MS-08Method Statement For Construction of Elevated Rectangular Open Canal
MS-08Method Statement For Construction of Elevated Rectangular Open Canal
A= Approved
AN= Approved except as Noted
RR= Return for Correction and Resubmissron
Since the design has been changed for the elevated rectangular canal further comments for the
above submission are as follows.
1. NW-102-C-MS-08 Plan view shows design for previous EADs. Please update for revisions.
2. How to maintain formwork alignments, slope changes specially at the wing walls.
3. How to support wall formwork with base.
The approval of drawings and documents shall not relieve the Contractor of any of his duties, obligations or responsibilities
under the Contract.
Checked by PMDSC
2tto?/r:l?
Date
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)
MS-008
Rev.A
Ref.Letter
No :
1
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)
Contents
1. Introduction ..................................................................................................................................3
2
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)
1. Introduction
The proposed irrigation canal line is going over existing roads and some essential structures
which cannot be removed due to proposed canal. Elevated canal sections are constructing in
those areas to allow required provisions for such kind of structures or roads. The locations of
the elevated canal sections are tabulated below for easy reference.
The elevated rectangular open canal is mainly consist of few structure parts as specified below
1. Pier foundations
2. Piers
3. Wing wall foundations
4. Wing walls
5. Open rectangular canal bottom slab
6. Open rectangular canal walls
This method statement is explained and confirmed the construction procedure, materials, resource
allocation and relevant documents/ standards used to construct the elevated rectangular open canal
3
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)
Table 4.2 Equipment and machinery plan for elevated rectangular open canal construction works.
Equipment Numbers Remarks
Concrete batching plant with relevant 01
machinery and equipments
Concrete pump car 01
Crane 01
Mobile concrete pump stationary concrete 01
pump
Vibrating roller ≥ 10𝑇 02
Hand propelled vibration roller 02
Poker vibrators 06
Generator 15kW 02
Crawler excavator , 150kW 02
Crawler excavator , 65kW 02
Reinforcement bending machine 02
Water bowser 02
4
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)
However if any parallel works are required among above work activities as per actual site
conditions, then it shall be followed as per engineer’s instructions and concern.
5
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)
Figure 02: Main segments and construction sequence of elevated open rectangular canal
6
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)
drawings or directed by the Engineer. The selection of material for the formwork, the design of the
formwork and its fixing shall be such as to achieve the required surface finish without any
subsequent remedial work. For the purpose of formwork and false-work design, a value of
25kN/m3 for the density of concrete shall be used.
Formwork and false work shall be true to the required shape and size, shall conform to the
established alignment and grade. As well as formworks and false works shall be constructed with
sufficient strength and rigidity such that they will support the loads imposed on them by the fresh
concrete together with all additional loads imposed by placing and vibrating equipment and by
construction traffic while maintaining their position and shape.
Formwork shall be so designed that it may be easily removed from the work without damage to
the faces of the concrete. It shall also incorporate provisions for making minor adjustments in
position. The formwork of the new lift shall overlap the hardened concrete by not less than 100mm
to prevent abrupt irregularities.
Release agents used for de-moulding shall not stain the concrete or affect its properties in any way.
Before any reinforcement is placed into position within erected formwork and before formwork is
erected adjacent to any fixed reinforcement, the formwork will be thoroughly cleaned and applied
a release agent.
Before concrete placing commences, all wedges and other adjusting devices shall be secured
against movement during concrete placing and the contractor shall maintain careful observation on
the formwork during the concrete pouring to ensure that no movement occurs. The formwork type
basically divided into few different parts considering the construction sequence as shown below
The relevant annex numbers for design calculations are tabulated below for easy reference.
Table 4.3: Reference documents for formwork calculation
Annex Description
number
Annex-01 Design calculations of timber formwork for basement of piers
Annex-02 Design calculations of steel formwork for basement of piers
Annex-03 Design calculations of timber formwork for piers
Annex-04 Design calculations of steel formwork for piers
Annex-05 Design calculations of timber formwork for basement of wing walls
Annex-06 Design calculations of steel formwork for basement of wing walls
Annex-07 Design calculations of timber formwork for wing walls
Annex-08 Design calculations of steel formwork for wing walls
Annex-09 Design calculations of timber formwork for soffit of bottom slab of open
rectangular canal
Annex-10 Design calculations of steel formwork for soffit of bottom slab of open
rectangular canal
Annex-11 Design calculations of timber formwork for side of bottom slab of rectangular
open canal
Annex-12 Design calculations of steel formwork for side of bottom slab of rectangular
open canal
Annex-13 Design calculations of timber formwork for walls of open rectangular canal
Annex-14 Design calculations of steel formwork for walls of open rectangular canal
As well as it is expected to use system formwork in later for structure construction works as per
site requirements to achieve the acceptable progress of the works. However that detail will be
submitted later to the engineer.
4.3.4 Reinforcement work
Reinforcement used in this project will be purchased from qualified supplier. The reinforcement
shall be stored on site separated into the various sizes either in racks or on a hard impermeable
base in such a manner that it remains straight and free from contamination. Reinforcement supplied
by different manufacturers shall be stored separately. Any reinforcement which is likely to remain
in storage for a long period shall be protected from the weather so as to avoid corrosion and pitting.
All the test report and other quality certificate of the reinforcement will be submitted to the
Engineer for checking and approval before using in the permanent works. The reinforcement shall
be cut accurately to length and bend to the shape shown on the approved bar bending schedules
within the acceptable dimensional tolerances. After bending, reinforcement will be thoroughly
cleared, and all dirty, scale, loose rust, oil and other contaminants removed before it is placed in
8
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)
the permanent works, and bars will be securely tied together in bundles or groups and legibly
labeled for easy identification.
Binding with wire will be the main connection patterns, the lap length will conform to the standards
as approved by the Engineer. Reinforcement will be fixed rigidly so that no movement can occur
during concrete placing. The reinforcement bars shall be positioned in right position within a
dimensional tolerance of ±20mm in any direction parallel to a concrete face and within a tolerance
of ±5mm perpendicular to a face, provided that the cover is not thereby decreased below the
minimum shown on the drawings
Spacer blocks shall be used for ensuring that the correct cover is maintained on the reinforcement.
The block shall be as small as practicable and of a shape agreed by the Engineer. As well as
reinforcement bars should be cleaned prior to start the concrete pouring works. All reinforcement
shall be inspected in place and approved by the Engineer before placing the concrete.
In addition to above specifications, the pier foundations should be anchored to the rock by 12mm
diameter anchor road. The anchoring depth shall be 300mm and chemical anchoring method shall
be used as specified in design drawings. The material specifications of anchoring chemical shall
be submitted later to the engineer’s review and approval.
Figure 04: Anchoring connection between pier foundation and rock specified in design drawings
4.3.5 Placing and curing of concrete
No concrete shall be placed at the construction site until all formwork, installation of embedded
parts, reinforcing steel, and surfaces against which concrete is to be cast have been inspected and
a written approval given by the Engineer.
As well as construction joints are formed in structures due to construction sequences which were
explained in above chapters. Those construction joint should be treated to ensure the proper
interface bond with the subsequent concrete lift. Therefore, green cutting shall be carried out for
9
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)
first concrete lift (construction joint) using a high pressure air-water jet. As well as a bonding agent
or starter concrete layer shall be laid over construction joint just before to lay new concrete. The
starter concrete layer shall be prepared by mixing additional 50kg of cement per 1m3 of concrete.
The thickness of starter concrete layer shall be 50mm.
The concrete shall be transported by truck mixers from batching plant to site. The time elapsing
between mixing and placing a batch of concrete shall be as short as practicable. In any case no
longer as will permit completion of placing and compaction before the onset of initial set. If the
placing of any batch of concrete is delayed beyond this period, the concrete shall not be placed in
the permanent works. Concrete left in the trucks, cars or skips has to be completely wasted before
a new concrete batch is loaded.
The mobile concrete pump car, mobile concrete pump stationary concrete pump or crane shall be
used for concrete pumping. The vibrators for use and as standby shall be ample for the requirements
during the placement. Unless otherwise agreed by the Engineer concrete shall not be allowed to
fall freely through a height greater than 1.2 m.
Each layer of concrete shall be compacted by vibration while and after being placed in position to
form a dense, homogeneous material free from voids. The concrete shall be worked up hard against
adjoining surfaces. Each concrete layer shall be vibrated completely before another layer of
concrete is placed upon it. In generally the concrete shall be placed in layers not exceeding 500mm
(R/F concrete) in depth after compaction. As well as any case the thickness of any layer of
concrete shall not be less than four times of the maximum nominal size of aggregate. However if
the layer thickness of concretes are unable to maintain within the above limitation due to any
special case, then contractor shall be obtained engineer’s instruction.
Immersion vibrators shall penetrate the full depth of the layer and shall enter the underlying layer
so as to ensure proper integration of successive layers. They shall be inserted in a near-vertical
position at sufficiently close regular intervals, which shall be within the distance over which
vibration is visibly effective and in any case shall not exceed 600 mm, for long enough time to
ensure proper compaction, and shall be withdrawn slowly to prevent the formation of voids. The
concrete shall be vibrated until it presents a compact reflecting surface and the bubbles of entrapped
air have ceased to escape. Over-vibration causing to segregation, surface laitance, or leakage of
grout through formwork.
10
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)
The maximum permitted temperature rises and the temperature distribution in concrete after
placement will be determined by the Engineer based on the laboratory test performed prior to
start of concrete work using the actual cement, concrete mix proportions, and diffusivity for the
concrete under consideration, and/or by actual field monitoring.
Concrete shall be protected during the first stage of hardening from loss of moisture and from the
development of temperature differentials within the concrete sufficient to cause cracking. The
methods used for curing shall not cause damage of any kind to the concrete.
The curing shall be carried out using approved curing agent and water curing. Curing shall be
continued for as long as may be necessary to achieve the above objectives. All concrete shall be
cured for a period of not less than 14 consecutive days or until the concrete is covered by later
construction, whichever is the shorter period.
5. Formwork removal
It is the contractor’s sole responsibility to avoid damages to concrete surfaces during the form work
ejecting process. Since several type of basic structural elements are available in elevated
rectangular open canal structures and the formwork & false work periods are different from
structure to structure. The time for formwork removal specified in specification (Clause 3.2.2.6) is
as follows. But these periods are subjected to engineer’s prior approval. As well as all the defect
and other required repairs should be carried out using approved repair materials.
11
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)
7. Backfilling works
After completion of the structure, tie holes, defects and repairing works shall be finished and should
be obtained the engineer’s concern. Prior to start the backfill, the excavated area shall be dewatered
until filled bed exposes. The debris and other unsuitable materials within the excavation area
should be removed before to start backfilling work. The back filling works shall be carried out
layer by layer and the compaction shall be checked timely as per engineer’s requirements. The
light compaction machines and equipment are used to compact the back fill soil adjacent to the
structure. The backfilling work is carried out both sides simultaneously. The backfilling area and
soil type shall be as specified in design drawings.
1. The construction must be implemented strictly according to the approved drawings and
specifications.
2. Material shall be strictly in compliance mentioned herein the method statement and design
drawings.
3. Reinforcements are only from approved suppliers, brands, and in an acceptable conditions,
12
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)
5. It is forbidden to stand within the operating area of a running machine. All the operations
of machines shall strictly conform to the regulated process of safety operation.
6. If the soil structure is unstable, collapse happens, water level rises suddenly or any other
dangers occur, then all the site staffs should immediately stop the work and be evacuated
to safe places. They can go back and resume the construction only after the site is
confirmed to be safe.
7. Separate departments will be assigned to maintain the safety regulations at construction
area and they will care and executive all the safety requirements of workers as well as
public.
13
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (from 5+250km to 22+300)
Annexures
14
Annex 01
Span: L 0.3 m
Check Deflection:
Table 45, BS5268 Young's Modulus of plywood: E 4,750 N/mm2
Net-sectional Moment of Inertia: I 28.13 cm4
Permissible Deflection = L/400: δp 0.75 mm
Span: L 0.45 m
Check Deflection:
Table 7,BS 5268 Young's Modulus of Timber: E 6,800 N/mm2
Net-sectional Moment of Inertia: I 416.67 cm4
Permissible Deflection = L/400: δp 1.13 mm
Span: L 0.80 m
Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 2.67 mm
Span: L 0.450 m
Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.50 mm
Span: L 0.600 m
Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 2.00 mm
Span: L 0.750 m
Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 2.50 mm
Span: L 0.300 m
Check Deflection:
Table 45, BS5268 Young's Modulus of plywood: E 4,750 N/mm2
Span: L 0.275 m
Check Deflection:
Table 7,BS 5268 Young's Modulus of Timber: E 6,800 N/mm2
Span: L 0.600 m
Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 2.00 mm
Span: L 0.450 m
Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.50 mm
Span: L 0.600 m
Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 2.00 mm
Span: L 0.450 m
Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.50 mm
Span: L 0.4 m
Check Deflection:
Table 45, BS5268 Young's Modulus of plywood: E 4,750 N/mm2
Net-sectional Moment of Inertia: I 28.13 cm4
Permissible Deflection = L/400: δp 1.00 mm
Span: L 0.4 m
Check Deflection:
Table 7,BS 5268 Young's Modulus of Timber: E 6,800 N/mm2
Net-sectional Moment of Inertia: I 416.67 cm4
Permissible Deflection = L/400: δp 1.00 mm
Span: L 0.81 m
Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 2.71 mm
Span: L 0.400 m
Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.33 mm
Span: L 0.400 m
Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.33 mm
Span: L 0.750 m
Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 2.50 mm
Span: L 0.250 m
Check Deflection:
Table 45, BS5268 Young's Modulus of plywood: E 4,750 N/mm2
Span: L 0.24 m
Check Deflection:
Table 7,BS 5268 Young's Modulus of Timber: E 6,800 N/mm2
Span: L 0.500 m
Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.67 mm
Span: L 0.450 m
Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.50 mm
Span: L 0.500 m
Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.67 mm
Span: L 0.450 m
Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.50 mm
Span: L 0.300 m
Check Deflection:
Table 45, BS5268 Young's Modulus of plywood: E 4,750 N/mm2
Span: L 0.400 m
Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.33 mm
Span: L 0.5 m
Check Deflection:
Table 7,BS 5268 Young's Modulus of Timber: E 6,800 N/mm2
Span: L 0.400 m
Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.33 mm
Span: L 0.5 m
Check Deflection:
Table 7,BS 5268 Young's Modulus of Timber: E 6,800 N/mm2
Span: L 0.3 m
Check Deflection:
Table 45, BS5268 Young's Modulus of plywood: E 4,750 N/mm2
Net-sectional Moment of Inertia: I 28.13 cm4
Permissible Deflection = L/400: δp 0.75 mm
Span: L 0.4 m
Check Deflection:
Table 7,BS 5268 Young's Modulus of Timber: E 6,800 N/mm2
Net-sectional Moment of Inertia: I 416.67 cm4
Permissible Deflection = L/400: δp 1.00 mm
Span: L 0.81 m
Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 2.70 mm
Span: L 0.400 m
Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.33 mm
Span: L 0.600 m
Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 2.00 mm
Span: L 0.750 m
Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 2.50 mm
Span: L 0.250 m
Check Deflection:
Table 45, BS5268 Young's Modulus of plywood: E 4,750 N/mm2
Span: L 0.30 m
Check Deflection:
Table 7,BS 5268 Young's Modulus of Timber: E 6,800 N/mm2
Span: L 0.600 m
Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 2.00 mm
Span: L 0.450 m
Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.50 mm
Span: L 0.600 m
Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 2.00 mm
Span: L 0.450 m
Check Deflection:
Clause 2.5 and 3.1.2,
Young's Modulus of Steel: E 206,000 N/mm2
BS5950/1
Net-sectional Moment of Inertia: I 12.19 cm4
Permissible Deflection = L/300: δp 1.50 mm
2440
PLYWOOD
FORMWORK MODEL 48mm GI PIPE 15 mm THICK
THREADED BAR.
L
15 mm THICK
Ø
300 300 300 300 300 300 300 300 PLYWOOD BOARD
PLYWOOD BOARD 407 813 813 407
275
275
50 x 100 mm
1000
TIMBER
1000
1000
450
450
DETAIL-A
275
275
50 X 100mm
TIMBER.
Ø48mm GI PIPE
ELEVATION
SECTION ELEVATION SECTION
15 mm THICK
PLYWOOD BOARD 407 813 813 407
300 300 300 300 300 300 300 300
50 X 100mmTIMBER.
PLAN 2X Ø48mm GI PIPE.
THREADED BAR.
PLYWOOD FORMWORK MODEL ARRANGEMENT PLAN
FALSWORK ARRANGEMENT
15mm THICK
PLYWOOD BOARD
NOTE
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS STATED OTHERWISE.
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-008
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 01 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE SIDE FORMWORK FOR PIER FOUNDATION
DATE DATE TIMBER FORMWORK PANEL DETAILS
AS SHOWN A3 -
PLATE : 002
1500
375 750 375
150 300 300 300 300 150
50
Ø48mm
GI BAR
150 100
100
275
275
3mm THICK
STEEL PLATE
300
150
3mm THICK STEEL
STEEL PLATE FORMWORK
1000
450
450
150
1000
300
150
DETAIL-A
150
275
275
300
150
3mm THICK STEEL PLATE ELEVATION SECTION
3mm THICK STEEL PLATE
FALSWORK ARRANGEMENT
STEEL
STEEL FORMWORK
FORMWORK
Ø12mm Ø12mm
THREADED BAR THREADED BAR
NOTE
DETAIL-A (OPTION 01) DETAIL-A (OPTION-02) 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS STATED OTHERWISE.
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR. 2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-008
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 02 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE SIDE FORMWORK FOR PIER FOUNDATION
DATE DATE STEEL FORMWORK PANEL DETAILS
AS SHOWN A3 -
PLATE : 003
PLAN
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR. 2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 03 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE SIDE FORMWORK FOR PIER FOUNDATION
DATE DATE FORMWORK PANEL SUPPORTING DETAILS
AS SHOWN A3 -
PLATE : 004
200
15mm THICK
PLYWOOD BOARD
250
600
600
Ø48mm GI PIPE
15mm THICK
PLYWOOD BOARD
250
250
Ø48mm
GI PIPE Ø12mm
600
600
THREADED BAR
250
BUTTERFLY
P-CONE NUT
2500
2500
50 x 100mm 15mm THICK
250
600
600
250
250
PLYWOOD BOARD
DETAIL-A
600
600
250
50 Ø12mm
50 x 100mm TIMBER THREADED BAR
SECTION
ELEVATION SECTION ELEVATION PVC PIPE
BUTTERFLY
NUT
1220
DETAIL-A (OPTION 02)
1170
50 x 100mm TIMBER
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 04 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE
ELEVATED RECTANGULAR OPEN CANAL
DATE DATE
TIMBER FORMWORK PANEL DETAILS FOR PIERS AS SHOWN A3 -
PLATE : 005
GI PIPE OR
SCAFFOLDING FRAME
THREAD BARS SCREW JACK FOR HORIZONTAL
SUPPORTS OF THE FORMWORK
PANEL (SPACING SHALL BE 0.45m)
B B
GI PIPE OR SCAFFOLDING
FRAME TO SUPPORT THE A
FORMWORK PLAN
SECTION A-A SECTION A-A
STAGE ONE CONCRETING STAGE TWO CONCRETING
NOTE:
1. PLEASE NOTE THAT IF THREAD BARS (INTERNAL SUPPORT) ARE THREAD BARS
USED, THEN ACRO JACK SUPPORT ARE REQUIRED ONLY FOR SCREW JACK FOR HORIZONTAL
MAINTAIN THE VERTICALITY OF WALLS. HOWEVER THREAD BAR OR SUPPORTS OF THE FORMWORK
ACRO JACK SUPPORTS SHOULD USE AT SPECIFIED SPACINGS. PANEL (SPACING SHALL BE 0.45m)
GI PIPE OR
SCAFFOLDING
FRAME
GI PIPE OR
THREAD BARS
SCAFFOLDING FRAME
SCREW JACK FOR HORIZONTAL
SUPPORTS OF THE FORMWORK
PANEL (SPACING SHALL BE 0.45m)
SECTION B-B
STAGE ONE CONCRETING SECTION B-B
STAGE TWO CONCRETING
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR. 2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 05 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE
DATE DATE
TIMBER FORMWORK & FALSWORK ARRANGEMENT FOR PIERS
AS SHOWN A3 -
PLATE : 006
STEEL FORMWORK PANEL FOR PIERS
(ELEVATED RECTANGULAR OPEN CANAL)
1500
150 300 300 300 300 150
100
150
300
150
600
600
150
300
150
3mm THICK
150
STEEL PLATE
300
150
600
600
150
300
150
2500
3mm THICK
STEEL PLATE
150
300
150
600
600
150
300
150
150
300
150
600
600
150
300
150
DETAIL-A
50
3mm THICK STEEL PLATE
3mm THICK STEEL PLATE
ELEVATION
ELEVATION SECTION SECTION
1500
STEEL FORMWORK MODEL ARRANGEMENT
187.5 375 375 375 187.5
Ø48mm GI PIPE
STEEL
STEEL
FORMWORK
FORMWORK
Ø12mm Ø12mm
THREADED BAR THREADED BAR
BUTTERFLY 3mm THICK STEEL PLATE THREADED BAR
P-CONE NUT BUTTERFLY
PVC PIPE
NUT
Ø48mm GI PIPE Ø48mm GI PIPE
PLAN
FALSWORK ARRANGEMENT
DETAIL-A (OPTION 01) DETAIL-A (OPTION 02) NOTE
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS STATED OTHERWISE.
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR. 2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 06 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE
DATE DATE
STEEL FORMWORK PANEL DETAILS FOR PIERS AS SHOWN A3 -
PLATE : 007
GI PIPE OR
SCAFFOLDING FRAME
GI PIPE OR SCAFFOLDING
A
PLAN
FRAME TO SUPPORT THE
FORMWORK SECTION A-A SECTION A-A
STAGE ONE CONCRETING STAGE TWO CONCRETING
GI PIPE OR
SCAFFOLDING
FRAME
GI PIPE OR
SCAFFOLDING FRAME THREAD BARS
SCREW JACK FOR HORIZONTAL
SUPPORTS OF THE FORMWORK
PANEL (SPACING SHALL BE 0.45m)
SECTION B-B
STAGE ONE CONCRETING SECTION B-B
STAGE TWO CONCRETING
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR. 2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 07 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE STEEL FORMWORK & FALSWORK ARRANGEMENT FOR PIERS
DATE DATE
AS SHOWN A3 -
PLATE : 008
50 x 100 mm
TIMBER
200
400
400
400
200
50 X 100mm
TIMBER.
15 mm THICK
PLYWOOD BOARD 407 813 813 407
813 813 813
50 X 100mmTIMBER.
2X Ø48mm GI PIPE.
PLAN THREADED BAR.
FALSWORK ARRANGEMENT
15mm THICK
PLYWOOD BOARD
NOTE
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS STATED OTHERWISE.
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR. 2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
NW-I02-C-MS-08
Engineering
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 08 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE ELEVATED RECTANGULAR OPEN CANAL
DATE DATE TIMBER FORMWORK PANEL DETAILS FOR WING WALL FOUNDATION AS SHOWN A3 -
PLATE : 009
1500
150 300 300 300 300 150
50
375 750 375
3mm THICK
100
STEEL PLATE
200
200
3mm THICK
150 150
400
200
200
3mm THICK STEEL PLATE
3mm THICK STEEL PLATE
1500
NOTE
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS STATED OTHERWISE.
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 08 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE
ELEVATED RECTANGULAR OPEN CANAL
DATE DATE
STEEL FORMWORK FOR WING WALL FOUNDATION AS SHOWN A3 -
PLATE : 010
TIMBER & STEEL FORMWORK - FALSEWORK ARRANGEMENT FOR WING WALL FOUNDATION
(ELEVATED RECTANGULAR OPEN CANAL)
B B
A
PLAN
SCREW JACK FOR DIAGONAL BRACING SCREW JACK FOR DIAGONAL BRACING
(HORIZONTAL SPACING SHOULD BE 0.81m (HORIZONTAL SPACING SHOULD BE 0.81m
FOR TIMBER FORMWORK & 0.75m FOR FOR TIMBER FORMWORK & 0.75m FOR
STEEL FORMWORK). STEEL FORMWORK).
DOWEL BAR (Ø12mm STEEL BAR) DOWEL BAR (Ø12mm STEEL BAR)
THE SPACING SHALL BE 1m. THE SPACING SHALL BE 1m.
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR..2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 10 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE
DATE DATE
SIDE FORMWORK FOR WING WALL FOUNDATION
AS SHOWN A3 -
FORMWORK PANEL SUPPORTING DETAILS
PLATE : 011
TIMBER FORMWORK PANEL FOR WING WALL
1220
(ELEVATED OPEN RECTANGULAR CANAL)
1170 130 240 240 240 240 130
200
250
250
250
15mm THICK
500
500
PLYWOOD BOARD
250
15mm THICK
Ø48mm GI PIPE
PLYWOOD BOARD
250
Ø48mm
500
500
GI PIPE
250
2500
2500
15mm THICK Ø12mm
50 x 100mm
250
500
500
BUTTERFLY
P-CONE NUT
250
250
500
500
250
DETAIL-A
250
250
250
50 x 100mm TIMBER
1220
1170 Ø12mm
THREADED BAR
50 x 100mm TIMBER
BUTTERFLY
15mm THICK PLYWOOD PLAN PVC PIPE NUT
15mm THICK PLAN 50 x 100mm TIMBER
BOARD
PLYWOOD BOARD
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 11 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE
DATE DATE
TIMBER FORMWORK PANEL DETAILS FOR WING WALL AS SHOWN A3 -
PLATE : 012
GI PIPE OR
SCAFFOLDING FRAME GI PIPE OR SCREW JACK WITH GI PIPES
SCREW JACK WITH GI PIPES SCAFFOLDING FRAME FOR HORIZONTAL SUPPORT.
FOR HORIZONTAL SUPPORT. THE SPACING SHALL BE 0.45m.
THE SPACING SHALL BE 0.45m.
GI PIPE OR
SCAFFOLDING FRAME
A
PLAN
GI PIPE OR SCREW JACK WITH GI PIPES
SCAFFOLDING FRAME FOR HORIZONTAL SUPPORT.
THE SPACING SHALL BE 0.45m.
GI PIPE OR
SCAFFOLDING FRAME
SECTION A-A
STAGE TWO CONCRETING
NOTE:
1. PLEASE NOTE THAT IF THREAD BARS (INTERNAL SUPPORT) ARE
USED, THEN ACRO JACK SUPPORT ARE REQUIRED ONLY FOR
MAINTAIN THE VERTICALITY OF WALLS. HOWEVER THREAD BAR OR
ACRO JACK SUPPORTS SHOULD USE AT SPECIFIED SPACINGS.
SECTION A-A
STAGE ONE CONCRETING
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 12 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE
DATE DATE
TIMBER FORMWORK & FALSWORK ARRANGEMENT FOR
AS SHOWN A3 -
WING WALLS
PLATE : 013
100
250
150
300
150
150
500
500
300
150
3mm THICK
150
STEEL PLATE
300
150
500
500
150
300
150
2500
3mm THICK
STEEL PLATE
150
300
500
500
150
150
300
150
150
500
500
300
150
DETAIL-A
150
300
250
150
3mm THICK STEEL PLATE
3mm THICK STEEL PLATE
Ø48mm GI PIPE
STEEL STEEL
FORMWORK FORMWORK
Ø12mm Ø12mm
THREADED BAR THREADED BAR
BUTTERFLY 3mm THICK STEEL PLATE THREADED BAR
BUTTERFLY
P-CONE NUT
Ø48mm
PVC PIPE
NUT PLAN
Ø48mm GI PIPE
GI PIPE FALSWORK ARRANGEMENT
DETAIL-A (DETAIL 01) DETAIL-A (OPTION 02) NOTE
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS STATED OTHERWISE.
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR. 2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 13 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE
ELEVATED RECTANGULAR OPEN CANAL
DATE DATE
STEEL FORMWORK PANEL DETAILS FOR WING WALL AS SHOWN A3 -
PLATE : 014
GI PIPE OR
SCAFFOLDING FRAME
SCREW JACK WITH GI PIPES
FOR HORIZONTAL SUPPORT.
THE SPACING SHALL BE 0.45m. SCREW JACK WITH GI PIPES
GI PIPE OR
SCAFFOLDING FRAME FOR HORIZONTAL SUPPORT.
THE SPACING SHALL BE 0.45m.
GI PIPE OR
SCAFFOLDING FRAME
A
PLAN
GI PIPE OR SCREW JACK WITH GI PIPES
SCAFFOLDING FRAME FOR HORIZONTAL SUPPORT.
THE SPACING SHALL BE 0.45m.
GI PIPE OR
SCAFFOLDING FRAME
SECTION A-A
STAGE TWO CONCRETING
NOTE:
1. PLEASE NOTE THAT IF THREAD BARS (INTERNAL SUPPORT) ARE
USED, THEN ACRO JACK SUPPORT ARE REQUIRED ONLY FOR
MAINTAIN THE VERTICALITY OF WALLS. HOWEVER THREAD BAR OR
SECTION A-A ACRO JACK SUPPORTS SHOULD USE AT SPECIFIED SPACINGS.
STAGE ONE CONCRETING
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 14 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE STEEL FORMWORK & FALSWORK ARRANGEMENT FOR
DATE DATE WING WALLS
AS SHOWN A3 -
PLATE : 015
400
50x100mm TIMBER
400
X2 X2
X1 X1
400
400
Ø48mm
GI PIPE
Y2
50x100mm TIMBER
Y1
STEEL FORMWORK
50x100mm TIMBER
50x100mm TIMBER
125 300 300 300 300 300 125 125 300 300 300 300 300 125
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 15 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE
DATE DATE
FORMWORK PANEL DETAILS FOR BOTTOM SLAB (SOFFIT) OF
AS SHOWN A3 -
OPEN RECTANGULAR CANAL
PLATE : 016
THREADED BAR.
250
50 x 100 mm
TIMBER
950
400
950
15 mm THICK
950
PLYWOOD BOARD DETAIL-A
300
50 X 100mm
TIMBER.
ELEVATION
SECTION ELEVATION SECTION
15 mm THICK
PLYWOOD BOARD 407 813 813 407
300 300 300 300 300 300 300 300
50 X 100mmTIMBER.
PLAN 2X Ø48mm GI PIPE.
THREADED BAR.
PLYWOOD FORMWORK MODEL ARRANGEMENT PLAN
FALSWORK ARRANGEMENT
15mm THICK
PLYWOOD BOARD
NOTE
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS STATED OTHERWISE.
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 16 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE BOTTOM SLAB SIDE FORMWORK (TIMBER)
DATE DATE OPEN RECTANGULAR CANAL
AS SHOWN A3 -
PLATE : 017
TIMBER FORMWORK & FALSEWORK ARRANGEMENT FOR BOTTOM SLAB OF OPEN RECTANGULAR CANAL
(ELEVATED RECTANGULAR OPEN CANAL) GI PIPE WITH SCREW JACK FOR
HORIZONTAL SUPPORT OF SIDE GI PIPE OR
FORMWORK SCAFFOLDING FRAME
GI PIPE OR
SPACING SHALL BE 0.81m)
SCAFFOLDING FRAME
A
GI PIPE OR SCAFFOLDING
FRAME
B B
SECTION A-A
SECTION B-B
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 17 OF 23
LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME G.A.D.I.SILVA ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE TIMBER FORMWORK SUPPORTING DETAILS FOR BOTTOM SLAB OF
DATE DATE OPEN RECTANGULAR CANAL AS SHOWN A3 -
PLATE : 018
STEEL FORMWORK PANEL FOR SIDE OF BOTTOM SLAB OF RECTANGULAR OPEN CANAL
ELEVATED RECTANGULAR OPEN CANAL
1500
150 300 300 300 300 150 375 750 375
50
Ø48mm GI BAR
150 50
50
3mm THICK
250
STEEL PLATE
300
150
STEEL FORMWORK
150
400
950
950
950
300
150
DETAIL-A
150
300
300
150
ELEVATION 3mm THICK SECTION ELEVATION SECTION
STEEL PLATE
PLAN
FALSWORK ARRANGEMENT
STEEL STEEL
FORMWORK FORMWORK
Ø12mm Ø12mm
THREADED BAR THREADED BAR
BUTTERFLY
NUT BUTTERFLY
P-CONE PVC PIPE
Ø48mm NUT
GI PIPE Ø48mm GI PIPE
NOTE
DETAIL-A (DETAIL 01) DETAIL-A (OPTION 02) 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS STATED OTHERWISE.
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 18 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE STEEL FORMWORK PANEL DETAILS FOR SIDE OF BOTTOM SLAB
AS SHOWN A3 -
DATE DATE OR RECTANGULAR CANAL
PLATE : 019
STEEL FORMWORK & FALSEWORK ARRANGEMENT FOR BOTTOM SLAB OF OPEN RECTANGULAR CANAL
(ELEVATED RECTANGULAR OPEN CANAL) GI PIPE WITH SCREW JACK FOR
HORIZONTAL SUPPORT OF SIDE GI PIPE OR
FORMWORK SCAFFOLDING FRAME
GI PIPE OR
SPACING SHALL BE 0.81m)
SCAFFOLDING FRAME
A
GI PIPE OR SCAFFOLDING
FRAME
B B
SECTION A-A
SECTION B-B
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 19 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE STEEL FORMWORK SUPPORTING DETAILS FOR BOTTOM SLAB OF
DATE DATE OPEN RECTANGULAR CANAL
AS SHOWN A3 -
PLATE : 020
1220
160 300 300 300 160
1170
125
175
15mm THICK
Ø48mm GI PIPE
PLYWOOD BOARD
250
Ø48mm
GI PIPE
600
600
250
1975
P-CONE
600
600
NUT
250
250
DETAIL-A
600
600
250
50
50 x 100mm TIMBER
1220
1170 Ø12mm
THREADED BAR
50 x 100mm TIMBER
BUTTERFLY
15mm THICK PLYWOOD PLAN PVC PIPE NUT
15mm THICK PLAN 50 x 100mm TIMBER
BOARD
PLYWOOD BOARD
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 20 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE TIMBER FORMWORK PANEL FOR WALLS
DATE DATE RECTANGULAR OPEN CANAL AS SHOWN A3 -
PLATE : 021
GI PIPE OR SCAFFOLDING
FRAME
GI PIPE OR SCAFFOLDING
FRAME
SECTIONAL VIEW
PLAN
NOTE:
1. PLEASE NOTE THAT IF THREAD BARS (INTERNAL SUPPORT) ARE
USED, THEN ACRO JACK SUPPORT ARE REQUIRED ONLY FOR
MAINTAIN THE VERTICALITY OF WALLS. HOWEVER THREAD BAR OR
ACRO JACK SUPPORTS SHOULD USE AT SPECIFIED SPACINGS.
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 21 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE TIMBER FORMWORK SUPPORTING DETAILS FOR
DATE DATE CANAL WALL FORMWORK
AS SHOWN A3 -
PLATE : 022
125
175
150
3mm THICK
150
STEEL PLATE
300
150
600
600
150
300
150
3mm THICK
STEEL PLATE
150
300
1975
150
600
600
150
300
DETAIL-A
150
150
300
150
600
600
150
300
150
50
3mm THICK STEEL PLATE
3mm THICK STEEL PLATE
ELEVATION
ELEVATION SECTION SECTION
1500
STEEL FORMWORK MODEL ARRANGEMENT
187.5 375 375 375 187.5
Ø48mm GI PIPE
STEEL STEEL
FORMWORK FORMWORK
3mm THICK STEEL PLATE THREADED BAR
Ø12mm Ø12mm
THREADED BAR THREADED BAR
PLAN
BUTTERFLY BUTTERFLY
P-CONE NUT PVC PIPE NUT FALSWORK ARRANGEMENT
Ø48mm
Ø48mm GI PIPE
GI PIPE
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 22 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE STEEL FORMWORK PANEL FOR WALLS
DATE DATE RECTANGULAR OPEN CANAL
AS SHOWN A3 -
PLATE : 023
GI PIPE OR SCAFFOLDING
FRAME
GI PIPE OR SCAFFOLDING
FRAME SECTIONAL VIEW
PLAN
NOTE:
1. PLEASE NOTE THAT IF THREAD BARS (INTERNAL SUPPORT) ARE
USED, THEN ACRO JACK SUPPORT ARE REQUIRED ONLY FOR
MAINTAIN THE VERTICALITY OF WALLS. HOWEVER THREAD BAR OR
ACRO JACK SUPPORTS SHOULD USE AT SPECIFIED SPACINGS.
CONSULTANT: CONTRACTOR:
EMPLOYER: LAHMEYER
REVISION
NORTH WESTERN PROVICE CANAL PROJECT
DATE: 14 MAR.2019
INTERNATIONAL GEOCONSULT
中国建筑股份有限公司
DEMOCRATIC SOCIALIST REPUBLIC OF DRAWINGS NO.
SRI LANKA IN ASSOCIATION WITH : Engineering CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD
NO. DATE DESCRIPTION NWPC/ICB-2
MINISTRY OF MAHAWELI
DEVELOPMENT AND ENVIRONMENT
Infotechs IDEAS
K N O W L E D G E . I N N O V A T I O N S . S O L U T I O N S .
Consultants (Pvt.)
Limited #33, 18/F Parkland Office Building, Park Street, Colombo 02 CONCSTRUCTION OF MAIN CANAL FROM NEBADIGAHAWATTA NW-I02-C-MS-08
CHECKED BY CHECKED BY APPROVED BY
DRAWN BY CHECKED BY RECOMMENDED BY
TO MAHAKITHULA RESERVOIR INLET TUNNEL
MAHAWELI WATER (SURVEYOR/DRF/CE) (CE / ARE) (RE / DE)
(FROM 5+250 km TO 22+300 km) SHEET: 23 OF 23
G.A.D.I.SILVA LI BO LI JIANSHUANG
SECURITY INVESMENT PROGRAM NAME NAME
ELEVATED RECTANGULAR OPEN CANAL SCALE: ORIGINAL REV.
SIGNATURE SIGNATURE STEEL FORMWORK SUPPORTING DETAILS FOR
DATE DATE CANAL WALL FORMWORK AS SHOWN A3 -
China State Construction Engineering Corporation Limited.
Doc. No : CSCEC/ITP/008
Rev. No : 00
Project : Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir
Inlet Tunnel (NWPCP ICB-2) Date : 20/03/2019
Employer : Ministry of Mahaweli Development and Environment (MMDE) Page : 1 of 07
Engineer : Program Management, Design and Supervision Consultant (PMDSC)
Contractor : China State Construction Engineering Corporation Limited.(CSCEC)
Reference sheet
Document Description
Method Statement MS 002 Rev A for surface excavation work
MS 008 Rev A for construction of elevated rectangular open canal
Revision history
Page 1 of 7
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (NWPCP ICB-2)
Doc. No. :CSCEC-ITP-008
INSPECTION AND TEST PLAN – CONSTRUCTION OF ELEVATED RECTANGULAR OPEN CANAL Date : 20.03.2019
Employer : Ministry of Mahaweli Development and Environment Engineer : Program Management, Design and Supervision Consultant Contractor : China State Construction Engineering Corp. Limited
Legends Used: CSCEC= China State Construction Engineering Corp. Limited PO=Procurement Officer SA=Site Agent TS=Technical Specification SC=Sub-contractor
QAM=Quality Assurance Manager H=Hold Point MS=Method Statement PS=Particular Specification ENG=Engineer
W=Witness Point SE/F=Site Engineer/Foreman P=Perform
Level of witness required
Description of works item on which Applicable Frequency of The for Inspection and /or Responsibility for
Inspection(s) &/or
Item
No.
the Inspection and/or Testing specification and clause Acceptance Criteria Inspection and/or verifying Testing signature(s) on
Test(s) required
Activity shall be carried out reference testing record(d) is SC CSCEC ENG verifying record(s)
Page 2 of 7
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (NWPCP ICB-2)
Doc. No. :CSCEC-ITP-008
INSPECTION AND TEST PLAN – CONSTRUCTION OF ELEVATED RECTANGULAR OPEN CANAL Date : 20.03.2019
Employer : Ministry of Mahaweli Development and Environment Engineer : Program Management, Design and Supervision Consultant Contractor : China State Construction Engineering Corp. Limited
Legends Used: CSCEC= China State Construction Engineering Corp. Limited PO=Procurement Officer SA=Site Agent TS=Technical Specification SC=Sub-contractor
QAM=Quality Assurance Manager H=Hold Point MS=Method Statement PS=Particular Specification ENG=Engineer
W=Witness Point SE/F=Site Engineer/Foreman P=Perform
Level of witness required
Description of works item on which Applicable Frequency of The for Inspection and /or Responsibility for
Inspection(s) &/or
Item
No.
the Inspection and/or Testing specification and clause Acceptance Criteria Inspection and/or verifying Testing signature(s) on
Test(s) required
Activity shall be carried out reference testing record(d) is SC CSCEC ENG verifying record(s)
C03 screed concrete pouring Project specification/ER jointly inspection Spread 75mm thick concrete Each location RFI H H W The Engineer
Section 3 required layer at foundation bottom Check list Site Engineer –CSCEC
MS 010 Rev A and
Detailed project design Maintain Even Flat form for
drawing the R/F work
D02 Chemical anchoring of 12mm Detailed project design Site inspection According to the Approved Each location before RFI H H W The Engineer
diameter road drawing required Design Drawings the pier starting the QA/QC Engineer -
MS 10 Rev A foundations should be reinforcement fixing CSCEC
Manufacture technical data anchored to the rock by Site Engineer -CSCEC
sheet 12mm diameter anchor road.
The anchoring depth shall be
300mm and chemical
anchoring method shall be
used
Page 3 of 7
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (NWPCP ICB-2)
Doc. No. :CSCEC-ITP-008
INSPECTION AND TEST PLAN – CONSTRUCTION OF ELEVATED RECTANGULAR OPEN CANAL Date : 20.03.2019
Employer : Ministry of Mahaweli Development and Environment Engineer : Program Management, Design and Supervision Consultant Contractor : China State Construction Engineering Corp. Limited
Legends Used: CSCEC= China State Construction Engineering Corp. Limited PO=Procurement Officer SA=Site Agent TS=Technical Specification SC=Sub-contractor
QAM=Quality Assurance Manager H=Hold Point MS=Method Statement PS=Particular Specification ENG=Engineer
W=Witness Point SE/F=Site Engineer/Foreman P=Perform
Level of witness required
Description of works item on which Applicable Frequency of The for Inspection and /or Responsibility for
Inspection(s) &/or
Item
No.
the Inspection and/or Testing specification and clause Acceptance Criteria Inspection and/or verifying Testing signature(s) on
Test(s) required
Activity shall be carried out reference testing record(d) is SC CSCEC ENG verifying record(s)
D03 Cutting ,Bending ,Placing and Fixing Project specification/ER Site inspection ▪ Bar sizes & spacing in Before each RFI H H W The Engineer
of reinforcement Section 3.3.3.2 required accordance with drawing / concrete pouring Check list Site Engineer -CSCEC
BS EN1992 design
Detailed project design ▪ Bars are properly fixed
drawing ▪ Correct lap lengths are
MS-10 Rev A provided
▪ Nominal covers are
maintained
▪ Free from loose rust, mill
scale, dried salt, release
agent or other
contamination
▪ Removal of all loose
Binding wires
▪ Compliance with structural
details (Position/Lapping/
Spacing/Links)
D04 Quality of the cover Blocks ICTAD SCA/4/1 Chapter Correct dimensions Once, before Check list
5.3.2.2 (Tolerance ± 5mm) placing the cover
BS: 8110 Section:3.1.1 • Using sand cement 1:2 ratio block
D05 Check formwork for concrete pouring Project specification/ER Site Inspection •Setting out Before each pouring RFI H H H The Engineer
Section 3.2 required • Line and level Check list Site Engineer -CSCEC
Relevant design drawings • Supporting arrangements
MS 010 Rev A and Adequacy
• Rigidity and water Tightness
• Formwork cleaned and
wetted properly
•Release agent properly
applied on correct surfaces
D06 Expansion Joint Project specification/ER Filling of these joints with Every Joint Check list
Section 3.8.2 resilient joint fillers
Detailed project design
drawing Concrete shall not be placed
MS-010 Rev A on both side of the joints at
the same time
Page 4 of 7
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (NWPCP ICB-2)
Doc. No. :CSCEC-ITP-008
INSPECTION AND TEST PLAN – CONSTRUCTION OF ELEVATED RECTANGULAR OPEN CANAL Date : 20.03.2019
Employer : Ministry of Mahaweli Development and Environment Engineer : Program Management, Design and Supervision Consultant Contractor : China State Construction Engineering Corp. Limited
Legends Used: CSCEC= China State Construction Engineering Corp. Limited PO=Procurement Officer SA=Site Agent TS=Technical Specification SC=Sub-contractor
QAM=Quality Assurance Manager H=Hold Point MS=Method Statement PS=Particular Specification ENG=Engineer
W=Witness Point SE/F=Site Engineer/Foreman P=Perform
Level of witness required
Description of works item on which Applicable Frequency of The for Inspection and /or Responsibility for
Inspection(s) &/or
Item
No.
the Inspection and/or Testing specification and clause Acceptance Criteria Inspection and/or verifying Testing signature(s) on
Test(s) required
Activity shall be carried out reference testing record(d) is SC CSCEC ENG verifying record(s)
D07 Concrete Delivery by CSCEC Plant Project specification/ER Slump Test, Correct concrete mix relevant Each concrete Concrete H H W The Engineer
Section 3.7 Concrete cube to the work concerned has delivery delivery note Site Engineer -CSCEC
Mix design Casting, and been delivered Check list
Concrete
temperature at site
D08 Slump test Mix design Testing Slump = 125mm (± 25mm) Every Section
BS EN 12350-2
D09 Temperature test Project specification/ER Testing Temperature of fresh Once before pour
Section 5.6 concrete does ( Only for special
Laboratory test plan not exceed 28° C Mix)
D10 Casting test cubes BS EN 12390-2 For Testing One sample consist 09 cubes Every 10m3 per one
Laboratory test plan test
Page 5 of 7
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (NWPCP ICB-2)
Doc. No. :CSCEC-ITP-008
INSPECTION AND TEST PLAN – CONSTRUCTION OF ELEVATED RECTANGULAR OPEN CANAL Date : 20.03.2019
Employer : Ministry of Mahaweli Development and Environment Engineer : Program Management, Design and Supervision Consultant Contractor : China State Construction Engineering Corp. Limited
Legends Used: CSCEC= China State Construction Engineering Corp. Limited PO=Procurement Officer SA=Site Agent TS=Technical Specification SC=Sub-contractor
QAM=Quality Assurance Manager H=Hold Point MS=Method Statement PS=Particular Specification ENG=Engineer
W=Witness Point SE/F=Site Engineer/Foreman P=Perform
Level of witness required
Description of works item on which Applicable Frequency of The for Inspection and /or Responsibility for
Inspection(s) &/or
Item
No.
the Inspection and/or Testing specification and clause Acceptance Criteria Inspection and/or verifying Testing signature(s) on
Test(s) required
Activity shall be carried out reference testing record(d) is SC CSCEC ENG verifying record(s)
E02 Compaction of concrete Project specification/ER Visually Inspection Skilled and experienced For each pouring Check list H H W The Engineer
Section 3.7.3 required workman will be employed Site Engineer -CSCEC
MS 010 Rev A Each concrete layer will be
completely vibrated before
another layer of concrete is
placed upon it.
Max. distance between two
points of compaction shall be
not exceed 600mm
No re-vibration after concrete
set.
E03 Form work check during concrete Project specification/ER Site Inspection Level of concreting Every pour Check list H H W The Engineer
pouring Section 3.7.3 Required • Line and level Site Engineer -CSCEC
• Supports
• Verticality
E04 Surface finish Project specification/ER Site Inspection Tolerance from correct Every pour Check list H H W The Engineer
Section 3.7.4 Required position indicated in design Site Engineer -CSCEC
MS 010 Rev A drawings
Out Side surface +20 to -20
In side surface tolerance +5
to -5
Part F – After concrete pouring
F01 Curing Project specification/ER Site Inspection Curing shall be done for a After every pouring H H W The Engineer
Section 3.11.5.3 Required minimum 7 days The curing method Site Engineer -CSCEC
MS 010 Rev A shall be water curing
or applying of a
curing agent
F02 Removal of formwork Project specification/ER Site Inspection • Sides of foundations, Every structure Check list H H W The Engineer
Section 3.2.2.6 Required column, beams and wall Site Engineer -CSCEC
MS 010 Rev A formworks are removed 2
days
Page 6 of 7
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (NWPCP ICB-2)
Doc. No. :CSCEC-ITP-008
INSPECTION AND TEST PLAN – CONSTRUCTION OF ELEVATED RECTANGULAR OPEN CANAL Date : 20.03.2019
Employer : Ministry of Mahaweli Development and Environment Engineer : Program Management, Design and Supervision Consultant Contractor : China State Construction Engineering Corp. Limited
Legends Used: CSCEC= China State Construction Engineering Corp. Limited PO=Procurement Officer SA=Site Agent TS=Technical Specification SC=Sub-contractor
QAM=Quality Assurance Manager H=Hold Point MS=Method Statement PS=Particular Specification ENG=Engineer
W=Witness Point SE/F=Site Engineer/Foreman P=Perform
Level of witness required
Description of works item on which Applicable Frequency of The for Inspection and /or Responsibility for
Inspection(s) &/or
Item
No.
the Inspection and/or Testing specification and clause Acceptance Criteria Inspection and/or verifying Testing signature(s) on
Test(s) required
Activity shall be carried out reference testing record(d) is SC CSCEC ENG verifying record(s)
F03 7 days strength Project specification/ER Compressive Test The 7, day's strength may be The average value H H W The Engineer
Section 3.5.6.7 taken to be 75% of the 28 of 3 cubes made Site Engineer -CSCEC
ICTAD Publication, day cube strength. from the same
SCAl4/1 section 5.4.9 sample
F04 28 days strength Project specification/ER Compressive Test 2 Mean of the two results The average value H H W The Engineer
Section 3.5.6.7 shall be taken as the test of 3 cubes made Site Engineer -CSCEC
ICTAD Publication, result from the same
SCAl4/1 section 5.4.9 sample
Approved laboratory test If 2 consecutive test results
plan (ie. A cube test) are checked,
BS EN 12390-2 the average should be 1
N/mm2 more than the
characteristic strength
specified for 28 days.
Similarly, for 3 consecutive
test results ~6 cubes results)
it will be +2N/mm and for 4
consecutive test results, it will
be +3 N/mm2
G01 Back Filling of Structure According to the approved Site Inspection Suitable material for Required section RFI H H W The Engineer
drawings required Backfilling compacted to Laboratory Site Engineer -CMC
And Site testing required densities. test reports
Page 7 of 7
RECORD SHEET FOR
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (NWPCP ICB-2)
CONSTRUCTION SETTING OUT
Employer: Ministry of Mahaweli Engineer: Program Management, Design and Supervision Contractor: China State Construction & SURVEY
Development and Environment Consultant (PMDSC) Engineering Corp. Limited Page No:
Position,Name,Date & Signature Position,Name,Date & Signature Position,Name,Date & Signature Position,Name,Date & Signature
Surveyed By: Calculated By: Certified By CSCEC: The Engineer
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservoir Inlet Tunnel (NWPCP ICB-2)
Employer: Ministry of Mahaweli Development and Environment
Engineer: Program Management, Design and Supervision Consultant (PMDSC)
Contractor: China State Construction Engineering Corp. Limited
INSPECTION SHEET FOR BEFORE BASEMENT PREPARATION
Structure: DATE : Element ID:
Item to inspect Evaluation Remarks
EXCAVATION
Setting out of area to be excavated Yes / N/A
Spread 75 mm thk Screed concrete layer under the foundation Yes / N/A
Maintain Even Flat form for the R/F work Yes / N/A
LOCATION SETTING OUT ON THE LEVELLING CONCRETE
Setting out of the structure on the leveling concrete surface Yes / N/A
Remarks:
Consultant Engineer
FORMWORK
Length of the formwork Yes / N/A
Width of the formwork Yes / N/A
Position of the formwork Yes / N/A
Check cleanliness / free of dirt, debris & wash water Yes / N/A
Forms release agent applied Yes / N/A
Level marked Yes / N/A
Sealed against grout leaking Yes / N/A
REINFORCEMENT
Approve Material Used Yes / N/A
R/F Free from loose rust and mill scale, dirt, oil, grease and paint Yes / N/A
Placed in positioning according to the Drawings Yes / N/A
Correct bar sizes / spacing Yes / N/A
Correct lap length Yes / N/A
Properly fixed Yes / N/A
Layer of Bar seperated by Spacer Bars (If Necessary) Yes / N/A
COVERING
Contractor :
Consultant Engineer
Contractor :
Consultant Engineer
CONCRETE POURING
Starting time
Horizontal concrete layer thickness not exceed required limits Yes / N/A
Concrete dropped high not exceed the required limits Yes / N/A
Finish time
Contractor :
Consultant Engineer
CONCRETE CURING
Approved method of curing used (Same method used for Mockup will be
applied on pile cap as agreed)
Yes / N/A
FORMWORK STRIKING
CONCRETE FINISH
Properly green cut the required surfaces (if applicable) Yes / N/A
Contractor :