…………………………………………………………………. 6


CCHMET_HZ

PROJECT: North Western Province Canal Project (NWPC/ICB-2)


TITLE: Design of timber formwork for wing walls
FEATURE: Calculation of Max Concrete Pressure
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit


Vertical Formwork Height: H 2.500 m

Vertical Pour Height: h 2.500 m

Weight Density of Concrete: D 25.00 kN/m3

Concrete Temperature at Placing: T 30.00 ℃

Shape of Formwork: wall

Coefficient of Formwork: C1 1.0

Constituent Materials of the Concrete: Type 1

Table 1, CIRIA Coefficient of the Concrete: C2 0.30


Report 108 Placing Speed of Concrete: 18.0 m3/h

Avg Width of wall: w 0.325 m

Avg Breadth of wall: b 4.00 m

Bottom Area of wall (bottom) A = w b: A 1.30 m2

Rate at Which Concrete Rises Vertically up the Form: R 13.846 m/h

Temperature Coefficient = (36/(T+16))^2: K 0.612

Dh= Dh 62.5 kN/m2


can't solve
Or, D*(C1*SQRT(R)+C2*K*SQRT((H-C1*SQRT(*R))) = Pmax #NUM! kN/m2

Design Concrete Pressure, Pmax or Dh, which smaller: 62.5 kN/m2

Table 2, Clause Partial Load Factors for Live Load: - 1.6


2.4, BS 5950 Design Pressure [Unfactored]: - 62.5 kN/m2

Design Pressure [Factored]: - 100.0 kN/m2


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of timber formwork for wing walls
FEATURE: Calculation of Plywood Shutter Board
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit

For Loading Width: - 1.000 m

Span: L 0.250 m

Plywood Class 1 and 2

Design Pressure [Factored]: - 100.0 kN/m2

Design Loading: q 100.0 kN/m

BS8110-Table 3.12 Max Design Moment = 0.086FL: Mmax 0.54 kNm

Check Shear Stress:


Table 45, BS5268 Shear Capacity of Plywood τv 4.43 N/mm2
Width of Timber: 1000 mm

1000mm Timber Net Section Area: A 15000 mm2


Actual Shear Force = 0.5*q*L: Qmax 12.50 kN

Maximum Shear = Qmax/A: τmax 0.83 N/mm2

Check Shear Stress: τmax < Tv Ok

Check Bending Stress:


Table 45, BS5268 Permissible Bending Stress: σw 17.8 N/mm2

Relevant Axis Section Modulus: W 37500 mm3


Applied Bending Stress = Mmax/W: fb 14.33 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Table 45, BS5268 Young's Modulus of plywood: E 4,750 N/mm2

Net-sectional Moment of Inertia: I 28.13 cm4

Permissible Deflection = L/400: δp 0.63 mm

Actual Deflection = (q*L^4)/(384*E*I): δ 0.63 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of timber formwork for wing walls
FEATURE: Calculation of Horizontal 100x50mm C14 Timber
Prepared By: W.A.Indunil
Date: 21/03/2019

Reference Description Symbol Value Unit

For Loading Width: - 0.25 m

Span: L 0.24 m

Strength Class of Timber: C14

Design Pressure [Factored]: - 100.0 kN/m2

Design Loading: q 25.0 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.18 kNm

Check Shear Stress:


Table 7,BS 5268 Shear Capacity of Timber: τv 0.60 N/mm2
Width of Timber: 100.0 mm

100mm Timber Net Section Area: A 5000 mm2


Actual Shear Force = 0.5*q*L: Qmax 2.99 kN

Maximum Shear = Qmax/A: τmax 0.60 N/mm2

Check Shear Stress: Tmax < Tv Ok

Check Bending Stress:


Table 7,BS 5268 Permissible Bending Stress: σw 4.1 N/mm2

Relevant Axis Section Modulus: W 83333 mm3


Applied Bending Stress = Mmax/W: fb 2.15 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Table 7,BS 5268 Young's Modulus of Timber: E 6,800 N/mm2

Net-sectional Moment of Inertia: I 416.67 cm4

Permissible Deflection = L/400: δp 0.60 mm

Actual Deflection = (5*q*L^4)/(384*E*I): δ 0.04 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of timber formwork for wing walls
FEATURE: Calculation of Vertical 48mm Dia,3.5mm Thick GI Pipe×2
Prepared By: W.A.Indunil
Date: 21/03/2019

Reference Description Symbol Value Unit


For Loading Width: - 0.240 m

Span: L 0.500 m

Design Pressure [Factored]: - 100.0 kN/m2

Design Loading: q(two) 21.60 kN/m

Design Loading: q 10.80 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.34 kNm

Check Shear Stress:


Clause 3.1.1, BS5950/1 Design Strength: Py 235 N/mm2
Diameter of Pipe: 48.0 mm

48mm Diameter Pipe Net Section Area: A 489 mm2


Shear Area = 0.6*A: Av 293 mm2
Clause 4.2.3, BS5950/1 Shear Capacity = 0.6*Py*Av: Pv 41.37 kN

Actual Shear Force = 0.5*q*L: Qmax 2.70 kN

Check Shear Stress: Qmax < Pv Ok

Check Bending Stress:


Permissible Bending Stress: σw 145 N/mm2

Relevant Axis Section Modulus: W 4890 mm3


Applied Bending Stress = Mmax/W: fb 69.02 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.67 mm

Actual Deflection = (0.677*q*L^4)/(100*E*I): δ 0.18 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of timber formwork for wing walls
FEATURE: Calculation of Horizontal 48mm Dia,3.5mm Thick GI Pipe×2
Prepared By: W.A.Indunil
Date: 21/03/2019

Reference Description Symbol Value Unit


For Loading Width: - 0.500 m

Span: L 0.450 m

Design Pressure [Factored]: - 100.0 kN/m2

Design Loading: q(two) 50.00 kN/m

Design Loading: q 25.00 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.63 kNm

Check Shear Stress:


Clause 3.1.1, BS5950/1 Design Strength: Py 235 N/mm2

Diameter of Pipe: 48.0 mm

48mm Diameter Pipe Net Section Area: A 489 mm2

Shear Area = 0.6*A: Av 293 mm2

Clause 4.2.3, BS5950/1 Shear Capacity = 0.6*Py*Av: Pv 41.37 kN

Actual Shear Force = 0.5*q*L: Qmax 5.63 kN

Check Shear Stress: Qmax < Pv Ok

Check Bending Stress:


Permissible Bending Stress: σw 145 N/mm2

Relevant Axis Section Modulus: W 4890 mm3


Applied Bending Stress = Mmax/W: fb 129.41 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.50 mm

Actual Deflection = (0.677*q*L^4)/(100*E*I): δ 0.28 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of timber formwork for wing walls
FEATURE: Calculation of 12mm Tie Rods (Tie bars)
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit


Effective Diameter of Bar 12mm tread bars D 10.00 mm
Loaded with (Spacing) a 0.25 m
Loaded Height b 0.600 m
Loaded Area a*b 0.15 m2
Cross-Sectional Area of a tie bar: A 78.5 mm2
Designed Pressure - 100.0 kN/m2
Total Force on a Tie bar F 15.00 kN
Stress on a Tie Bar f 191.0 N/mm2
Strength of tie rod steel σ w 275 N/mm2
Check the Tie Bar adequacy f < σw Ok

Check For Shear Load:


Weight of plywood sheet w1 0.32 kN
Weignt of 100x50 Timber Battens Per one Plywood
w2 0.64 kN
sheet
GI Pipe Weight (Vertical) w3 0.8 kN
GI Pipe Weight (Horizontal) w4 1.2 kN
Total weight with 1.6 safety factor w 4.7 kN
if one board has 6 Tie bars. These 6 bars bear load
S 0.8 kN
of one panel boards. Thus shear stress on a trie rod

Clause 4.2.3, Shear Strength of Tie rod (Pv=0.6pyA),


Pv 12.96 kN
BS5950 where py=275N/mm2
Check the Tie Bar adequacy S<Pv Ok
Annex 08

TITLE: DESIGN CALCULATIONS OF STEEL FORMWORK FOR WING


WALLS

1 Calculation of Max Concrete Pressure……………………………………………………………….. 1

4 Calculation of Vertical 48mm Dia GI Pipe…………………………………………………….. 2

5 Calculation of Horizontal 48mm Dia GI Pipe……………………………………………………….. 3

6 Calculation of 12mm Dia Tie bars…………………………………………………………………. 4


CCHMET_HZ

PROJECT: North Western Province Canal Project (NWPC/ICB-2)


TITLE: Design of Steel Formwork for wing walls
FEATURE: Calculation of Max Concrete Pressure
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit


Vertical Formwork Height: H 2.500 m

Vertical Pour Height: h 2.500 m

Weight Density of Concrete: D 25.00 kN/m3

Concrete Temperature at Placing: T 30.00 ℃

Shape of Formwork: wall

Coefficient of Formwork: C1 1.0

Constituent Materials of the Concrete: Type 1

Table 1, CIRIA Coefficient of the Concrete: C2 0.30


Report 108 Placing Speed of Concrete: 18.0 m3/h

Avg Width of wall: w 0.325 m

Avg Breadth of wall: b 4.00 m

Bottom Area of wall (bottom) A = w b: A 1.30 m2

Rate at Which Concrete Rises Vertically up the Form: R 13.846 m/h

Temperature Coefficient = (36/(T+16))^2: K 0.612

Dh= Dh 62.5 kN/m2


Or, D*(C1*SQRT(R)+C2*K*SQRT((H-C1*SQRT(*R))) = Pmax can't
#NUM!solve
kN/m2

Design Concrete Pressure, Pmax or Dh, which smaller: 62.5 kN/m2

Table 2, Clause Partial Load Factors for Live Load: - 1.6


2.4, BS 5950 Design Pressure [Unfactored]: - 62.5 kN/m2

Design Pressure [Factored]: - 100.0 kN/m2


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Steel Formwork for wing walls
FEATURE: Calculation of Vertical 48mm Dia,3.5mm Thick GI Pipe×2
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit


For Loading Width: - 0.375 m

Span: L 0.500 m

Design Pressure [Factored]: - 100.0 kN/m2

Design Loading: q(two) 33.75 kN/m

Design Loading: q 16.88 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.53 kNm

Check Shear Stress:


Clause 3.1.1, BS5950/1 Design Strength: Py 235 N/mm2
Diameter of Pipe: 48.0 mm

48mm Diameter Pipe Net Section Area: A 489 mm2


Shear Area = 0.6*A: Av 293 mm2
Clause 4.2.3, BS5950/1 Shear Capacity of Channel = 0.6*Py*Av: Pv 41.37 kN

Actual Shear Force = 0.5*q*L: Qmax 4.22 kN

Check Shear Stress: Qmax < Pv Ok

Check Bending Stress:


Permissible Bending Stress: σw 145 N/mm2

Relevant Axis Section Modulus: W 4890 mm3


Applied Bending Stress = Mmax/W: fb 107.84 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.67 mm

Actual Deflection = (0.677*q*L^4)/(100*E*I): δ 0.28 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Steel Formwork for wing walls
FEATURE: Calculation of Horizontal 48mm Dia,3.5mm Thick GI Pipe×2
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit


For Loading Width: - 0.500 m

Span: L 0.450 m

Design Pressure [Factored]: - 100.0 kN/m2

Design Loading: q(two) 50.00 kN/m

Design Loading: q 25.00 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.63 kNm

Check Shear Stress:


Clause 3.1.1, BS5950/1 Design Strength: Py 235 N/mm2

Diameter of Pipe: 48.0 mm

48mm Diameter Pipe Net Section Area: A 489 mm2

Shear Area = 0.6*A: Av 293 mm2

Clause 4.2.3, BS5950/1 Shear Capacity of Channel = 0.6*Py*Av: Pv 41.37 kN

Actual Shear Force = 0.5*q*L: Qmax 5.63 kN

Check Shear Stress: Qmax < Pv Ok

Check Bending Stress:


Permissible Bending Stress: σw 145 N/mm2

Relevant Axis Section Modulus: W 4890 mm3


Applied Bending Stress = Mmax/W: fb 129.41 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.50 mm

Actual Deflection = (0.677*q*L^4)/(100*E*I): δ 0.28 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Steel Formwork for wing walls
FEATURE: Calculation of 12mm Tie Rods (Tie bars)
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit


Effective Diameter of Bar 12mm tread bars D 10.00 mm
Loaded with (Spacing) a 0.375 m
Loaded Height b 0.500 m
Loaded Area a*b 0.19 m2
Cross-Sectional Area of a tie bar: A 78.5 mm2
Designed Pressure - 100.0 kN/m2
Total Force on a Tie bar F 18.75 kN
Stress on a Tie Bar f 238.7 N/mm2
Strength of tie rod steel σ w 275 N/mm2
Check the Tie Bar adequacy f < σw Ok

Check For Shear Load:


Weight of steel panal w1 1.77 kN
Weignt of 100x50 Timber Battens Per one Plywood
w2 - kN
sheet
GI Pipe Weight (Vertical) w3 0.8 kN
GI Pipe Weight (Horizontal) w4 1.2 kN
Total weight with 1.6 safety factor w 6.0 kN
if one board has 6 Tie bars. These 6 bars bear load
S 1.0 kN
of one panel boards. Thus shear stress on a trie rod

Clause 4.2.3, Shear Strength of Tie rod (Pv=0.6pyA),


Pv 12.96 kN
BS5950 where py=275N/mm2
Check the Tie Bar adequacy S<Pv Ok
Annex 09

TITLE: DESIGN CALCULATIONS OF TIMBER FORMWORK FOR SOFFIT


OF BOTTOM SLAB OF OPEN RECTANGULAR CANAL

1 Calculation of Max Concrete Pressure……………………………………………………………….. 1

2 Calculation of Capacity of Plywood Sheet………………………………………………………….. 2

3 Calculation of Horizontal 48mm Dia GI Pipe……………………………………………………. 3

4 Calculation of Horizontal 100x50mm C14 Timber…………………………………………………….. 4


CCHMET_HZ

PROJECT: North Western Province Canal Project (NWPC/ICB-2)


TITLE: Design of Formwork for Soffit of bottom slab of open rectangular canal
FEATURE: Calculation of Max Concrete Pressure
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit


Top slab thickness H 0.45 m

Weight Density of Concrete: D 25.00 kN/m3

Concrete Temperature at Placing: T 30.00 ℃

Shape of Formwork: Slab

Constituent Materials of the Concrete: Type 1

Design Concrete Pressure 11.3 kN/m2

Assumed loads due to construction activities 5.0 kN/m2

Partial Load Factors for Live Load: - 1.6

Design Pressure [Unfactored]: - 16.3 kN/m2

Design Pressure [Factored]: - 26.0 kN/m2


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Formwork for Soffit of bottom slab of open rectangular canal
FEATURE: Calculation of Plywood Shutter Board
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit

For loading Width: - 1.000 m

Span: L 0.300 m

Plywood Class 1 and 2

Design Pressure [Factored]: - 26.0 kN/m2

Design Loading: q 26.0 kN/m

BS8110-Table 3.12 Max Design Moment = 0.086FL: Mmax 0.20 kNm

Check Shear Stress:


Table 45, BS5268 Shear Capacity of Plywood τv 4.43 N/mm2
Width of Timber: 1000 mm

1000mm Timber Net Section Area: A 15000 mm2


Actual Shear Force = 0.5*q*L: Qmax 3.90 kN

Maximum Shear = Qmax/A: τmax 0.26 N/mm2

Check Shear Stress: τmax < Tv Ok

Check Bending Stress:


Table 45, BS5268 Permissible Bending Stress: σw 17.8 N/mm2

Relevant Axis Section Modulus: W 37500 mm3


Applied Bending Stress = Mmax/W: fb 5.37 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Table 45, BS5268 Young's Modulus of plywood: E 4,750 N/mm2

Net-sectional Moment of Inertia: I 28.13 cm4

Permissible Deflection = L/400: δp 0.75 mm

Actual Deflection = (q*L^4)/(384*E*I): δ 0.41 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Formwork for Soffit of bottom slab of open rectangular canal
FEATURE: Calculation of Horizontal 48mm Dia,3.5mm Thick GI Pipe
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit


For Loading Width: - 0.300 m

Span: L 0.400 m

Design Pressure [Factored]: - 26.0 kN/m2

Design Loading: q(two) 7.80 kN/m

Design Loading: q 7.80 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.16 kNm

Check Shear Stress:


Clause 3.1.1, BS5950/1 Design Strength: Py 235 N/mm2
Diameter of Pipe: 48.0 mm

48mm Diameter Pipe Net Section Area: A 489 mm2


Shear Area = 0.6*A: Av 293 mm2
Clause 4.2.3, BS5950/1 Shear Capacity of Channel = 0.6*Py*Av: Pv 41.37 kN

Actual Shear Force = 0.5*q*L: Qmax 1.56 kN

Check Shear Stress: Qmax < Pv Ok

Check Bending Stress:


Permissible Bending Stress: σw 145 N/mm2

Relevant Axis Section Modulus: W 4890 mm3


Applied Bending Stress = Mmax/W: fb 31.90 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.33 mm

Actual Deflection = (0.677*q*L^4)/(100*E*I): δ 0.05 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Formwork for Soffit of bottom slab of open rectangular canal
FEATURE: Calculation of Vertical 100x50mm C14 Timber
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit

Loading Width: - 0.40 m

Span: L 0.5 m

Strength Class of Timber: C14

Design Pressure [Factored]: - 26.0 kN/m2

Design Loading: q 10.4 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.33 kNm

Check Shear Stress:


Table 7,BS 5268 Shear Capacity of Timber: τv 0.60 N/mm2
Width of Timber: 100.0 mm

100mm Timber Net Section Area: A 5000 mm2


Actual Shear Force = 0.5*q*L: Qmax 2.60 kN

Maximum Shear = Qmax/A: τmax 0.52 N/mm2

Check Shear Stress: Tmax < Tv Ok

Check Bending Stress:


Table 7,BS 5268 Permissible Bending Stress: σw 4.1 N/mm2

Relevant Axis Section Modulus: W 83333 mm3


Applied Bending Stress = Mmax/W: fb 3.90 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Table 7,BS 5268 Young's Modulus of Timber: E 6,800 N/mm2

Net-sectional Moment of Inertia: I 416.67 cm4

Permissible Deflection = L/400: δp 1.25 mm

Actual Deflection = (5*q*L^4)/(384*E*I): δ 0.30 mm

Check Actual Deflection: δ < δp Ok


Annex 10

TITLE: DESIGN CALCULATIONS OF STEEL FORMWORK FOR SOFFIT


OF BOTTOM SLAB OF OPEN RECTANGULAR CANAL

1 Calculation of Max Concrete Pressure……………………………………………………………….. 1

2 Calculation of Capacity of Plywood Sheet………………………………………………………….. 2

3 Calculation of Horizontal 48mm Dia GI Pipe……………………………………………………. 3

4 Calculation of Horizontal 100x50mm C14 Timber…………………………………………………….. 4


CCHMET_HZ

PROJECT: North Western Province Canal Project (NWPC/ICB-2)


TITLE: Design of Formwork for Soffit of bottom slab of open rectangular canal
FEATURE: Calculation of Max Concrete Pressure
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit


Top slab thickness H 0.45 m

Weight Density of Concrete: D 25.00 kN/m3

Concrete Temperature at Placing: T 30.00 ℃

Shape of Formwork: Slab

Constituent Materials of the Concrete: Type 1

Design Concrete Pressure 11.3 kN/m2

Assumed loads due to construction activities 5.0 kN/m2

Partial Load Factors for Live Load: - 1.6

Design Pressure [Unfactored]: - 16.3 kN/m2

Design Pressure [Factored]: - 26.0 kN/m2


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Formwork for Soffit of bottom slab of open rectangular canal
FEATURE: Calculation of Horizontal 48mm Dia,3.5mm Thick GI Pipe
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit


For Loading Width: - 0.300 m

Span: L 0.400 m

Design Pressure [Factored]: - 26.0 kN/m2

Design Loading: q(two) 7.80 kN/m

Design Loading: q 7.80 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.16 kNm

Check Shear Stress:


Clause 3.1.1, BS5950/1 Design Strength: Py 235 N/mm2
Diameter of Pipe: 48.0 mm

48mm Diameter Pipe Net Section Area: A 489 mm2


Shear Area = 0.6*A: Av 293 mm2
Clause 4.2.3, BS5950/1 Shear Capacity of Channel = 0.6*Py*Av: Pv 41.37 kN

Actual Shear Force = 0.5*q*L: Qmax 1.56 kN

Check Shear Stress: Qmax < Pv Ok

Check Bending Stress:


Permissible Bending Stress: σw 145 N/mm2

Relevant Axis Section Modulus: W 4890 mm3


Applied Bending Stress = Mmax/W: fb 31.90 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.33 mm

Actual Deflection = (0.677*q*L^4)/(100*E*I): δ 0.05 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Formwork for Soffit of bottom slab of open rectangular canal
FEATURE: Calculation of Vertical 100x50mm C14 Timber
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit

Loading Width: - 0.40 m

Span: L 0.5 m

Strength Class of Timber: C14

Design Pressure [Factored]: - 26.0 kN/m2

Design Loading: q 10.4 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.33 kNm

Check Shear Stress:


Table 7,BS 5268 Shear Capacity of Timber: τv 0.60 N/mm2
Width of Timber: 100.0 mm

100mm Timber Net Section Area: A 5000 mm2


Actual Shear Force = 0.5*q*L: Qmax 2.60 kN

Maximum Shear = Qmax/A: τmax 0.52 N/mm2

Check Shear Stress: Tmax < Tv Ok

Check Bending Stress:


Table 7,BS 5268 Permissible Bending Stress: σw 4.1 N/mm2

Relevant Axis Section Modulus: W 83333 mm3


Applied Bending Stress = Mmax/W: fb 3.90 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Table 7,BS 5268 Young's Modulus of Timber: E 6,800 N/mm2

Net-sectional Moment of Inertia: I 416.67 cm4

Permissible Deflection = L/400: δp 1.25 mm

Actual Deflection = (5*q*L^4)/(384*E*I): δ 0.30 mm

Check Actual Deflection: δ < δp Ok


Annex 11

TITLE: DESIGN CALCULATIONS OF TIMBER FORMWORK FOR SIDE


OF BOTTOM SLAB OF RECTANGULAR OPEN CANAL

1 Calculation of Max Concrete Pressure……………………………………………………………….. 1

2 Calculation of Capacity of Plywood Sheet………………………………………………………….. 2

3 Calculation of Horizontal 100x50mm C14 Timber…………………………………………………….. 3

4 Calculation of Vertical 48mm Dia GI Pipe…………………………………………………….. 4

5 Calculation of Vertical 48mm Dia GI Pipe……………………………………………………….. 5


CCHMET_HZ

PROJECT: North Western Province Canal Project (NWPC/ICB-2)


TITLE: Design of Timber Formwork for side of bottom slab of rect. Open canal
FEATURE: Calculation of Max Concrete Pressure
PREPARED BY : W.A.Indunil
DATE : 21/03/2019

Reference Description Symbol Value Unit


Vertical Formwork Height: H 0.950 m

Vertical Pour Height: h 0.950 m

Weight Density of Concrete: D 25.00 kN/m3

Concrete Temperature at Placing: T 30.00 ℃

Shape of Formwork: Base

Coefficient of Formwork: C1 1.0

Constituent Materials of the Concrete: Type 1

Table 1, CIRIA Coefficient of the Concrete: C2 0.30


Report 108 Placing Speed of Concrete: 18.0 m3/h

Avg Width of base: w 4.50 m

Avg Breadth of base: b 6.90 m

Bottom Area of base A = w b: A 31.05 m2

Rate at Which Concrete Rises Vertically up the Form: R 0.580 m/h

Temperature Coefficient = (36/(T+16))^2: K 0.612

Dh= Dh 23.8 kN/m2


Or, D*(C1*SQRT(R)+C2*K*SQRT((H-C1*SQRT(*R))) = Pmax 21.0 kN/m2

Design Concrete Pressure, Pmax or Dh, which smaller: 21.0 kN/m2

Partial Load Factors for Live Load: - 1.6 kN/m2

Design Pressure [Unfactored]: - 21.0 kN/m2

Design Pressure [Factored]: - 33.6 kN/m2


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Timber Formwork for side of bottom slab of rect. Open canal
FEATURE: Calculation of Plywood Shutter Board
PREPARED BY : W.A.Indunil
DATE : 21/03/2019

Reference Description Symbol Value Unit

For Loading Width: - 1.000 m

Span: L 0.3 m

Plywood Class 1 and 2

Design Pressure [Factored]: - 33.6 kN/m2


Design Loading: q 33.6 kN/m

BS8110-Table 3.12 Max Design Moment = 0.086FL: Mmax 0.26 kNm

Check Shear Stress:


Table 45, BS5268 Shear Capacity of Plywood τv 4.43 N/mm2
Width of Timber: 1000 mm

1000mm Timber Net Section Area: A 15000 mm2


Actual Shear Force = 0.5*q*L: Qmax 5.04 kN

Maximum Shear = Qmax/A: τmax 0.34 N/mm2

Check Shear Stress: τmax < Tv Ok

Check Bending Stress:


Table 45, BS5268 Permissible Bending Stress: σw 17.8 N/mm2

Relevant Axis Section Modulus: W 37500 mm3


Applied Bending Stress = Mmax/W: fb 6.94 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Table 45, BS5268 Young's Modulus of plywood: E 4,750 N/mm2
Net-sectional Moment of Inertia: I 28.13 cm4
Permissible Deflection = L/400: δp 0.75 mm

Actual Deflection = (q*L^4)/(384*E*I): δ 0.53 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Timber Formwork for side of bottom slab of rect. Open canal
FEATURE: Calculation of Vertical 100x50mm C14 Timber
PREPARED BY : W.A.Indunil
DATE : 21/03/2019

Reference Description Symbol Value Unit

For Loading Width: - 0.3 m

Span: L 0.4 m

Strength Class of Timber: C14

Design Pressure [Factored]: - 33.6 kN/m2


Design Loading: q 10.1 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.20 kNm

Check Shear Stress:


Table 7,BS 5268 Shear Capacity of Timber: τv 0.60 N/mm2
Width of Timber: 100.0 mm

100mm Timber Net Section Area: A 5000 mm2


Actual Shear Force = 0.5*q*L: Qmax 2.02 kN

Maximum Shear = Qmax/A: τmax 0.40 N/mm2

Check Shear Stress: Tmax < Tv Ok

Check Bending Stress:


Table 7,BS 5268 Permissible Bending Stress: σw 4.1 N/mm2

Relevant Axis Section Modulus: W 83333 mm3


Applied Bending Stress = Mmax/W: fb 2.42 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Table 7,BS 5268 Young's Modulus of Timber: E 6,800 N/mm2
Net-sectional Moment of Inertia: I 416.67 cm4
Permissible Deflection = L/400: δp 1.00 mm

Actual Deflection = (5*q*L^4)/(384*E*I): δ 0.12 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Timber Formwork for side of bottom slab of rect. Open canal
FEATURE: Calculation of Horizontal 48mm Dia,3.5mm Thick GI Pipe×2
PREPARED BY : W.A.Indunil
DATE : 21/03/2019

Reference Description Symbol Value Unit


For Loading Width: - 0.400 m

Span: L 0.81 m

Design Pressure [Factored]: - 33.6 kN/m2

Design Loading: q(two) 13.44 kN/m

Design Loading: q 6.72 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.55 kNm

Check Shear Stress:


Clause 3.1.1, BS5950/1 Design Strength: Py 235 N/mm2
Diameter of Pipe: 48.0 mm

48mm Diameter Pipe Net Section Area: A 489 mm2


Shear Area = 0.6*A: Av 293 mm2
Clause 4.2.3, BS5950/1 Shear Capacity = 0.6*Py*Av: Pv 41.37 kN

Actual Shear Force = 0.5*q*L: Qmax 2.72 kN

Check Shear Stress: Qmax < Pv Ok

Check Bending Stress:


Permissible Bending Stress: σw 145 N/mm2

Relevant Axis Section Modulus: W 4890 mm3


Applied Bending Stress = Mmax/W: fb 112.70 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 2.70 mm

Actual Deflection = (0.677*q*L^4)/(100*E*I): δ 0.78 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Timber Formwork for side of bottom slab of rect. Open canal
FEATURE: Calculation of Vertical 48mm Dia,3.5mm Thick GI Pipe×2
PREPARED BY : W.A.Indunil
DATE : 21/03/2019

Reference Description Symbol Value Unit


For Loading Width: - 0.810 m

Span: L 0.400 m

Design Pressure [Factored]: - 33.6 kN/m2

Design Loading: q(two) 27.22 kN/m

Design Loading: q 13.61 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.27 kNm

Check Shear Stress:


Clause 3.1.1, BS5950/1 Design Strength: Py 235 N/mm2

Diameter of Pipe: 48.0 mm

48mm Diameter Pipe Net Section Area: A 489 mm2

Shear Area = 0.6*A: Av 293 mm2

Clause 4.2.3, BS5950/1 Shear Capacity = 0.6*Py*Av: Pv 41.37 kN

Actual Shear Force = 0.5*q*L: Qmax 2.72 kN

Check Shear Stress: Qmax < Pv Ok

Check Bending Stress:


Permissible Bending Stress: σw 145 N/mm2

Relevant Axis Section Modulus: W 4890 mm3


Applied Bending Stress = Mmax/W: fb 55.66 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.33 mm

Actual Deflection = (0.677*q*L^4)/(100*E*I): δ 0.09 mm

Check Actual Deflection: δ < δp Ok


Annex 12

TITLE: DESIGN CALCULATIONS OF STEEL FORMWORK FOR SIDE OF


BOTTOM SLAB OF RECTANGULAR OPEN CANAL

1 Calculation of Max Concrete Pressure……………………………………………………………….. 1

2 Calculation of Vertical 48mm Dia GI Pipe…………………………………………………….. 2

3 Calculation of Horizontal 48mm Dia GI Pipe……………………………………………………….. 3


CCHMET_HZ

PROJECT: North Western Province Canal Project (NWPC/ICB-2)


TITLE: Design of steel Formwork for side of bottom slab of rect. Open canal
FEATURE: Calculation of Max Concrete Pressure
PREPARED BY : W.A.Indunil
DATE : 21/03/2019

Reference Description Symbol Value Unit


Vertical Formwork Height: H 1.000 m

Vertical Pour Height: h 1.000 m

Weight Density of Concrete: D 25.00 kN/m3

Concrete Temperature at Placing: T 30.00 ℃

Shape of Formwork: Base

Coefficient of Formwork: C1 1.0

Constituent Materials of the Concrete: Type 1

Table 1, CIRIA Coefficient of the Concrete: C2 0.30


Report 108 Placing Speed of Concrete: 18.0 m3/h

Avg Width of base: w 2.90 m

Avg Breadth of base: b 7.30 m

Bottom Area of base A = w b: A 21.17 m2

Rate at Which Concrete Rises Vertically up the Form: R 0.850 m/h

Temperature Coefficient = (36/(T+16))^2: K 0.612

Dh= Dh 25.0 kN/m2


Or, D*(C1*SQRT(R)+C2*K*SQRT((H-C1*SQRT(*R))) = Pmax 24.3 kN/m2

Design Concrete Pressure, Pmax or Dh, which smaller: 24.3 kN/m2

Partial Load Factors for Live Load: - 1.6 kN/m2

Design Pressure [Unfactored]: - 24.3 kN/m2

Design Pressure [Factored]: - 38.9 kN/m2


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of steel Formwork for side of bottom slab of rect. Open canal
FEATURE: Calculation of Vertical 48mm Dia,3.5mm Thick GI Pipe×2
PREPARED BY : W.A.Indunil
DATE : 21/03/2019

Reference Description Symbol Value Unit


For Loading Width: - 0.750 m

Span: L 0.600 m

Design Pressure [Factored]: - 38.9 kN/m2

Design Loading: q(two) 29.16 kN/m

Design Loading: q 14.58 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.66 kNm

Check Shear Stress:


Clause 3.1.1, BS5950/1 Design Strength: Py 235 N/mm2

Diameter of Pipe: 48.0 mm

48mm Diameter Pipe Net Section Area: A 489 mm2

Shear Area = 0.6*A: Av 293 mm2

Clause 4.2.3, BS5950/1 Shear Capacity of Channel = 0.6*Py*Av: Pv 41.37 kN

Actual Shear Force = 0.5*q*L: Qmax 4.37 kN

Check Shear Stress: Qmax < Pv Ok

Check Bending Stress:


Permissible Bending Stress: σw 145 N/mm2

Relevant Axis Section Modulus: W 4890 mm3


Applied Bending Stress = Mmax/W: fb 134.17 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 2.00 mm

Actual Deflection = (0.677*q*L^4)/(100*E*I): δ 0.51 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of steel Formwork for side of bottom slab of rect. Open canal
FEATURE: Calculation of Horizontal 48mm Dia,3.5mm Thick GI Pipe×2
PREPARED BY : W.A.Indunil
DATE : 21/03/2019

Reference Description Symbol Value Unit


For Loading Width: - 0.450 m

Span: L 0.750 m

Design Pressure [Factored]: - 38.9 kN/m2

Design Loading: q(two) 17.50 kN/m

Design Loading: q 8.75 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.62 kNm

Check Shear Stress:


Clause 3.1.1, BS5950/1 Design Strength: Py 235 N/mm2
Diameter of Pipe: 48.0 mm

48mm Diameter Pipe Net Section Area: A 489 mm2


Shear Area = 0.6*A: Av 293 mm2
Clause 4.2.3, BS5950/1 Shear Capacity of Channel = 0.6*Py*Av: Pv 41.37 kN

Actual Shear Force = 0.5*q*L: Qmax 3.28 kN

Check Shear Stress: Qmax < Pv Ok

Check Bending Stress:


Permissible Bending Stress: σw 145 N/mm2

Relevant Axis Section Modulus: W 4890 mm3


Applied Bending Stress = Mmax/W: fb 125.79 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 2.50 mm

Actual Deflection = (0.677*q*L^4)/(100*E*I): δ 0.75 mm

Check Actual Deflection: δ < δp Ok


Annex 13

TITLE: DESIGN CALCULATIONS OF TIMBER FORMWORK FOR WALLS


OF OPEN RECTANGULAR CANAL

1 Calculation of Max Concrete Pressure……………………………………………………………….. 1

2 Calculation of Capacity of Plywood Sheet………………………………………………………….. 2

3 Calculation of Vertical 100x50mm C14 Timber…………………………………………………….. 3

4 Calculation of Vertical 48mm Dia GI Pipe…………………………………………………….. 4

5 Calculation of Horizontal 48mm Dia GI Pipe……………………………………………………….. 5

6 Calculation of 12mm Dia Tie bars…………………………………………………………………. 6


CCHMET_HZ

PROJECT: North Western Province Canal Project (NWPC/ICB-2)


TITLE: Design of timber formwork for Walls
FEATURE: Calculation of Max Concrete Pressure
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit


Vertical Formwork Height: H 1.975 m

Vertical Pour Height: h 1.975 m

Weight Density of Concrete: D 25.00 kN/m3

Concrete Temperature at Placing: T 30.00 ℃

Shape of Formwork: wall

Coefficient of Formwork: C1 1.0

Constituent Materials of the Concrete: Type 1

Table 1, CIRIA Coefficient of the Concrete: C2 0.30


Report 108 Placing Speed of Concrete: 18.0 m3/h

Avg Width of wall: w 0.300 m

Avg Breadth of wall: b 6.90 m

Bottom Area of wall (bottom) A = w b: A 2.07 m2

Rate at Which Concrete Rises Vertically up the Form: R 8.696 m/h

Temperature Coefficient = (36/(T+16))^2: K 0.612

Dh= Dh 49.4 kN/m2


can't solve
Or, D*(C1*SQRT(R)+C2*K*SQRT((H-C1*SQRT(*R))) = Pmax #NUM! kN/m2

Design Concrete Pressure, Pmax or Dh, which smaller: 49.4 kN/m2

Table 2, Clause Partial Load Factors for Live Load: - 1.6


2.4, BS 5950 Design Pressure [Unfactored]: - 49.4 kN/m2

Design Pressure [Factored]: - 79.0 kN/m2


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of timber formwork for Walls
FEATURE: Calculation of Plywood Shutter Board
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit

For Loading Width: - 1.000 m

Span: L 0.250 m

Plywood Class 1 and 2

Design Pressure [Factored]: - 79.0 kN/m2

Design Loading: q 79.0 kN/m

BS8110-Table 3.12 Max Design Moment = 0.086FL: Mmax 0.42 kNm

Check Shear Stress:


Table 45, BS5268 Shear Capacity of Plywood τv 4.43 N/mm2
Width of Timber: 1000 mm

1000mm Timber Net Section Area: A 15000 mm2


Actual Shear Force = 0.5*q*L: Qmax 9.88 kN

Maximum Shear = Qmax/A: τmax 0.66 N/mm2

Check Shear Stress: τmax < Tv Ok

Check Bending Stress:


Table 45, BS5268 Permissible Bending Stress: σw 17.8 N/mm2

Relevant Axis Section Modulus: W 37500 mm3


Applied Bending Stress = Mmax/W: fb 11.33 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Table 45, BS5268 Young's Modulus of plywood: E 4,750 N/mm2

Net-sectional Moment of Inertia: I 28.13 cm4

Permissible Deflection = L/400: δp 0.63 mm

Actual Deflection = (q*L^4)/(384*E*I): δ 0.63 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of timber formwork for Walls
FEATURE: Calculation of Horizontal 100x50mm C14 Timber
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit

For Loading Width: - 0.25 m

Span: L 0.30 m

Strength Class of Timber: C14

Design Pressure [Factored]: - 79.0 kN/m2

Design Loading: q 19.8 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.22 kNm

Check Shear Stress:


Table 7,BS 5268 Shear Capacity of Timber: τv 0.60 N/mm2
Width of Timber: 100.0 mm

100mm Timber Net Section Area: A 5000 mm2


Actual Shear Force = 0.5*q*L: Qmax 2.96 kN

Maximum Shear = Qmax/A: τmax 0.59 N/mm2

Check Shear Stress: Tmax < Tv Ok

Check Bending Stress:


Table 7,BS 5268 Permissible Bending Stress: σw 4.1 N/mm2

Relevant Axis Section Modulus: W 83333 mm3


Applied Bending Stress = Mmax/W: fb 2.67 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Table 7,BS 5268 Young's Modulus of Timber: E 6,800 N/mm2

Net-sectional Moment of Inertia: I 416.67 cm4

Permissible Deflection = L/400: δp 0.75 mm

Actual Deflection = (5*q*L^4)/(384*E*I): δ 0.07 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of timber formwork for Walls
FEATURE: Calculation of Vertical 48mm Dia,3.5mm Thick GI Pipe×2
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit


For Loading Width: - 0.300 m

Span: L 0.600 m

Design Pressure [Factored]: - 79.0 kN/m2

Design Loading: q(two) 21.34 kN/m

Design Loading: q 10.67 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.48 kNm

Check Shear Stress:


Clause 3.1.1, BS5950/1 Design Strength: Py 235 N/mm2
Diameter of Pipe: 48.0 mm

48mm Diameter Pipe Net Section Area: A 489 mm2


Shear Area = 0.6*A: Av 293 mm2
Clause 4.2.3, BS5950/1 Shear Capacity = 0.6*Py*Av: Pv 41.37 kN

Actual Shear Force = 0.5*q*L: Qmax 3.20 kN

Check Shear Stress: Qmax < Pv Ok

Check Bending Stress:


Permissible Bending Stress: σw 145 N/mm2

Relevant Axis Section Modulus: W 4890 mm3


Applied Bending Stress = Mmax/W: fb 98.19 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 2.00 mm

Actual Deflection = (0.677*q*L^4)/(100*E*I): δ 0.37 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of timber formwork for Walls
FEATURE: Calculation of Horizontal 48mm Dia,3.5mm Thick GI Pipe×2
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit


For Loading Width: - 0.600 m

Span: L 0.450 m

Design Pressure [Factored]: - 79.0 kN/m2

Design Loading: q(two) 47.42 kN/m

Design Loading: q 23.71 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.60 kNm

Check Shear Stress:


Clause 3.1.1, BS5950/1 Design Strength: Py 235 N/mm2

Diameter of Pipe: 48.0 mm

48mm Diameter Pipe Net Section Area: A 489 mm2

Shear Area = 0.6*A: Av 293 mm2

Clause 4.2.3, BS5950/1 Shear Capacity = 0.6*Py*Av: Pv 41.37 kN

Actual Shear Force = 0.5*q*L: Qmax 5.34 kN

Check Shear Stress: Qmax < Pv Ok

Check Bending Stress:


Permissible Bending Stress: σw 145 N/mm2

Relevant Axis Section Modulus: W 4890 mm3


Applied Bending Stress = Mmax/W: fb 122.74 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.50 mm

Actual Deflection = (0.677*q*L^4)/(100*E*I): δ 0.26 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of timber formwork for Walls
FEATURE: Calculation of 12mm Tie Rods (Tie bars)
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit


Effective Diameter of Bar 12mm tread bars D 10.00 mm
Loaded with (Spacing) a 0.3 m
Loaded Height b 0.600 m
Loaded Area a*b 0.18 m2
Cross-Sectional Area of a tie bar: A 78.5 mm2
Designed Pressure - 79.0 kN/m2
Total Force on a Tie bar F 14.23 kN
Stress on a Tie Bar f 181.1 N/mm2
Strength of tie rod steel σ w 275 N/mm2
Check the Tie Bar adequacy f < σw Ok

Check For Shear Load:


Weight of plywood sheet w1 0.32 kN
Weignt of 100x50 Timber Battens Per one Plywood
w2 0.64 kN
sheet
GI Pipe Weight (Vertical) w3 0.8 kN
GI Pipe Weight (Horizontal) w4 1.2 kN
Total weight with 1.6 safety factor w 4.7 kN
if one board has 6 Tie bars. These 6 bars bear load
S 0.8 kN
of one panel boards. Thus shear stress on a trie rod

Clause 4.2.3, Shear Strength of Tie rod (Pv=0.6pyA),


Pv 12.96 kN
BS5950 where py=275N/mm2
Check the Tie Bar adequacy S<Pv Ok
Annex 14

TITLE: DESIGN CALCULATIONS OF STEEL FORMWORK FOR WALLS


OF OPEN RECTANGULAR CANAL

1 Calculation of Max Concrete Pressure……………………………………………………………….. 1

4 Calculation of Vertical 48mm Dia GI Pipe…………………………………………………….. 2

5 Calculation of Horizontal 48mm Dia GI Pipe……………………………………………………….. 3

6 Calculation of 12mm Dia Tie bars…………………………………………………………………. 4


CCHMET_HZ

PROJECT: North Western Province Canal Project (NWPC/ICB-2)


TITLE: Design of Steel Formwork for Walls
FEATURE: Calculation of Max Concrete Pressure
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit


Vertical Formwork Height: H 1.975 m

Vertical Pour Height: h 1.975 m

Weight Density of Concrete: D 25.00 kN/m3

Concrete Temperature at Placing: T 30.00 ℃

Shape of Formwork: wall

Coefficient of Formwork: C1 1.0

Constituent Materials of the Concrete: Type 1

Table 1, CIRIA Coefficient of the Concrete: C2 0.30


Report 108 Placing Speed of Concrete: 18.0 m3/h

Avg Width of wall: w 0.300 m

Avg Breadth of wall: b 6.90 m

Bottom Area of wall (bottom) A = w b: A 2.07 m2

Rate at Which Concrete Rises Vertically up the Form: R 8.696 m/h

Temperature Coefficient = (36/(T+16))^2: K 0.612

Dh= Dh 49.4 kN/m2


Or, D*(C1*SQRT(R)+C2*K*SQRT((H-C1*SQRT(*R))) = Pmax can't
#NUM!solve
kN/m2

Design Concrete Pressure, Pmax or Dh, which smaller: 49.4 kN/m2

Table 2, Clause Partial Load Factors for Live Load: - 1.6


2.4, BS 5950 Design Pressure [Unfactored]: - 49.4 kN/m2

Design Pressure [Factored]: - 79.0 kN/m2


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Steel Formwork for Walls
FEATURE: Calculation of Vertical 48mm Dia,3.5mm Thick GI Pipe×2
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit


For Loading Width: - 0.375 m

Span: L 0.600 m

Design Pressure [Factored]: - 79.0 kN/m2

Design Loading: q(two) 26.68 kN/m

Design Loading: q 13.34 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.60 kNm

Check Shear Stress:


Clause 3.1.1, BS5950/1 Design Strength: Py 235 N/mm2
Diameter of Pipe: 48.0 mm

48mm Diameter Pipe Net Section Area: A 489 mm2


Shear Area = 0.6*A: Av 293 mm2
Clause 4.2.3, BS5950/1 Shear Capacity of Channel = 0.6*Py*Av: Pv 41.37 kN

Actual Shear Force = 0.5*q*L: Qmax 4.00 kN

Check Shear Stress: Qmax < Pv Ok

Check Bending Stress:


Permissible Bending Stress: σw 145 N/mm2

Relevant Axis Section Modulus: W 4890 mm3


Applied Bending Stress = Mmax/W: fb 122.74 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 2.00 mm

Actual Deflection = (0.677*q*L^4)/(100*E*I): δ 0.47 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Steel Formwork for Walls
FEATURE: Calculation of Horizontal 48mm Dia,3.5mm Thick GI Pipe×2
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit


For Loading Width: - 0.600 m

Span: L 0.450 m

Design Pressure [Factored]: - 79.0 kN/m2

Design Loading: q(two) 47.42 kN/m

Design Loading: q 23.71 kN/m

Max Design Moment = (q*L^2)/8: Mmax 0.60 kNm

Check Shear Stress:


Clause 3.1.1, BS5950/1 Design Strength: Py 235 N/mm2

Diameter of Pipe: 48.0 mm

48mm Diameter Pipe Net Section Area: A 489 mm2

Shear Area = 0.6*A: Av 293 mm2

Clause 4.2.3, BS5950/1 Shear Capacity of Channel = 0.6*Py*Av: Pv 41.37 kN

Actual Shear Force = 0.5*q*L: Qmax 5.34 kN

Check Shear Stress: Qmax < Pv Ok

Check Bending Stress:


Permissible Bending Stress: σw 145 N/mm2

Relevant Axis Section Modulus: W 4890 mm3


Applied Bending Stress = Mmax/W: fb 122.74 N/mm2

Check Bending Stress: fb < σw Ok

Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.50 mm

Actual Deflection = (0.677*q*L^4)/(100*E*I): δ 0.26 mm

Check Actual Deflection: δ < δp Ok


PROJECT: North Western Province Canal Project (NWPC/ICB-2)
TITLE: Design of Steel Formwork for Walls
FEATURE: Calculation of 12mm Tie Rods (Tie bars)
Prepared By: W.A.Indunil
Date: 18/03/2019

Reference Description Symbol Value Unit


Effective Diameter of Bar 12mm tread bars D 10.00 mm
Loaded with (Spacing) a 0.375 m
Loaded Height b 0.600 m
Loaded Area a*b 0.23 m2
Cross-Sectional Area of a tie bar: A 78.5 mm2
Designed Pressure - 79.0 kN/m2
Total Force on a Tie bar F 17.78 kN
Stress on a Tie Bar f 226.4 N/mm2
Strength of tie rod steel σ w 275 N/mm2
Check the Tie Bar adequacy f < σw Ok

Check For Shear Load:


Weight of steel panal w1 1.77 kN
Weignt of 100x50 Timber Battens Per one Plywood
w2 - kN
sheet
GI Pipe Weight (Vertical) w3 0.8 kN
GI Pipe Weight (Horizontal) w4 1.2 kN
Total weight with 1.6 safety factor w 6.0 kN
if one board has 6 Tie bars. These 6 bars bear load
S 1.0 kN
of one panel boards. Thus shear stress on a trie rod

Clause 4.2.3, Shear Strength of Tie rod (Pv=0.6pyA),


Pv 12.96 kN
BS5950 where py=275N/mm2
Check the Tie Bar adequacy S<Pv Ok
PLATE : 001

TIMBER FORMWORK PANEL FOR BASEMENT


(ELEVATED RECTANGULAR OPEN CANAL-SIDE FORMWORK FOR PIER FOUNDATION)

2440
PLYWOOD
FORMWORK MODEL 48mm GI PIPE 15 mm THICK
THREADED BAR.
L

15 mm THICK
Ø

300 300 300 300 300 300 300 300 PLYWOOD BOARD
PLYWOOD BOARD 407 813 813 407

275
275
50 x 100 mm
1000

TIMBER

1000

1000

450
450
DETAIL-A

275
275
50 X 100mm
TIMBER.

Ø48mm GI PIPE
ELEVATION
SECTION ELEVATION SECTION
15 mm THICK
PLYWOOD BOARD 407 813 813 407
300 300 300 300 300 300 300 300

50 X 100mmTIMBER.
PLAN 2X Ø48mm GI PIPE.
THREADED BAR.
PLYWOOD FORMWORK MODEL ARRANGEMENT PLAN

FALSWORK ARRANGEMENT

50X100mm TIMBER. 50X100mm TIMBER.

15mm THICK
PLYWOOD BOARD

FORM TIE FORM TIE


15mm THICK PVC PIPE
PLYWOOD BOARD
Ø12mm THREADED BAR Ø12mm THREADED BAR

Ø12mm NUT Ø12mm NUT


P-CONE

Ø48mm GI PIPE Ø48mm GI PIPE

DETAIL-A (OPTION-01) DETAIL-A (OPTION-02)

NOTE
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS STATED OTHERWISE.

CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-008
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 01 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE SIDE FORMWORK FOR PIER FOUNDATION
DATE DATE TIMBER FORMWORK PANEL DETAILS
AS SHOWN A3 -
PLATE : 002

STEEL FORMWORK PANEL FOR BASEMENT


(ELEVATED RECTANGULAR OPEN CANEL-SIDE FORMWORK FOR PIER FOUNDATION)

1500
375 750 375
150 300 300 300 300 150
50
Ø48mm
GI BAR

150 100
100

275

275
3mm THICK
STEEL PLATE
300

150
3mm THICK STEEL
STEEL PLATE FORMWORK

1000
450

450
150
1000
300

150
DETAIL-A

150

275

275
300

150
3mm THICK STEEL PLATE ELEVATION SECTION
3mm THICK STEEL PLATE

ELEVATION SECTION 1500

375 750 375

STEEL FORMWORK MODEL ARRANGEMENT

FALSWORK ARRANGEMENT

STEEL
STEEL FORMWORK
FORMWORK
Ø12mm Ø12mm
THREADED BAR THREADED BAR

BUTTERFLY NUT BUTTERFLY


P-CONE PVC PIPE
NUT
Ø48mm GI PIPE Ø48mm GI PIPE

NOTE
DETAIL-A (OPTION 01) DETAIL-A (OPTION-02) 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS STATED OTHERWISE.

CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR. 2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-008
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 02 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE SIDE FORMWORK FOR PIER FOUNDATION
DATE DATE STEEL FORMWORK PANEL DETAILS
AS SHOWN A3 -
PLATE : 003

TIMBER & STEEL FORMWORK - FALSEWORK ARRANGEMENT FOR PIER FOUNDATION


ELEVATED RECTANGULAR OPEN CANAL

SCREW JACK FOR DIAGONAL BRACING


(HORIZONTAL SPACING SHOULD BE 0.81m
FOR TIMBER FORMWORK & 0.75m FOR
B B STEEL FORMWORK).

Ø12-300mm ANCHOR DEPTH


DOWEL BAR (Ø12mm STEEL BAR) (CHEMICAL ANCHORING SHALL
THE SPACING SHALL BE 1m. BE USED)
SCREW JACK FOR DIAGONAL BRACING
(HORIZONTAL SPACING SHOULD BE 0.81m SECTION A-A
FOR TIMBER FORMWORK & 0.75m FOR
STEEL FORMWORK. A

PLAN

SCREW JACK FOR DIAGONAL BRACING


(HORIZONTAL SPACING SHOULD BE
0.81m FOR TIMBER FORMWORK & 0.75m
FOR STEEL FORMWORK).

DOWEL BAR (Ø12mm STEEL BAR)


Ø12-300mm ANCHOR DEPTH
THE SPACING SHALL BE 1m.
(CHEMICAL ANCHORING SHALL
BE USED)
SECTION B-B

CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR. 2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 03 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE SIDE FORMWORK FOR PIER FOUNDATION
DATE DATE FORMWORK PANEL SUPPORTING DETAILS
AS SHOWN A3 -
PLATE : 004

TIMBER FORMWORK FOR PIERS


(ELEVATED OPEN RECTANGULAR CANAL)
1220
198 275 275 275 197
1170 50

200
15mm THICK
PLYWOOD BOARD
250

600

600
Ø48mm GI PIPE
15mm THICK
PLYWOOD BOARD
250
250

Ø48mm
GI PIPE Ø12mm

600

600
THREADED BAR
250

BUTTERFLY
P-CONE NUT
2500

2500
50 x 100mm 15mm THICK
250

TIMBER PLYWOOD BOARD

DETAIL-A (OPTION 01)

600

600
250
250

15mm THICK Ø48mm GI PIPE


250

PLYWOOD BOARD
DETAIL-A

600

600
250

50 Ø12mm
50 x 100mm TIMBER THREADED BAR

SECTION
ELEVATION SECTION ELEVATION PVC PIPE
BUTTERFLY
NUT

198 275 275 275 197

1220
DETAIL-A (OPTION 02)
1170

50 x 100mm TIMBER

15mm THICK PLYWOOD PLAN


15mm THICK PLAN 50 x 100mm TIMBER
BOARD
PLYWOOD BOARD
NOTE
PLYWOOD FORMWORK MODEL ARRANGEMENT FALSWORK ARRANGEMENT 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS STATED OTHERWISE.

CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 04 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE
ELEVATED RECTANGULAR OPEN CANAL
DATE DATE
TIMBER FORMWORK PANEL DETAILS FOR PIERS AS SHOWN A3 -
PLATE : 005

TIMBER FORMWORK & FALSEWORK ARRANGEMENT FOR PIERS


(ELEVATED RECTANGULAR OPEN CANAL) SCREW JACK FOR HORIZONTAL
THREAD BARS
GI PIPE OR SUPPORTS OF THE FORMWORK
SCAFFOLDING FRAME PANEL (SPACING SHALL BE 0.45m)
GI PIPE OR SCAFFOLDING A
FRAME TO SUPPORT THE
FORMWORK

GI PIPE OR
SCAFFOLDING FRAME
THREAD BARS SCREW JACK FOR HORIZONTAL
SUPPORTS OF THE FORMWORK
PANEL (SPACING SHALL BE 0.45m)
B B

SCREW JACK FOR


DIAGONAL BRACING
SCREW JACK FOR
DIAGONAL BRACING

GI PIPE OR SCAFFOLDING
FRAME TO SUPPORT THE A
FORMWORK PLAN
SECTION A-A SECTION A-A
STAGE ONE CONCRETING STAGE TWO CONCRETING

NOTE:
1. PLEASE NOTE THAT IF THREAD BARS (INTERNAL SUPPORT) ARE THREAD BARS
USED, THEN ACRO JACK SUPPORT ARE REQUIRED ONLY FOR SCREW JACK FOR HORIZONTAL
MAINTAIN THE VERTICALITY OF WALLS. HOWEVER THREAD BAR OR SUPPORTS OF THE FORMWORK
ACRO JACK SUPPORTS SHOULD USE AT SPECIFIED SPACINGS. PANEL (SPACING SHALL BE 0.45m)

GI PIPE OR
SCAFFOLDING
FRAME
GI PIPE OR
THREAD BARS
SCAFFOLDING FRAME
SCREW JACK FOR HORIZONTAL
SUPPORTS OF THE FORMWORK
PANEL (SPACING SHALL BE 0.45m)

SCREW JACK FOR SCREW JACK FOR


DIAGONAL BRACING DIAGONAL BRACING

SECTION B-B
STAGE ONE CONCRETING SECTION B-B
STAGE TWO CONCRETING

CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR. 2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 05 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE
DATE DATE
TIMBER FORMWORK & FALSWORK ARRANGEMENT FOR PIERS
AS SHOWN A3 -
PLATE : 006
STEEL FORMWORK PANEL FOR PIERS
(ELEVATED RECTANGULAR OPEN CANAL)
1500
150 300 300 300 300 150

50 187.5 375 375 375 187.5 50


100

100

150
300

150

600

600
150
300

150
3mm THICK

150
STEEL PLATE
300

150

600

600
150
300

150
2500

3mm THICK
STEEL PLATE

150
300

150

600

600
150
300

150
150
300

150

600

600
150
300

150
DETAIL-A

50
3mm THICK STEEL PLATE
3mm THICK STEEL PLATE
ELEVATION
ELEVATION SECTION SECTION
1500
STEEL FORMWORK MODEL ARRANGEMENT
187.5 375 375 375 187.5

Ø48mm GI PIPE
STEEL
STEEL
FORMWORK
FORMWORK
Ø12mm Ø12mm
THREADED BAR THREADED BAR
BUTTERFLY 3mm THICK STEEL PLATE THREADED BAR
P-CONE NUT BUTTERFLY
PVC PIPE
NUT
Ø48mm GI PIPE Ø48mm GI PIPE
PLAN
FALSWORK ARRANGEMENT
DETAIL-A (OPTION 01) DETAIL-A (OPTION 02) NOTE
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS STATED OTHERWISE.
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR. 2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 06 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE
DATE DATE
STEEL FORMWORK PANEL DETAILS FOR PIERS AS SHOWN A3 -
PLATE : 007

STEEL FORMWORK & FALSEWORK ARRANGEMENT FOR PIERS


(ELEVATED RECTANGULAR OPEN CANAL)
THREAD BARS SCREW JACK FOR HORIZONTAL
GI PIPE OR SCAFFOLDING GI PIPE OR SUPPORTS OF THE FORMWORK
FRAME TO SUPPORT THE A SCAFFOLDING FRAME PANEL (SPACING SHALL BE 0.45m)
FORMWORK

GI PIPE OR
SCAFFOLDING FRAME

THREAD BARS SCREW JACK FOR HORIZONTAL


SUPPORTS OF THE FORMWORK
PANEL (SPACING SHALL BE 0.45m)
B B

SCREW JACK FOR


DIAGONAL BRACING
SCREW JACK FOR
DIAGONAL BRACING

GI PIPE OR SCAFFOLDING
A
PLAN
FRAME TO SUPPORT THE
FORMWORK SECTION A-A SECTION A-A
STAGE ONE CONCRETING STAGE TWO CONCRETING

NOTE: THREAD BARS


1. PLEASE NOTE THAT IF THREAD BARS (INTERNAL SUPPORT) ARE SCREW JACK FOR HORIZONTAL
USED, THEN ACRO JACK SUPPORT ARE REQUIRED ONLY FOR SUPPORTS OF THE FORMWORK
MAINTAIN THE VERTICALITY OF WALLS. HOWEVER THREAD BAR OR PANEL (SPACING SHALL BE 0.45m)
ACRO JACK SUPPORTS SHOULD USE AT SPECIFIED SPACINGS.

GI PIPE OR
SCAFFOLDING
FRAME
GI PIPE OR
SCAFFOLDING FRAME THREAD BARS
SCREW JACK FOR HORIZONTAL
SUPPORTS OF THE FORMWORK
PANEL (SPACING SHALL BE 0.45m)

SCREW JACK FOR SCREW JACK FOR


DIAGONAL BRACING DIAGONAL BRACING

SECTION B-B
STAGE ONE CONCRETING SECTION B-B
STAGE TWO CONCRETING

CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR. 2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 07 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE STEEL FORMWORK & FALSWORK ARRANGEMENT FOR PIERS
DATE DATE
AS SHOWN A3 -
PLATE : 008

TIMBER FORMWORK PANEL FOR WING WALL FOUNDATION


(ELEVATED RECTANGULAR OPEN CANAL)

2440 PLYWOOD FORMWORK MODEL L

THREADED BAR. 48mm GI PIPE


813 813 813 15 mm THICK
Ø

PLYWOOD BOARD 407 813 813 407 DETAIL-A

50 x 100 mm
TIMBER

200
400

400

400

200
50 X 100mm
TIMBER.

ELEVATION SECTION ELEVATION SECTION

15 mm THICK
PLYWOOD BOARD 407 813 813 407
813 813 813

50 X 100mmTIMBER.
2X Ø48mm GI PIPE.
PLAN THREADED BAR.

PLYWOOD FORMWORK MODEL ARRANGEMENT PLAN

FALSWORK ARRANGEMENT

50X100mm TIMBER. 50X100mm TIMBER.

15mm THICK
PLYWOOD BOARD

FORM TIE FORM TIE


15mm THICK PVC PIPE
PLYWOOD BOARD
Ø12mm THREADED BAR Ø12mm THREADED BAR

Ø12mm NUT Ø12mm NUT


P-CONE

Ø48mm GI PIPE Ø48mm GI PIPE

DETAIL-A (OPTION-01) DETAIL-A (OPTION-02)

NOTE
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS STATED OTHERWISE.

CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR. 2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
NW-I02-C-MS-08
Engineering
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 08 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE ELEVATED RECTANGULAR OPEN CANAL
DATE DATE TIMBER FORMWORK PANEL DETAILS FOR WING WALL FOUNDATION AS SHOWN A3 -
PLATE : 009

STEEL FORMWORK PANEL FOR WING WALL FOUNDATION


(ELEVATED RECTANGULAR OPEN CANAL)

1500
150 300 300 300 300 150
50
375 750 375
3mm THICK

100
STEEL PLATE

200

200
3mm THICK

150 150
400

STEEL PLATE DETAIL-A

200

200
3mm THICK STEEL PLATE
3mm THICK STEEL PLATE

ELEVATION SECTION ELEVATION SECTION

STEEL FORMWORK MODEL ARRANGEMENT

1500

375 750 375


STEEL STEEL
FORMWORK FORMWORK
Ø12mm Ø48mm GI PIPE
Ø12mm
THREADED BAR THREADED BAR
BUTTERFLY
NUT BUTTERFLY
P-CONE PVC PIPE
Ø48mm NUT
Ø48mm GI PIPE 3mm THICK STEEL PLATE THREADED BAR
GI PIPE
PLAN
DETAIL-A (DETAIL 01) DETAIL-A (OPTION 02)
FALSWORK ARRANGEMENT

NOTE
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS STATED OTHERWISE.

CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 08 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE
ELEVATED RECTANGULAR OPEN CANAL
DATE DATE
STEEL FORMWORK FOR WING WALL FOUNDATION AS SHOWN A3 -
PLATE : 010

TIMBER & STEEL FORMWORK - FALSEWORK ARRANGEMENT FOR WING WALL FOUNDATION
(ELEVATED RECTANGULAR OPEN CANAL)

B B

SCREW JACK FOR DIAGONAL BRACING


(HORIZONTAL SPACING SHOULD BE
0.81m FOR TIMBER FORMWORK & 0.75m
FOR STEEL FORMWORK.

A
PLAN

SCREW JACK FOR DIAGONAL BRACING SCREW JACK FOR DIAGONAL BRACING
(HORIZONTAL SPACING SHOULD BE 0.81m (HORIZONTAL SPACING SHOULD BE 0.81m
FOR TIMBER FORMWORK & 0.75m FOR FOR TIMBER FORMWORK & 0.75m FOR
STEEL FORMWORK). STEEL FORMWORK).

DOWEL BAR (Ø12mm STEEL BAR) DOWEL BAR (Ø12mm STEEL BAR)
THE SPACING SHALL BE 1m. THE SPACING SHALL BE 1m.

SECTION A-A SECTION B-B

CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR..2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 10 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE
DATE DATE
SIDE FORMWORK FOR WING WALL FOUNDATION
AS SHOWN A3 -
FORMWORK PANEL SUPPORTING DETAILS
PLATE : 011
TIMBER FORMWORK PANEL FOR WING WALL
1220
(ELEVATED OPEN RECTANGULAR CANAL)
1170 130 240 240 240 240 130

200

250

250
250
15mm THICK

500

500
PLYWOOD BOARD
250

15mm THICK
Ø48mm GI PIPE
PLYWOOD BOARD
250

Ø48mm

500

500
GI PIPE
250
2500

2500
15mm THICK Ø12mm
50 x 100mm
250

PLYWOOD BOARD THREADED BAR


TIMBER

500

500
BUTTERFLY
P-CONE NUT
250
250

DETAIL-A (OPTION 01)

500

500
250

DETAIL-A
250

250

250
50 x 100mm TIMBER

SECTION 15mm THICK


ELEVATION SECTION ELEVATION PLYWOOD BOARD
Ø48mm GI PIPE

130 240 240 240 240 130

1220
1170 Ø12mm
THREADED BAR
50 x 100mm TIMBER
BUTTERFLY
15mm THICK PLYWOOD PLAN PVC PIPE NUT
15mm THICK PLAN 50 x 100mm TIMBER
BOARD
PLYWOOD BOARD

PLYWOOD FORMWORK MODEL ARRANGEMENT FALSWORK ARRANGEMENT


DETAIL-A (OPTION 02)
NOTE
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS STATED OTHERWISE.

CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 11 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE
DATE DATE
TIMBER FORMWORK PANEL DETAILS FOR WING WALL AS SHOWN A3 -
PLATE : 012

TIMBER FORMWORK & FALSEWORK ARRANGEMENT FOR WING WALLS


(ELEVATED OPEN RECTANGULAR CANAL)

GI PIPE OR
SCAFFOLDING FRAME GI PIPE OR SCREW JACK WITH GI PIPES
SCREW JACK WITH GI PIPES SCAFFOLDING FRAME FOR HORIZONTAL SUPPORT.
FOR HORIZONTAL SUPPORT. THE SPACING SHALL BE 0.45m.
THE SPACING SHALL BE 0.45m.
GI PIPE OR
SCAFFOLDING FRAME

A
PLAN
GI PIPE OR SCREW JACK WITH GI PIPES
SCAFFOLDING FRAME FOR HORIZONTAL SUPPORT.
THE SPACING SHALL BE 0.45m.

GI PIPE OR
SCAFFOLDING FRAME

SECTION A-A
STAGE TWO CONCRETING

NOTE:
1. PLEASE NOTE THAT IF THREAD BARS (INTERNAL SUPPORT) ARE
USED, THEN ACRO JACK SUPPORT ARE REQUIRED ONLY FOR
MAINTAIN THE VERTICALITY OF WALLS. HOWEVER THREAD BAR OR
ACRO JACK SUPPORTS SHOULD USE AT SPECIFIED SPACINGS.
SECTION A-A
STAGE ONE CONCRETING
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 12 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE
DATE DATE
TIMBER FORMWORK & FALSWORK ARRANGEMENT FOR
AS SHOWN A3 -
WING WALLS
PLATE : 013

STEEL FORMWORK PANNEL FOR WING WALL


(ELEVATED RECTANGULAR OPEN CANAL)
150 300 300 300 300 150 1500

50 187.5 375 375 375 187.5


100

100

250
150
300

150
150

500

500
300

150
3mm THICK

150
STEEL PLATE
300

150

500

500
150
300

150
2500

3mm THICK
STEEL PLATE

150
300

500

500
150
150
300

150
150

500

500
300

150
DETAIL-A

150
300

250
150
3mm THICK STEEL PLATE
3mm THICK STEEL PLATE

ELEVATION SECTION ELEVATION SECTION


STEEL FORMWORK MODEL ARRANGEMENT 1500
187.5 375 375 375 187.5

Ø48mm GI PIPE
STEEL STEEL
FORMWORK FORMWORK
Ø12mm Ø12mm
THREADED BAR THREADED BAR
BUTTERFLY 3mm THICK STEEL PLATE THREADED BAR
BUTTERFLY
P-CONE NUT
Ø48mm
PVC PIPE
NUT PLAN
Ø48mm GI PIPE
GI PIPE FALSWORK ARRANGEMENT
DETAIL-A (DETAIL 01) DETAIL-A (OPTION 02) NOTE
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS STATED OTHERWISE.
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR. 2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 13 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE
ELEVATED RECTANGULAR OPEN CANAL
DATE DATE
STEEL FORMWORK PANEL DETAILS FOR WING WALL AS SHOWN A3 -
PLATE : 014

STEEL FORMWORK & FALSEWORK ARRANGEMENT FOR WING WALLS


(ELEVATED RECTANGULAR OPEN CANAL)
A

GI PIPE OR
SCAFFOLDING FRAME
SCREW JACK WITH GI PIPES
FOR HORIZONTAL SUPPORT.
THE SPACING SHALL BE 0.45m. SCREW JACK WITH GI PIPES
GI PIPE OR
SCAFFOLDING FRAME FOR HORIZONTAL SUPPORT.
THE SPACING SHALL BE 0.45m.

GI PIPE OR
SCAFFOLDING FRAME

A
PLAN
GI PIPE OR SCREW JACK WITH GI PIPES
SCAFFOLDING FRAME FOR HORIZONTAL SUPPORT.
THE SPACING SHALL BE 0.45m.

GI PIPE OR
SCAFFOLDING FRAME

SECTION A-A
STAGE TWO CONCRETING

NOTE:
1. PLEASE NOTE THAT IF THREAD BARS (INTERNAL SUPPORT) ARE
USED, THEN ACRO JACK SUPPORT ARE REQUIRED ONLY FOR
MAINTAIN THE VERTICALITY OF WALLS. HOWEVER THREAD BAR OR
SECTION A-A ACRO JACK SUPPORTS SHOULD USE AT SPECIFIED SPACINGS.
STAGE ONE CONCRETING

CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 14 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE STEEL FORMWORK & FALSWORK ARRANGEMENT FOR
DATE DATE WING WALLS
AS SHOWN A3 -
PLATE : 015

TIMBER/STEEL FORMWORK PANEL DETAILS FOR SOFFIT FORMWORK OF


OPEN RECTANGULAR CANAL BOTTOM SLAB - ELEVATED OPEN RECTANGULAR CANAL

TIMBER FORMWORK STEEL FORMWORK


Y1 Y2

300 300 300 300 300


300 300 300 300 300

400
50x100mm TIMBER
400

X2 X2
X1 X1

400
400

Ø48mm
GI PIPE

Y2
50x100mm TIMBER
Y1

PLYWOOD FORMWORK MODEL ARRANGEMENT STEEL FORMWORK MODEL ARRANGEMENT


Ø48mm GI
PIPE
Ø48mm GI PIPE 15mm THICK PLYWOOD BOARD

STEEL FORMWORK
50x100mm TIMBER
50x100mm TIMBER
125 300 300 300 300 300 125 125 300 300 300 300 300 125

SECTION X1-X1 SECTION X2-X2


STEEL FORMWORK
15mm THICK PLYWOOD BOARD

Ø48mm GI PIPE Ø48mm GI PIPE


400 400 400 400 50x100mm TIMBER
50x100mm TIMBER

SECTION Y1-Y1 NOTE


1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS STATED OTHERWISE.
SECTION Y2-Y2

CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 15 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE
DATE DATE
FORMWORK PANEL DETAILS FOR BOTTOM SLAB (SOFFIT) OF
AS SHOWN A3 -
OPEN RECTANGULAR CANAL
PLATE : 016

TIMBER FORMWORK PANEL FOR SIDE OF BOTTOM SLAB OF


ELEVATED RECTANGULAR OPEN CANAL
2440
PLYWOOD FORMWORK
300 300 300 300 300 300 300 300 MODEL
48mm GI PIPE
L

THREADED BAR.

250
50 x 100 mm
TIMBER
950

400
950
15 mm THICK

950
PLYWOOD BOARD DETAIL-A

300
50 X 100mm
TIMBER.

ELEVATION
SECTION ELEVATION SECTION
15 mm THICK
PLYWOOD BOARD 407 813 813 407
300 300 300 300 300 300 300 300

50 X 100mmTIMBER.
PLAN 2X Ø48mm GI PIPE.
THREADED BAR.
PLYWOOD FORMWORK MODEL ARRANGEMENT PLAN

FALSWORK ARRANGEMENT

50X100mm TIMBER. 50X100mm TIMBER.

15mm THICK
PLYWOOD BOARD

FORM TIE FORM TIE


15mm THICK PVC PIPE
PLYWOOD BOARD
Ø12mm THREADED BAR Ø12mm THREADED BAR

Ø12mm NUT Ø12mm NUT


P-CONE

Ø48mm GI PIPE Ø48mm GI PIPE

DETAIL-A (OPTION-01) DETAIL-A (OPTION-02)

NOTE
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS STATED OTHERWISE.

CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 16 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE BOTTOM SLAB SIDE FORMWORK (TIMBER)
DATE DATE OPEN RECTANGULAR CANAL
AS SHOWN A3 -
PLATE : 017
TIMBER FORMWORK & FALSEWORK ARRANGEMENT FOR BOTTOM SLAB OF OPEN RECTANGULAR CANAL
(ELEVATED RECTANGULAR OPEN CANAL) GI PIPE WITH SCREW JACK FOR
HORIZONTAL SUPPORT OF SIDE GI PIPE OR
FORMWORK SCAFFOLDING FRAME
GI PIPE OR
SPACING SHALL BE 0.81m)
SCAFFOLDING FRAME

A
GI PIPE OR SCAFFOLDING
FRAME

B B

SECTION A-A

SCREW JACK FOR HORIZONTAL


SUPPORTS FOR SIDE
FORMWORK
(SPACING @0.81m) VERTICAL SUPPORTS FOR
SOFFIT FORMWORK OF
BOTTOM SLAB.
(SPACING SHALL BE 0.5m)
A
PLAN GI PIPE OR SCAFFOLDING
FRAME

SECTION B-B
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 17 OF 23
LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME G.A.D.I.SILVA ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE TIMBER FORMWORK SUPPORTING DETAILS FOR BOTTOM SLAB OF
DATE DATE OPEN RECTANGULAR CANAL AS SHOWN A3 -
PLATE : 018

STEEL FORMWORK PANEL FOR SIDE OF BOTTOM SLAB OF RECTANGULAR OPEN CANAL
ELEVATED RECTANGULAR OPEN CANAL

1500
150 300 300 300 300 150 375 750 375
50
Ø48mm GI BAR

150 50
50

3mm THICK

250
STEEL PLATE
300

150
STEEL FORMWORK

150

400
950

950

950
300

150
DETAIL-A

150

300
300

150
ELEVATION 3mm THICK SECTION ELEVATION SECTION
STEEL PLATE

STEEL FORMWORK MODEL ARRANGEMENT 1500

375 750 375

PLAN
FALSWORK ARRANGEMENT
STEEL STEEL
FORMWORK FORMWORK
Ø12mm Ø12mm
THREADED BAR THREADED BAR
BUTTERFLY
NUT BUTTERFLY
P-CONE PVC PIPE
Ø48mm NUT
GI PIPE Ø48mm GI PIPE

NOTE
DETAIL-A (DETAIL 01) DETAIL-A (OPTION 02) 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS STATED OTHERWISE.

CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 18 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE STEEL FORMWORK PANEL DETAILS FOR SIDE OF BOTTOM SLAB
AS SHOWN A3 -
DATE DATE OR RECTANGULAR CANAL
PLATE : 019
STEEL FORMWORK & FALSEWORK ARRANGEMENT FOR BOTTOM SLAB OF OPEN RECTANGULAR CANAL
(ELEVATED RECTANGULAR OPEN CANAL) GI PIPE WITH SCREW JACK FOR
HORIZONTAL SUPPORT OF SIDE GI PIPE OR
FORMWORK SCAFFOLDING FRAME
GI PIPE OR
SPACING SHALL BE 0.81m)
SCAFFOLDING FRAME

A
GI PIPE OR SCAFFOLDING
FRAME

B B

SECTION A-A

SCREW JACK FOR HORIZONTAL


SUPPORTS FOR SIDE
FORMWORK
(SPACING @0.81m)

VERTICAL SUPPORTS FOR


SOFFIT FORMWORK OF
A BOTTOM SLAB.
PLAN (SPACING SHALL BE 0.5m)

SECTION B-B
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 19 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE STEEL FORMWORK SUPPORTING DETAILS FOR BOTTOM SLAB OF
DATE DATE OPEN RECTANGULAR CANAL
AS SHOWN A3 -
PLATE : 020

TIMBER FORMWORK PANEL FOR WALLS - RECTANGULAR OPEN CANAL


(ELEVATED RECTANGULAR OPEN CANAL)

1220
160 300 300 300 160
1170

125
175

15mm THICK
Ø48mm GI PIPE
PLYWOOD BOARD
250

Ø48mm
GI PIPE

600

600
250

15mm THICK Ø12mm


50 x 100mm 15mm THICK THREADED BAR
250

TIMBER PLYWOOD BOARD


PLYWOOD BOARD
BUTTERFLY
1975

1975
P-CONE

600

600
NUT
250
250

DETAIL-A (OPTION 01)


250

DETAIL-A

600

600
250

50
50 x 100mm TIMBER

SECTION 15mm THICK


ELEVATION SECTION ELEVATION PLYWOOD BOARD
Ø48mm GI PIPE

160 300 300 300 160

1220
1170 Ø12mm
THREADED BAR
50 x 100mm TIMBER
BUTTERFLY
15mm THICK PLYWOOD PLAN PVC PIPE NUT
15mm THICK PLAN 50 x 100mm TIMBER
BOARD
PLYWOOD BOARD

PLYWOOD FORMWORK MODEL ARRANGEMENT FALSWORK ARRANGEMENT


DETAIL-A (OPTION 02)
NOTE
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS STATED OTHERWISE.

CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 20 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE TIMBER FORMWORK PANEL FOR WALLS
DATE DATE RECTANGULAR OPEN CANAL AS SHOWN A3 -
PLATE : 021

TIMBER FORMWORK & FALSEWORK ARRANGEMENT FOR RECTANGULAR CANAL WALL


(ELEVATED RECTANGULAR OPEN CANAL)

SCREW JACK & GI PIPES AS


HORIZONTAL SUPPORTS TO CANAL
WALLFORMWORK.
GI PIPE OR GI PIPE OR
(SPACING SHALL BE 0.45m)
SCAFFOLDING FRAME SCAFFOLDING FRAME

GI PIPE OR SCAFFOLDING
FRAME

SCREW JACK & GI PIPES AS


HORIZONTAL SUPPORTS TO
CANAL WALL FOR WORK.
(SPACING SHALL BE 0.45m)

GI PIPE OR SCAFFOLDING
FRAME
SECTIONAL VIEW
PLAN

NOTE:
1. PLEASE NOTE THAT IF THREAD BARS (INTERNAL SUPPORT) ARE
USED, THEN ACRO JACK SUPPORT ARE REQUIRED ONLY FOR
MAINTAIN THE VERTICALITY OF WALLS. HOWEVER THREAD BAR OR
ACRO JACK SUPPORTS SHOULD USE AT SPECIFIED SPACINGS.

CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 21 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE TIMBER FORMWORK SUPPORTING DETAILS FOR
DATE DATE CANAL WALL FORMWORK
AS SHOWN A3 -
PLATE : 022

STEEL FORMWORK PANEL FOR RECTANGULAR OPEN CANAL WALLS


(ELEVATED RECTANGULAR OPEN CANAL)
1500
150 300 300 300 300 150

50 25 187.5 375 375 375 187.5

125
175

150
3mm THICK

150
STEEL PLATE
300

150

600

600
150
300

150
3mm THICK
STEEL PLATE

150
300
1975

150

600

600
150
300

DETAIL-A

150
150
300

150

600

600
150
300

150
50
3mm THICK STEEL PLATE
3mm THICK STEEL PLATE
ELEVATION
ELEVATION SECTION SECTION
1500
STEEL FORMWORK MODEL ARRANGEMENT
187.5 375 375 375 187.5

Ø48mm GI PIPE

STEEL STEEL
FORMWORK FORMWORK
3mm THICK STEEL PLATE THREADED BAR
Ø12mm Ø12mm
THREADED BAR THREADED BAR
PLAN
BUTTERFLY BUTTERFLY
P-CONE NUT PVC PIPE NUT FALSWORK ARRANGEMENT
Ø48mm
Ø48mm GI PIPE
GI PIPE

DETAIL-A (DETAIL 01) DETAIL-A (OPTION 02) NOTE


1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS STATED OTHERWISE.

CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 22 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE STEEL FORMWORK PANEL FOR WALLS
DATE DATE RECTANGULAR OPEN CANAL
AS SHOWN A3 -
PLATE : 023

STEEL FORMWORK & FALSEWORK ARRANGEMENT FOR RECTANGULAR CANAL WALL


(ELEVATED RECTANGULAR CANAL)

SCREW JACK & GI PIPES AS


HORIZONTAL SUPPORTS TO CANAL
WALLFORMWORK.
GI PIPE OR GI PIPE OR
(SPACING SHALL BE 0.45m)
SCAFFOLDING FRAME SCAFFOLDING FRAME

GI PIPE OR SCAFFOLDING
FRAME

SCREW JACK & GI PIPES AS


HORIZONTAL SUPPORTS TO
CANAL WALL FOR WORK.
(SPACING SHALL BE 0.45m)

GI PIPE OR SCAFFOLDING
FRAME SECTIONAL VIEW
PLAN

NOTE:
1. PLEASE NOTE THAT IF THREAD BARS (INTERNAL SUPPORT) ARE
USED, THEN ACRO JACK SUPPORT ARE REQUIRED ONLY FOR
MAINTAIN THE VERTICALITY OF WALLS. HOWEVER THREAD BAR OR
ACRO JACK SUPPORTS SHOULD USE AT SPECIFIED SPACINGS.

CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 23 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE STEEL FORMWORK SUPPORTING DETAILS FOR
DATE DATE CANAL WALL FORMWORK AS SHOWN A3 -
China State Construction Engineering Corporation Limited.
Doc. No : CSCEC/ITP/008
Rev. No : 00
Project : Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir
Inlet Tunnel (NWPCP ICB-2) Date : 20/03/2019
Employer : Ministry of Mahaweli Development and Environment (MMDE) Page : 1 of 07
Engineer : Program Management, Design and Supervision Consultant (PMDSC)
Contractor : China State Construction Engineering Corporation Limited.(CSCEC)

INSPECTION AND TEST PLAN FOR

CONSTRUCTION OF ELEVATED RECTANGULAR OPEN CANAL

Reference sheet
Document Description
Method Statement MS 002 Rev A for surface excavation work
MS 008 Rev A for construction of elevated rectangular open canal

Detailed project design NW-I02-C-STR-


drawing NW-I02-C-STR-
Specification Project specification of NWPCP ICB-2
ICTAD SCA/4/1
BS 8110-Structural use of concrete

Revision history

Revision Date Prepared by Description Checked by Approved by Remarks


China State Construction Engineering Corp. Limited Total number of pages (including attachments): 07

Page 1 of 7
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (NWPCP ICB-2)
Doc. No. :CSCEC-ITP-008
INSPECTION AND TEST PLAN – CONSTRUCTION OF ELEVATED RECTANGULAR OPEN CANAL Date : 20.03.2019
Employer : Ministry of Mahaweli Development and Environment Engineer : Program Management, Design and Supervision Consultant Contractor : China State Construction Engineering Corp. Limited
Legends Used: CSCEC= China State Construction Engineering Corp. Limited PO=Procurement Officer SA=Site Agent TS=Technical Specification SC=Sub-contractor
QAM=Quality Assurance Manager H=Hold Point MS=Method Statement PS=Particular Specification ENG=Engineer
W=Witness Point SE/F=Site Engineer/Foreman P=Perform
Level of witness required
Description of works item on which Applicable Frequency of The for Inspection and /or Responsibility for
Inspection(s) &/or
Item
No.

the Inspection and/or Testing specification and clause Acceptance Criteria Inspection and/or verifying Testing signature(s) on
Test(s) required
Activity shall be carried out reference testing record(d) is SC CSCEC ENG verifying record(s)

Part A – Safety and environment


A01 Safety Safety plan conditions Safety inspection Comply safety Each construction - P P H The Engineer
requirement activity Safety Officer
Site Engineer
A02 Environment Environment action Environmental Comply Environment Each construction - P P H The Engineer
Plan conditions inspection requirement activity Environment officer
Site Engineer
Part B – Document and material approval
B01 Verify validity of drawings Project specification/ER N/A Approved Drawings Each Location - H H W QA Manager
Site Engineer
QCI
B02 Get the approval for relevant Method Project specification/ER N/A Approved the Method Once before start - H H w QA Manager
statements statements concreting for Chief Engineer
different section
B03 Material Approval Project specification/ER Sampling and Accepted Manufacturer Once in beginning CMS H H w The Engineer
Testing and material in Material Engineer
Approved the CMS
Part C – Setting out, excavation and screed concrete
C01 Structure location setting out before Project specification/ER jointly surveyor According to the Approved Prior to starting the RSCF H H W The Engineer
excavation. Section 1.10 inspection required Design Drawings. Excavation Check list Surveyor –CSCEC
Detailed project design
drawing
MS 02 Rev A
C02 Foundation excavation. Project specification/ER jointly inspection According to the Approved Each location Check list H H W The Engineer
Section 2.3 required Design Drawings and Site Engineer –CSCEC
Detailed project design surveyor data.
drawing
MS 02 Rev A

Page 2 of 7
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (NWPCP ICB-2)
Doc. No. :CSCEC-ITP-008
INSPECTION AND TEST PLAN – CONSTRUCTION OF ELEVATED RECTANGULAR OPEN CANAL Date : 20.03.2019
Employer : Ministry of Mahaweli Development and Environment Engineer : Program Management, Design and Supervision Consultant Contractor : China State Construction Engineering Corp. Limited
Legends Used: CSCEC= China State Construction Engineering Corp. Limited PO=Procurement Officer SA=Site Agent TS=Technical Specification SC=Sub-contractor
QAM=Quality Assurance Manager H=Hold Point MS=Method Statement PS=Particular Specification ENG=Engineer
W=Witness Point SE/F=Site Engineer/Foreman P=Perform
Level of witness required
Description of works item on which Applicable Frequency of The for Inspection and /or Responsibility for
Inspection(s) &/or
Item
No.

the Inspection and/or Testing specification and clause Acceptance Criteria Inspection and/or verifying Testing signature(s) on
Test(s) required
Activity shall be carried out reference testing record(d) is SC CSCEC ENG verifying record(s)

C03 screed concrete pouring Project specification/ER jointly inspection Spread 75mm thick concrete Each location RFI H H W The Engineer
Section 3 required layer at foundation bottom Check list Site Engineer –CSCEC
MS 010 Rev A and
Detailed project design Maintain Even Flat form for
drawing the R/F work

Part D – Work Preparation before concrete pouring


D01 Foundation Locations Project specification/ER jointly surveyor According to the Approved Each location before RSCF H H W The Engineer
Setting out on the screed Concrete Section 1.10 and 2.3.1 inspection required Design Drawings and starting the Check list Surveyor -CSCEC
Detailed project design surveyor data reinforcement fixing
drawing Straightness,
MS 10 Rev A Flatness Level of screed
concrete.

D02 Chemical anchoring of 12mm Detailed project design Site inspection According to the Approved Each location before RFI H H W The Engineer
diameter road drawing required Design Drawings the pier starting the QA/QC Engineer -
MS 10 Rev A foundations should be reinforcement fixing CSCEC
Manufacture technical data anchored to the rock by Site Engineer -CSCEC
sheet 12mm diameter anchor road.
The anchoring depth shall be
300mm and chemical
anchoring method shall be
used

Page 3 of 7
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (NWPCP ICB-2)
Doc. No. :CSCEC-ITP-008
INSPECTION AND TEST PLAN – CONSTRUCTION OF ELEVATED RECTANGULAR OPEN CANAL Date : 20.03.2019
Employer : Ministry of Mahaweli Development and Environment Engineer : Program Management, Design and Supervision Consultant Contractor : China State Construction Engineering Corp. Limited
Legends Used: CSCEC= China State Construction Engineering Corp. Limited PO=Procurement Officer SA=Site Agent TS=Technical Specification SC=Sub-contractor
QAM=Quality Assurance Manager H=Hold Point MS=Method Statement PS=Particular Specification ENG=Engineer
W=Witness Point SE/F=Site Engineer/Foreman P=Perform
Level of witness required
Description of works item on which Applicable Frequency of The for Inspection and /or Responsibility for
Inspection(s) &/or
Item
No.

the Inspection and/or Testing specification and clause Acceptance Criteria Inspection and/or verifying Testing signature(s) on
Test(s) required
Activity shall be carried out reference testing record(d) is SC CSCEC ENG verifying record(s)

D03 Cutting ,Bending ,Placing and Fixing Project specification/ER Site inspection ▪ Bar sizes & spacing in Before each RFI H H W The Engineer
of reinforcement Section 3.3.3.2 required accordance with drawing / concrete pouring Check list Site Engineer -CSCEC
BS EN1992 design
Detailed project design ▪ Bars are properly fixed
drawing ▪ Correct lap lengths are
MS-10 Rev A provided
▪ Nominal covers are
maintained
▪ Free from loose rust, mill
scale, dried salt, release
agent or other
contamination
▪ Removal of all loose
Binding wires
▪ Compliance with structural
details (Position/Lapping/
Spacing/Links)

D04 Quality of the cover Blocks ICTAD SCA/4/1 Chapter Correct dimensions Once, before Check list
5.3.2.2 (Tolerance ± 5mm) placing the cover
BS: 8110 Section:3.1.1 • Using sand cement 1:2 ratio block
D05 Check formwork for concrete pouring Project specification/ER Site Inspection •Setting out Before each pouring RFI H H H The Engineer
Section 3.2 required • Line and level Check list Site Engineer -CSCEC
Relevant design drawings • Supporting arrangements
MS 010 Rev A and Adequacy
• Rigidity and water Tightness
• Formwork cleaned and
wetted properly
•Release agent properly
applied on correct surfaces

D06 Expansion Joint Project specification/ER Filling of these joints with Every Joint Check list
Section 3.8.2 resilient joint fillers
Detailed project design
drawing Concrete shall not be placed
MS-010 Rev A on both side of the joints at
the same time

Page 4 of 7
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (NWPCP ICB-2)
Doc. No. :CSCEC-ITP-008
INSPECTION AND TEST PLAN – CONSTRUCTION OF ELEVATED RECTANGULAR OPEN CANAL Date : 20.03.2019
Employer : Ministry of Mahaweli Development and Environment Engineer : Program Management, Design and Supervision Consultant Contractor : China State Construction Engineering Corp. Limited
Legends Used: CSCEC= China State Construction Engineering Corp. Limited PO=Procurement Officer SA=Site Agent TS=Technical Specification SC=Sub-contractor
QAM=Quality Assurance Manager H=Hold Point MS=Method Statement PS=Particular Specification ENG=Engineer
W=Witness Point SE/F=Site Engineer/Foreman P=Perform
Level of witness required
Description of works item on which Applicable Frequency of The for Inspection and /or Responsibility for
Inspection(s) &/or
Item
No.

the Inspection and/or Testing specification and clause Acceptance Criteria Inspection and/or verifying Testing signature(s) on
Test(s) required
Activity shall be carried out reference testing record(d) is SC CSCEC ENG verifying record(s)

D07 Concrete Delivery by CSCEC Plant Project specification/ER Slump Test, Correct concrete mix relevant Each concrete Concrete H H W The Engineer
Section 3.7 Concrete cube to the work concerned has delivery delivery note Site Engineer -CSCEC
Mix design Casting, and been delivered Check list
Concrete
temperature at site

D08 Slump test Mix design Testing Slump = 125mm (± 25mm) Every Section
BS EN 12350-2

D09 Temperature test Project specification/ER Testing Temperature of fresh Once before pour
Section 5.6 concrete does ( Only for special
Laboratory test plan not exceed 28° C Mix)

D10 Casting test cubes BS EN 12390-2 For Testing One sample consist 09 cubes Every 10m3 per one
Laboratory test plan test

Part E – Concrete Pouring


E01 Concrete pouring Approved Mix design Site Inspection ▪ Concrete dropped height Each concrete RFI H H W The Engineer
Project specification/ER Required not less than 1.2 m delivery Check list Site Engineer -CSCEC
Section 3.7 ▪ In foundations, walls and
MS 010 Rev A columns concrete shall be
placed in horizontal layers
not exceeding 0.4 meter
deep unless otherwise
designed and latency shall
be removed between initial
and final setting Should
proceed
▪ Continuous concreting,
without any forming
construction joints

Page 5 of 7
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (NWPCP ICB-2)
Doc. No. :CSCEC-ITP-008
INSPECTION AND TEST PLAN – CONSTRUCTION OF ELEVATED RECTANGULAR OPEN CANAL Date : 20.03.2019
Employer : Ministry of Mahaweli Development and Environment Engineer : Program Management, Design and Supervision Consultant Contractor : China State Construction Engineering Corp. Limited
Legends Used: CSCEC= China State Construction Engineering Corp. Limited PO=Procurement Officer SA=Site Agent TS=Technical Specification SC=Sub-contractor
QAM=Quality Assurance Manager H=Hold Point MS=Method Statement PS=Particular Specification ENG=Engineer
W=Witness Point SE/F=Site Engineer/Foreman P=Perform
Level of witness required
Description of works item on which Applicable Frequency of The for Inspection and /or Responsibility for
Inspection(s) &/or
Item
No.

the Inspection and/or Testing specification and clause Acceptance Criteria Inspection and/or verifying Testing signature(s) on
Test(s) required
Activity shall be carried out reference testing record(d) is SC CSCEC ENG verifying record(s)

E02 Compaction of concrete Project specification/ER Visually Inspection Skilled and experienced For each pouring Check list H H W The Engineer
Section 3.7.3 required workman will be employed Site Engineer -CSCEC
MS 010 Rev A Each concrete layer will be
completely vibrated before
another layer of concrete is
placed upon it.
Max. distance between two
points of compaction shall be
not exceed 600mm
No re-vibration after concrete
set.

E03 Form work check during concrete Project specification/ER Site Inspection Level of concreting Every pour Check list H H W The Engineer
pouring Section 3.7.3 Required • Line and level Site Engineer -CSCEC
• Supports
• Verticality
E04 Surface finish Project specification/ER Site Inspection Tolerance from correct Every pour Check list H H W The Engineer
Section 3.7.4 Required position indicated in design Site Engineer -CSCEC
MS 010 Rev A drawings
Out Side surface +20 to -20
In side surface tolerance +5
to -5
Part F – After concrete pouring

F01 Curing Project specification/ER Site Inspection Curing shall be done for a After every pouring H H W The Engineer
Section 3.11.5.3 Required minimum 7 days The curing method Site Engineer -CSCEC
MS 010 Rev A shall be water curing
or applying of a
curing agent

F02 Removal of formwork Project specification/ER Site Inspection • Sides of foundations, Every structure Check list H H W The Engineer
Section 3.2.2.6 Required column, beams and wall Site Engineer -CSCEC
MS 010 Rev A formworks are removed 2
days

Page 6 of 7
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (NWPCP ICB-2)
Doc. No. :CSCEC-ITP-008
INSPECTION AND TEST PLAN – CONSTRUCTION OF ELEVATED RECTANGULAR OPEN CANAL Date : 20.03.2019
Employer : Ministry of Mahaweli Development and Environment Engineer : Program Management, Design and Supervision Consultant Contractor : China State Construction Engineering Corp. Limited
Legends Used: CSCEC= China State Construction Engineering Corp. Limited PO=Procurement Officer SA=Site Agent TS=Technical Specification SC=Sub-contractor
QAM=Quality Assurance Manager H=Hold Point MS=Method Statement PS=Particular Specification ENG=Engineer
W=Witness Point SE/F=Site Engineer/Foreman P=Perform
Level of witness required
Description of works item on which Applicable Frequency of The for Inspection and /or Responsibility for
Inspection(s) &/or
Item
No.

the Inspection and/or Testing specification and clause Acceptance Criteria Inspection and/or verifying Testing signature(s) on
Test(s) required
Activity shall be carried out reference testing record(d) is SC CSCEC ENG verifying record(s)

F03 7 days strength Project specification/ER Compressive Test The 7, day's strength may be The average value H H W The Engineer
Section 3.5.6.7 taken to be 75% of the 28 of 3 cubes made Site Engineer -CSCEC
ICTAD Publication, day cube strength. from the same
SCAl4/1 section 5.4.9 sample

F04 28 days strength Project specification/ER Compressive Test 2 Mean of the two results The average value H H W The Engineer
Section 3.5.6.7 shall be taken as the test of 3 cubes made Site Engineer -CSCEC
ICTAD Publication, result from the same
SCAl4/1 section 5.4.9 sample
Approved laboratory test If 2 consecutive test results
plan (ie. A cube test) are checked,
BS EN 12390-2 the average should be 1
N/mm2 more than the
characteristic strength
specified for 28 days.
Similarly, for 3 consecutive
test results ~6 cubes results)
it will be +2N/mm and for 4
consecutive test results, it will
be +3 N/mm2

If anyone test result is


considered (ie, average of 2
cube test) it should not be
less than characteristic
strength minus 3 N/mm2
F05 Final finishing inspection Project specification/ER Site Inspection The product meets design Each element RFI H H W The Engineer
Section 3.2.3 required requirements as well as Check list Site Engineer -CSCEC
quality requirements.

Part G- Back Filling of Structure

G01 Back Filling of Structure According to the approved Site Inspection Suitable material for Required section RFI H H W The Engineer
drawings required Backfilling compacted to Laboratory Site Engineer -CMC
And Site testing required densities. test reports

Page 7 of 7
RECORD SHEET FOR
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (NWPCP ICB-2)
CONSTRUCTION SETTING OUT
Employer: Ministry of Mahaweli Engineer: Program Management, Design and Supervision Contractor: China State Construction & SURVEY
Development and Environment Consultant (PMDSC) Engineering Corp. Limited Page No:

Section: Inspection date:


Structure: Instrument type, Number &Temperature:
Location: Drawing reference:
Between the Survey Point and
Design Coordinate of the Survey Point Actual Coordinate of the Survey Point Defference
Chainage of Station
Remarks
Survey Point Directional
X Y Z
Angle
Distance X Y Z △X △Y △Z

Survey Diagram or Illustration:


Design Coordinate of the Station Point: X: Y: Z:
Design Coordinate of the Back Vision Point: X: Y: Z:
The Data of the
Actual Coordinate of the Back Vision Pint: X: Y: Z:
contro Points
Directional Angle: Distance (m):

Height of Instrumrnt (m): Height of Prism (m):

Position,Name,Date & Signature Position,Name,Date & Signature Position,Name,Date & Signature Position,Name,Date & Signature
Surveyed By: Calculated By: Certified By CSCEC: The Engineer
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (NWPCP ICB-2)
Employer: Ministry of Mahaweli Development and Environment
Engineer: Program Management, Design and Supervision Consultant (PMDSC)
Contractor: China State Construction Engineering Corp. Limited
INSPECTION SHEET FOR BEFORE BASEMENT PREPARATION
Structure: DATE : Element ID:
Item to inspect Evaluation Remarks
EXCAVATION
Setting out of area to be excavated  Yes /  N/A

Excavation verified by engineer  Yes /  N/A

If sloped, is it at proper angle  Yes /  N/A


Classification of excavated material (hard rock, soft rock, boulders,
 Yes /  N/A
unsuitable soil, slipped material, sub grade replacement)
After excavation checked the level  Yes /  N/A

Unsuitable material to be disposal site  Yes /  N/A

Suitable material to be storage area  Yes /  N/A

CONSTRUCTION OF LEVELING CONCRETE


Required replacement satisfied (If necessary)  Yes /  N/A

Spread 75 mm thk Screed concrete layer under the foundation  Yes /  N/A

Maintain Even Flat form for the R/F work  Yes /  N/A
LOCATION SETTING OUT ON THE LEVELLING CONCRETE

Setting out of the structure on the leveling concrete surface  Yes /  N/A

SAFETY AND ENVIRONMENT


Safety Measures(including lighting arrangement if needed only)  Yes /  N/A

Environmental Measures  Yes /  N/A

Remarks:

Checked by Position Name Signature Date


Contractor :

Consultant Engineer

Accepted by contractor Reviewed by Engineer

Name, Signature & Date Name, Signature & Date


Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (NWPCP ICB-2)
Employer: Ministry of Mahaweli Development and Environment
Engineer: Program Management, Design and Supervision Consultant (PMDSC)
Contractor: China State Construction Engineering Corp. Limited

INSPECTION SHEET FOR PRIOR TO PLACEMENT OF CONCRETE -IN SITU CONCRETE


Structure: DATE : Element ID:
Item to inspect Evaluation Remarks
BED PREPERATION
Screed concrete satisfied  Yes /  N/A

FORMWORK
Length of the formwork  Yes /  N/A
Width of the formwork  Yes /  N/A
Position of the formwork  Yes /  N/A

Stability and Rigidity (Properly fixed with supporters)  Yes /  N/A

Check cleanliness / free of dirt, debris & wash water  Yes /  N/A
Forms release agent applied  Yes /  N/A
Level marked  Yes /  N/A
Sealed against grout leaking  Yes /  N/A

REINFORCEMENT
Approve Material Used  Yes /  N/A
R/F Free from loose rust and mill scale, dirt, oil, grease and paint  Yes /  N/A
Placed in positioning according to the Drawings  Yes /  N/A
Correct bar sizes / spacing  Yes /  N/A
Correct lap length  Yes /  N/A
Properly fixed  Yes /  N/A
Layer of Bar seperated by Spacer Bars (If Necessary)  Yes /  N/A
COVERING

Cover required  Yes /  N/A


Cover correct  Yes /  N/A
Properly fixed  Yes /  N/A

Checked by Position Name Signature Date

Contractor :

Consultant Engineer

Accepted by contractor Reviewed by Engineer

Name, Signature & Date Name, Signature & Date


Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (NWPCP ICB-2)
Employer: Ministry of Mahaweli Development and Environment
Engineer: Program Management, Design and Supervision Consultant (PMDSC)
Contractor: China State Construction Engineering Corp. Limited
INSPECTION SHEET FOR REINFORCEMENT SHEET NO:

Structure: DATE : Element ID:


Total
Bar Diameter No. of No. of Total Length
No. Length (mm) Shape Verification Remarks
Mark (mm) Members Bars (m)
of Bars

Checked by Position Name Signature Date

Contractor :

Consultant Engineer

Accepted by contractor Reviewed by Engineer

Name, Signature & Date Name, Signature & Date


Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (NWPCP ICB-2)
Employer: Ministry of Mahaweli Development and Environment
Engineer: Program Management, Design and Supervision Consultant (PMDSC)
Contractor: China State Construction Engineering Corp. Limited

INSPECTION SHEET FOR PLACEMENT OF CONCRETE - IN SITU


Structure: DATE : Element ID:
Item to inspect Evaluation Remarks
CONCRETE DELIVERY TO SITE
Acceptance of mix design  Yes /  N/A
Concrete Grade  Yes /  N/A
Delivery slip no’s  Yes /  N/A
Slump for Workability of concrete  Yes /  N/A
Temperature  Yes /  N/A
Test sample taken  Yes /  N/A
Test sample reference  Yes /  N/A

CONCRETE POURING

Concrete joint(s) properly wetted  Yes /  N/A

Starting time

Concrete placed and compacted in the formwork (Concert casting


sequence)
 Yes /  N/A

Horizontal concrete layer thickness not exceed required limits  Yes /  N/A

Concrete dropped high not exceed the required limits  Yes /  N/A

Using approved vibratos for compaction  Yes /  N/A

Continuous concreting, without any forming construction joints  Yes /  N/A

Finish time

Surface finishes  Yes /  N/A

SAFETY AND ENVIRONMENT


Safety Measures(including lighting arrangement if needed only)  Yes /  N/A
Environmental Measures  Yes /  N/A

Checked by Position Name Signature Date

Contractor :

Consultant Engineer

Accepted by contractor Reviewed by Engineer

Name, Signature & Date Name, Signature & Date


Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (NWPCP ICB-2)
Employer: Ministry of Mahaweli Development and Environment
Engineer: Program Management, Design and Supervision Consultant (PMDSC)
Contractor: China State Construction Engineering Corp. Limited

INSPECTION AFTER IN SITU CONCRETE

Structure: DATE : Element ID:

Item to inspect Evaluation Remarks

CONCRETE CURING

Commence curing following initial set  Yes /  N/A

Curing carried out for required period of time  Yes /  N/A

Approved method of curing used (Same method used for Mockup will be
applied on pile cap as agreed)
 Yes /  N/A

FORMWORK STRIKING

Minimum time period from concrete pouring  Yes /  N/A

Check damaged to finished surfaces

Check laitance & existence of cracks  Yes /  N/A

CONCRETE FINISH

Check concrete finish  Yes /  N/A

Properly green cut the required surfaces (if applicable)  Yes /  N/A

RECTIFICATION OF DEFECTIVE CONCRETE SURFACE

Repairing defective area by using construction grout as per the


manufacture’s recommendations
 Yes /  N/A

Checked by Position Name Signature Date

Contractor :

Consultant Engineer

Accepted by contractor Reviewed by Engineer

Name, Signature & Date Name, Signature & Date