0% found this document useful (0 votes)
112 views4 pages

Application Lifecycle MGT - Quiz 2

The document is a review of a quiz taken on project planning and tracking. It provides the questions asked in the quiz along with the answers selected. Based on the questions and answers, the following can be summarized: 1. The quiz covered topics related to project milestones, definition phases, integration testing cycles, KPI customization, testing cycles, refresh rates, milestones, scorecards, test lab modules, user acceptance testing, release scope, defect definitions, performance testing, and Gantt charts. 2. The student scored full marks on all questions, indicating answers were selected correctly relating to true/false and multiple choice questions about various project management and tracking terms and concepts. 3. The review
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
112 views4 pages

Application Lifecycle MGT - Quiz 2

The document is a review of a quiz taken on project planning and tracking. It provides the questions asked in the quiz along with the answers selected. Based on the questions and answers, the following can be summarized: 1. The quiz covered topics related to project milestones, definition phases, integration testing cycles, KPI customization, testing cycles, refresh rates, milestones, scorecards, test lab modules, user acceptance testing, release scope, defect definitions, performance testing, and Gantt charts. 2. The student scored full marks on all questions, indicating answers were selected correctly relating to true/false and multiple choice questions about various project management and tracking terms and concepts. 3. The review
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

8/19/2020 Prelim Quiz 2: Attempt review

Home / My courses / UGRD-CS6302-2013T / WEEK 4 : Project Planning and Tracking / Prelim Quiz 2

Started on Saturday, 1 August 2020, 4:16 PM


State Finished
Completed on Saturday, 1 August 2020, 4:20 PM
Time taken 3 mins 52 secs
Grade 20.00 out of 20.00 (100%)

Question 1 Milestones are used to measure progress in project planning and tracking.
Complete

Mark 1.00 out of


1.00 Select one:
True

False

Question 2 In the definition phase, the QA/project manager defines the scope, milestones, and KPIs for the project
Complete in ALM.
Mark 1.00 out of
1.00 Select one:
True

False

Question 3 Cycle 2 can start before the end of cycle 1.


Complete

Mark 1.00 out of Select one:


1.00
True

False

Question 4 This cycle tests the new features with existing features that might have been impacted by the changes.
Complete

Mark 1.00 out of Select one:


1.00
a. Cycle 1- New Features

b. Cycle 2-Integrated System Testing

c. Cycle 3-Performance Testing

d. Cycle 4-User Acceptance Testing

Question 5 You can not customize each KPI to reflect your needs.
Complete

Mark 1.00 out of


1.00 Select one:
True

False

https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=153688&cmid=1045 1/4
8/19/2020 Prelim Quiz 2: Attempt review

Question 6 Tests the new features of the application implemented in the release.
Complete

Mark 1.00 out of


1.00 Select one:
a. Cycle 3-Performance Testing

b. Cycle 1-New Features

c. Cycle 4-User Acceptance Testing

d. Cycle 2-Integrated System Testing

Question 7 Indicates whether the scheduled calculation is currently running.


Complete

Mark 1.00 out of Select one:


1.00
a. Set Refresh Rate

b. Enabled/Disabled

c. Apply settings

d. Active/Inactive

Question 8 _______are checkpoints on a release timeline used to verify that the release and its interim deliverables
Complete are progressing as planned.
Mark 1.00 out of
1.00

Select one:
a. Thresholds

b. Scoreboard

c. Milestones

d. Analysis

Question 9 Displays KPI calculations that enable you to determine the status of your release.
Complete

Mark 1.00 out of


1.00 Select one:
a. Content tab

b. Detailed tab

c. General tab

d. Scorecard tab

Question 10 A test set folder in the Test Lab module contains tests that are covered by your requirements.
Complete

Mark 1.00 out of Select one:


1.00
True

False

Question 11 This cycle ensures that the new features meet the expectations of the business.
Complete

Mark 1.00 out of


1.00 Select one:
a. Cycle 2-Integrated System Testing

b. Cycle 4-User Acceptance Testing



c. Cycle 3-Performance Testing

d C l 1N F
https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=153688&cmid=1045 2/4
8/19/2020 Prelim Quiz 2: Attempt review
d. Cycle 1-New Features

Question 12 The Release Scope tab enables you to define and update release scope items.
Complete

Mark 1.00 out of


1.00 Select one:
True

False

Question 13 The testing process begins with defining defect in the Management module.
Complete

Mark 1.00 out of Select one:


1.00
True

False

Question 14 Tests the performance of the application for criteria such as number of concurrent users that the
Complete application supports and the response time of the application.
Mark 1.00 out of
1.00 Select one:
a. Cycle 3-Performance Testing

b. Cycle 1- New Features

c. Cycle 4-User Acceptance Testing

d. Cycle 2-Integrated System Testing

Question 15 Displays the progress of a release in a Gantt chart.


Complete

Mark 1.00 out of Select one:


1.00
a. Detailed tab

b. Scorecard tab

c. Content tab

d. Master Plan tab

Question 16 If an application flaw is detected while running a test set, you can submit a defect. 
Complete

Mark 1.00 out of


1.00 Select one:
True

False

Question 17 When you assign a requirement to a cycle, the requirement is not automatically assigned to the release.
Complete

Mark 1.00 out of Select one:


1.00
True

False

https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=153688&cmid=1045 3/4
8/19/2020 Prelim Quiz 2: Attempt review

Question 18 After adding a cycle to a release, you specify the details for the cycle using the _____.
Complete

Mark 1.00 out of


1.00 Select one:
a. Button

b. Cycle tab

c. Attachment

d. Details tab

Question 19 ______ are the means for setting objectives on Project Planning and Tracking releases and for planning
Complete and tracking release progress towards these objectives throughout its duration.
Mark 1.00 out of
1.00

Select one:
a. Scoreboard

b. Analysis

c. Scope items

d. Thresholds

Question 20 The Detailed tab enables you to select content to include in the release scope item.
Complete

Mark 1.00 out of Select one:


1.00
True

False